§ 35.925-15 - Treatment of industrial wastes.  


Latest version.
  • That the allowable project costs do not include (a) costs of interceptor or collector lines constructed exclusively, or almost exclusively, to serve industrial sources or (b) costs allocable to the treatment for control or removal of pollutants in wastewater introduced into the treatment works by industrial sources, unless the applicant is required to remove such pollutants introduced from nonindustrial sources. The project must be included in a complete waste treatment system, a principal purpose of which project (as defined by the Regional Administrator; see §§35.903 (d) and 35.905) and system is the treatment of domestic wastes of the entire community, area, region or the district concerned. See the pretreatment regulations in part 403 of this chapter and §35.907.

    [44 FR 39340, July 5, 1979]