Table 9 to Subpart VVVVVV of Part 63 - Applicability of General Provisions to Subpart VVVVVV


Latest version.
  • Table 9 to Subpart VVVVVV of Part 63 - Applicability of General Provisions to Subpart VVVVVV

    As required in § 63.11501(a), you must comply with the requirements of the NESHAP General Provisions (40 CFR part 63, subpart A) as shown in the following table.

    Citation Subject Applies to Subpart VVVVVV? Explanation
    63.1(a)(1), (a)(2), (a)(3), (a)(4), (a)(6), (a)(10)-(a)(12) (b)(1), (b)(3), (c)(1), (c)(2), (c)(5), (e) Applicability Yes
    63.1(a)(5), (a)(7)-(a)(9), (b)(2), (c)(3), (c)(4), (d) Reserved No
    63.2 Definitions Yes
    63.3 Units and Abbreviations Yes
    63.4 Prohibited Activities and Circumvention Yes
    63.5 Preconstruction Review and Notification Requirements Yes
    63.6(a), (b)(1)-(b)(5), (b)(7), (c)(1), (c)(2), (c)(5), (e)(1)(iii), (g), (i), (j) Compliance with Standards and Maintenance Requirements Yes
    63.6(b)(6), (c)(3), (c)(4), (d), (h)(3), (h)(5)(iv) Reserved No
    63.6(e)(1)(i) and (ii), (e)(3), and (f)(1) SSM Requirements No See § 63.11495(d) for general duty requirement.
    63.6(h)(1)-(h)(4), (h)(5)(i)-(h)(5)(iii), (h)(6)-(h)(9) No Subpart VVVVVV does not include opacity or visible emissions (VE) standards or require a continuous opacity monitoring system (COMS).
    63.7(a)(1), (a)(3), (a)(4), (c), (e)(4), and (f)-(h) Performance Testing Requirements Yes
    63.7(a)(2), (b), (d), (e)(2)-(e)(3) Performance Testing Schedule, Notification of Performance Test, Performance Testing Facilities, and Conduct of Performance Tests Yes/No Requirements apply if conducting test for metal HAP control; requirements in §§ 63.997(c)(1), (d), (e), and 63.999(a)(1) apply, as referenced in § 63.11496(g), if conducting test for organic HAP or hydrogen halide and halogen HAP control device.
    63.7(e)(1) Performance Testing No See § 63.11496(f)(3)(ii) if conducting a test for metal HAP emissions. See §§ 63.11496(g) and 63.997(e)(1) if conducting a test for continuous process vents or for hydrogen halide and halogen emissions. See §§ 63.11496(g) and 63.2460(c) if conducting a test for batch process vents.
    63.8(a)(1), (a)(4), (b), (c)(1)(ii), (c)(2)-(c)(3), (f)(1)-(5) Monitoring Requirements Yes
    63.8(a)(2) Monitoring Requirements No
    63.8(a)(3) Reserved No
    63.8(c)(1)(i) General Duty to Minimize Emissions and CMS Operation No
    63.8(c)(1)(iii) Requirement to Develop SSM Plan for CMS No
    63.8(c)(4) Yes Only for CEMS. CPMS requirements in 40 CFR part 63, subpart SS are referenced from § 63.11496. Requirements for COMS do not apply because subpart VVVVVV does not require COMS.
    63.8(c)(5) No Subpart VVVVVV does not require COMS.
    63.8(c)(6)-(c)(8), (d)(1)-(d)(2), (e), (f)(6) Yes Requirements apply only if you use a continuous emission monitoring system (CEMS) to demonstrate compliance with the alternative standard in § 63.11496(e).
    63.8(d)(3) Written Procedures for CMS Yes Requirement applies except for last sentence, which refers to an SSM plan. SSM plans are not required.
    63.8(g)(1)-(g)(4) Yes Data reduction requirements apply only if you use CEMS to demonstrate compliance with alternative standard in § 63.11496(e). COMS requirements do not apply. Requirement in § 63.8(g)(2) does not apply because data reduction for CEMS are specified in 40 CFR part 63, subpart FFFF.
    63.8(g)(5) No Data reduction requirements for CEMS are specified in § 63.2450(j)(4), as referenced from § 63.11496. CPMS requirements are specified in 40 CFR part 63, subpart SS, as referenced from § 63.11496.
    63.9(a), (b)(1), (b)(2), (b)(4), (b)(5), (c), (d), (e), (i) Notification Requirements Yes
    63.9(b)(3), (h)(4) Reserved No
    63.9(f) No Subpart VVVVVV does not contain opacity or VE limits.
    63.9(g) Yes Additional notification requirement applies only if you use CEMS to demonstrate compliance with alternative standard in § 63.11496(e).
    63.9(h)(1)-(h)(3), (h)(5)-(h)(6) Yes Except subpart VVVVVV does not contain opacity or VE limits.
    63.9(i) Yes
    63.9(j) Change in Information Already Provided No Notification of process changes that affect a compliance determination are required in § 63.11501(d)(4).
    63.10(a) Recordkeeping Requirements Yes
    63.10(b)(1) Yes
    63.10(b)(2)(i) Recordkeeping of Occurrence and Duration of Startups and Shutdowns No See § 63.11501(c)(8) for recordkeeping of occurrence and duration of each startup and shutdown for continuous process vents that are subpart to Table 3 to this subpart.
    63.10(b)(2)(ii) Recordkeeping of Malfunctions No See § 63.11501(c)(1)(vii) and (viii) for recordkeeping of (1) date, time, duration, and volume of excess emissions and (2) actions taken during malfunction.
    63.10(b)(2)(iii) Maintenance Records Yes
    63.10(b)(2)(iv) and (v) Actions Taken to Minimize Emissions During SSM No
    63.10(b)(2)(vi), (x), (xi), (xiii) Yes Apply only if you use CEMS to demonstrate compliance with alternative standard in § 63.11496(e).
    63.10(b)(2)(vii)-(b)(2)(ix), (b)(2)(xii), (b)(2)(xiv) Yes
    63.10(b)(3) Yes
    63.10(c)(1), (c)(5)-(c)(6), (c)(13)-(c)(14) Yes Apply only if you use CEMS to demonstrate compliance with alternative standard in § 63.11496(e).
    63.10(c)(7)-(8) Additional Recordkeeping Requirements for CMS - Identifying Exceedances and Excess Emissions Yes
    63.10(c)(10) Recordkeeping Nature and Cause of Malfunctions No See § 63.11501(c)(1)(vii) and (viii) for malfunctions recordkeeping requirements.
    63.10(c)(11) Recording Corrective Actions No See § 63.11501(c)(1)(vii) and (viii) for malfunctions recordkeeping requirements.
    63.10(c)(12) Yes
    63.10(c)(15) Use of SSM Plan No
    63.10(c)(2)-(c)(4), (c)(9) Reserved No
    63.10(d)(1), (d)(2), (d)(4), (e)(1), (e)(2), (f) Reporting Requirements Yes
    63.10(d)(3) No Subpart VVVVVV does not include opacity or VE limits.
    63.10(d)(5) SSM Reports No See § 63.11501(d)(8) for reporting requirements for malfunctions.
    63.10(e)(1)-(e)(2) Yes Apply only if you use CEMS to demonstrate compliance with alternative standard in § 63.11496(e).
    63.10(e)(3) Yes
    63.10(e)(4) No Subpart VVVVVV does not include opacity or VE limits.
    63.11 Control Device Requirements Yes
    63.12 State Authorities and Delegations Yes
    63.13 Addresses Yes
    63.14 Incorporations by Reference Yes
    63.15 Availability of Information and Confidentiality Yes
    63.16 Performance Track Provisions Yes

    [74 FR 56041, Oct. 29, 2009, as amended at 77 FR 75762, Dec. 21, 2012]