§ 35.935-4 - Step 2=3 projects.  


Latest version.
  • A grantee which has received step 2=3 grant assistance must make submittals required by §35.920-3(c), together with approvable user charge and industrial cost recovery systems and a preliminary plan of operation. The Regional Administrator shall give written approval of these submittals before advertising for bids on the step 3 construction portion of the step 2=3 project. The cost of step 3 work initiated before such approval is not allowable. Failure to make the above submittals as required is cause for invoking sanctions under §35.965.