Part 270 - EPA Administered Permit Programs: the Hazardous Waste Permit Program  


Subpart A - General Information
§ 270.1 - Purpose and scope of the regulations in this part.
§ 270.2 - Definitions.
§ 270.3 - Considerations under Federal law.
§ 270.4 - Effect of a permit.
§ 270.5 - Noncompliance and program reporting by the Director.
§ 270.6 - References.
Subpart B - Permit Application
§ 270.10 - General application requirements.
§ 270.11 - Signatories to permit applications and reports.
§ 270.12 - Confidentiality of information.
§ 270.13 - Contents of part A of the permit application.
§ 270.14 - Contents of part B: General requirements.
§ 270.15 - Specific part B information requirements for containers.
§ 270.16 - Specific part B information requirements for tank systems.
§ 270.17 - Specific part B information requirements for surface impoundments.
§ 270.18 - Specific part B information requirements for waste piles.
§ 270.19 - Specific part B information requirements for incinerators.
§ 270.20 - Specific part B information requirements for land treatment facilities.
§ 270.21 - Specific part B information requirements for landfills.
§ 270.22 - Specific part B information requirements for boilers and industrial furnaces burning hazardous waste.
§ 270.23 - Specific part B information requirements for miscellaneous units.
§ 270.24 - Specific part B information requirements for process vents.
§ 270.25 - Specific part B information requirements for equipment.
§ 270.26 - Special part B information requirements for drip pads.
§ 270.27 - Specific Part B information requirements for air emission controls for tanks, surface impoundments, and containers.
§ 270.28 - Part B information requirements for post-closure permits.
§ 270.29 - Permit denial.
Subpart C - Permit Conditions
§ 270.30 - Conditions applicable to all permits.
§ 270.31 - Requirements for recording and reporting of monitoring results.
§ 270.32 - Establishing permit conditions.
§ 270.33 - Schedules of compliance.
Subpart D - Changes to Permit
§ 270.40 - Transfer of permits.
§ 270.41 - Modification or revocation and reissuance of permits.
§ 270.42 - Permit modification at the request of the permittee.
§ 270.43 - Termination of permits.
Subpart E - Expiration and Continuation of Permits
§ 270.50 - Duration of permits.
§ 270.51 - Continuation of expiring permits.
Subpart F - Special Forms of Permits
§ 270.60 - Permits by rule.
§ 270.61 - Emergency permits.
§ 270.62 - Hazardous waste incinerator permits.
§ 270.63 - Permits for land treatment demonstrations using field test or laboratory analyses.
§ 270.64 - Interim permits for UIC wells.
§ 270.65 - Research, development, and demonstration permits.
§ 270.66 - Permits for boilers and industrial furnaces burning hazardous waste.
§ 270.67 - RCRA standardized permits for storage and treatment units.
§ 270.68 - Remedial Action Plans (RAPs).
Subpart G - Interim Status
§ 270.70 - Qualifying for interim status.
§ 270.71 - Operation during interim status.
§ 270.72 - Changes during interim status.
§ 270.73 - Termination of interim status.
Subpart H - Remedial Action Plans (RAPs)
§ 270.79 - Why is this subpart written in a special format?
Operating Under Your Rap
§ 270.210 - What records must I maintain concerning my RAP?
§ 270.215 - How are time periods in the requirements in this subpart and my RAP computed?
§ 270.220 - How may I transfer my RAP to a new owner or operator?
§ 270.225 - What must the State or EPA Region report about noncompliance with RAPs?
General Information
§ 270.80 - What is a RAP?
§ 270.85 - When do I need a RAP?
§ 270.90 - Does my RAP grant me any rights or relieve me of any obligations?
Getting a Rap Approved
§ 270.130 - What is the process for approving or denying my application for a RAP?
§ 270.135 - What must the Director include in a draft RAP?
§ 270.140 - What else must the Director prepare in addition to the draft RAP or notice of intent to deny?
§ 270.145 - What are the procedures for public comment on the draft RAP or notice of intent to deny?
§ 270.150 - How will the Director make a final decision on my RAP application?
§ 270.155 - May the decision to approve or deny my RAP application be administratively appealed?
§ 270.160 - When does my RAP become effective?
§ 270.165 - When may I begin physical construction of new units permitted under the RAP?
Applying for a Rap
§ 270.95 - How do I apply for a RAP?
§ 270.100 - Who must obtain a RAP?
§ 270.105 - Who must sign the application and any required reports for a RAP?
§ 270.110 - What must I include in my application for a RAP?
§ 270.115 - What if I want to keep this information confidential?
§ 270.120 - To whom must I submit my RAP application?
§ 270.125 - If I submit my RAP application as part of another document, what must I do?
How May My Rap Be Modified, Revoked and Reissued, or Terminated?
§ 270.170 - After my RAP is issued, how may it be modified, revoked and reissued, or terminated?
§ 270.175 - For what reasons may the Director choose to modify my final RAP?
§ 270.180 - For what reasons may the Director choose to revoke and reissue my final RAP?
§ 270.185 - For what reasons may the Director choose to terminate my final RAP, or deny my renewal application?
§ 270.190 - May the decision to approve or deny a modification, revocation and reissuance, or termination of my RAP be administratively appealed?
§ 270.195 - When will my RAP expire?
§ 270.200 - How may I renew my RAP if it is expiring?
§ 270.205 - What happens if I have applied correctly for a RAP renewal but have not received approval by the time my old RAP expires?
Obtaining a Rap for an off-Site Location
§ 270.230 - May I perform remediation waste management activities under a RAP at a location removed from the area where the remediation wastes originated?
Subpart I - Integration with Maximum Achievable Control Technology (MACT) Standards
§ 270.235 - Options for incinerators, cement kilns, lightweight aggregate kilns, solid fuel boilers, liquid fuel boilers and hydrochloric acid production furnaces to minimize emissions from startup, shutdown, and malfunction events.
Subpart J - RCRA Standardized Permits for Storage and Treatment Units
Modifying a Standardized Permit
§ 270.320 - How do I modify my RCRA standardized permit?
General Information About Standardized Permits
§ 270.250 - What is a RCRA standardized permit?
§ 270.255 - Who is eligible for a standardized permit?
§ 270.260 - What requirements of part 270 apply to a standardized permit?
Information That Must Be Kept at Your Facility
§ 270.290 - What general types of information must I keep at my facility?
§ 270.300 - What container information must I keep at my facility?
§ 270.305 - What tank information must I keep at my facility?
§ 270.310 - What equipment information must I keep at my facility?
§ 270.315 - What air emissions control information must I keep at my facility?
Applying for a Standardized Permit
§ 270.270 - How do I apply for a standardized permit?
§ 270.275 - What information must I submit to the permitting agency to support my standardized permit application?
§ 270.280 - What are the certification requirements?