§ 52.2428 Control Strategy: Carbon monoxide and ozone.  


Latest version.
  • (a) Determination—EPA has determined that, as of November 5, 1997, the Richmond ozone nonattainment area, which consists of the counties of Chesterfield, Hanover, Henrico, and part of Charles City County, and of the cities of Richmonds, Colonial Heights and Hopewell, has attained the 1-hour .12 ppm ozone standard based on three years of air quality data for 1993, 1994 and 1995. EPA has further determined that the reasonable further progress and attainment demonstration requirements of section 182(b)(1) and related requirements of section 172(c)(9) of the Clean Air Act do not apply to the Richmond area for so long as the area does not monitor any violations of the 1-hour .12ppm ozone standard, or until the area is no longer designated nonattainment. If a violation of the ozone NAAQS is monitored in the Richmond ozone nonattainment area while the area is designated nonattainment, these determinations shall no longer apply.

    (b) EPA approves the Commonwealth's 15 Percent Rate of Progress Plan for the Virginia portion of the Metropolitan Washington, D.C. ozone nonattainment area, submitted by the Acting Director of the Virginia Department of the Environmental Quality on April 14, 1998.

    (c)-(d) [Reserved]

    (e) Based upon EPA's review of the air quality data for the 3-year period 2003 to 2005, EPA has determined that the Washington, DC severe 1-hour ozone nonattainment area attained the 1-hour ozone NAAQS by the applicable attainment date of November 15, 2005. EPA also has determined that the Washington, DC severe 1-hour ozone nonattainment area is not subject to the imposition of the section 185 penalty fees.

    (f) EPA approves revisions to the Virginia State Implementation Plan consisting of the 2008 reasonable further progress (RFP) plan, reasonably available control measures, and contingency measures for the Washington, DC-MD-VA 1997 8-hour ozone moderate nonattainment area submitted by the Director of the Virginia Department of Environment Quality on June 12, 2007.

    (g) EPA approves the following 2008 RFP motor vehicle emissions budgets (MVEBs) for the Washington, DC-MD-VA 1997 8-hour ozone moderate nonattainment area submitted by the Director of the Virginia Department of Environment Quality on June 12, 2007:

    (h) Determination of attainment. EPA has determined, as of February 28, 2012, that based on 2007 to 2009 and 2008 to 2010 ambient air quality data, the Washington, DC-MD-VA moderate nonattainment area has attained the 1997 8-hour ozone National Ambient Air Quality Standard (NAAQS). This determination, in accordance with 40 CFR 51.918, suspends the requirements for this area to submit an attainment demonstration, associated reasonably available control measures, a reasonable further progress plan, contingency measures, and other planning SIPs related to attainment of the standard for as long as this area continues to meet the 1997 8-hour ozone NAAQS.

    (i) As of October 10, 2014, EPA approves the removal of the Stage II vapor recovery program from the maintenance plans for the Richmond 1990 1-Hour Ozone Maintenance Area and the Richmond-Petersburg 1997 8-Hour Ozone Maintenance Area.

    (j) EPA approves revisions to the Virginia State Implementation Plan consisting of the attainment demonstration required under 40 CFR 51.908 demonstrating attainment of the 1997 ozone NAAQS by the applicable attainment date of June 15, 2010 and the failure to attain contingency measures for the Washington, DC-MD-VA 1997 8-hour ozone moderate nonattainment area submitted by the Director of the Virginia Department of Environment Quality on June 12, 2007.

    (k) EPA approves the following 2009 attainment demonstration and 2010 motor vehicle emissions budgets (MVEBs) for the Washington, DC-MDVA 1997 8-hour ozone moderate nonattainment area submitted by the Director of the Virginia Department of Environment Quality on June 12, 2007:

    (l) As of May 26, 2015, EPA approves the removal of the Stage II vapor recovery program from the attainment plans for the Virginia portion of the Washington DC-MD-VA 1990 1-hour and 1997 8-hour Ozone NAAQS Nonattainment Areas and from the maintenance plan for the Fredericksburg 1997 8-Hour Ozone Maintenance Area.

    [62 FR 52032, Oct. 6, 1997, as amended at 65 FR 59731, Oct. 6, 2000; 66 FR 632, Jan. 3, 2001; 69 FR 43522, July 21, 2004; 73 FR 43362, July 25, 2008; 76 FR 58120, Sept. 20, 2011; 77 FR 11741, Feb. 28, 2012; 79 FR 46714, Aug. 11, 2014; 80 FR 19219, Apr. 10, 2015; 80 FR 29963, May 26, 2015]

[62 FR 52032, Oct. 6, 1997, as amended at 65 FR 59731, Oct. 6, 2000; 66 FR 632, Jan. 3, 2001; 69 FR 43522, July 21, 2004; 73 FR 43362, July 25, 2008; 76 FR 58120, Sept. 20, 2011; 77 FR 11741, Feb. 28, 2012; 79 FR 46714, Aug. 11, 2014; 80 FR 19219, Apr. 10, 2015; 80 FR 29963, May 26, 2015