Table 7 to Subpart VVVV of Part 63 - Applicability and Timing of Notifications  


Latest version.
  • Table 7 to Subpart VVVV of Part 63 - Applicability and Timing of Notifications

    As specified in § 63.5761(a), you must submit notifications according to the following table:

    If your facility - You must submit - By this date -
    1. Is an existing source subject to this subpart An initial notification containing the information specified in § 63.9(b)(2) No later than the dates specified in § 63.9(b)(2).
    2. Is a new source subject to this subpart The notifications specified in § 63.9(b) (3) to (5) No later than the dates specified § 63.9(b)(4) and (5).
    3. Qualifies for a compliance extension as specified in § 63.9(c) A request for a compliance extension as specified in § 63.9(c) No later than the dates specified in § 63.6(i).
    4. Is complying with organic HAP content limits, application equipment requirements; or MACT model point value averaging provisions A notification of compliance status as specified in § 63.9(h) No later than 30 calendar days after the end of the first 12-month averaging period after your facility's compliance date.
    5. Is complying by using an add-on control device a. notification of intent to conduct a performance test as specified in § 63.9(e) No later than the date specified in § 63.9(e).
    b. A notification of the date for the continuous monitoring system performance evaluation as specified in § 63.9(g) With the notification of intent to conduct a performance test.
    c. A notification of compliance status as specified in § 63.9(h) No later than 60 calendar days after the completion of the add-on control device performance test and continuous monitoring system performance evaluation.