§ 51.432 - Criteria and procedures: Motor vehicle emissions budget (project not from a plan and TIP).  


Latest version.
  • (a) The project which is not from a conforming transportation plan and a conforming TIP must be consistent with the motor vehicle emissions budget(s) in the applicable implementation plan (or implementation plan submission). This criterion applies during the transitional period and the control strategy and maintenance periods, except as provided in § 51.464. It is satisfied if emissions from the implementation of the project, when considered with the emissions from the projects in the conforming transportation plan and TIP and all other regionally significant projects expected in the area, do not exceed the motor vehicle emissions budget(s) in the applicable implementation plan (or implementation plan submission).

    (b) For areas with a conforming transportation plan that meets the content requirements of § 51.404(a):

    (1) This criterion may be satisfied without additional regional analysis if the project is included in the conforming transportation plan, even if it is not specifically included in the latest conforming TIP. This requires a demonstration that:

    (i) Allocating funds to the project will not delay the implementation of projects in the transportation plan or TIP which are necessary to achieve the highway and transit system envisioned by the transportation plan in each of its horizon years;

    (ii) The project is not regionally significant or is part of the specific highway or transit system envisioned in the transportation plan's horizon years; and

    (iii) The design concept and scope of the project is not significantly different from that described in the transportation plan.

    (2) If the requirements in paragraph (b)(1) of this section are not met, a regional emissions analysis must be performed as follows:

    (i) The analysis methodology shall meet the requirements of § 51.452;

    (ii) The analysis shall estimate emissions from the transportation system, including the proposed project and all other regionally significant projects expected in the nonattainment or maintenance area in the timeframe of the transportation plan. The analysis must include emissions from all previously approved projects which were not from a transportation plan and TIP; and

    (iii) The emissions analysis shall meet the requirements of §§ 51.428(b)(1), 51.428(b)(4), and 51.428(c).

    (c) For areas with a transportation plan that does not meet the content requirements of § 51.404(a), a regional emissions analysis must be performed for the project together with the conforming TIP and all other regionally significant projects expected in the nonattainment or maintenance area. This criterion may be satisfied if:

    (1) The analysis methodology meets the requirements of § 51.452(c);

    (2) The analysis estimates emissions from the transportation system, including the proposed project, and all other regionally significant projects expected in the nonattainment or maintenance area in the timeframe of the transportation plan; and

    (3) The regional analysis satisfies the requirements of §§ 51.428(b)(1), 51.428(b)(5), and 51.428(c).