Code of Federal Regulations (Last Updated: July 5, 2024) |
Title 40 - Protection of Environment |
Chapter I - Environmental Protection Agency |
SubChapter C - Air Programs |
Part 52 - Approval and Promulgation of Implementation Plans |
Subpart B - Alabama |
§ 52.50 - Identification of plan.
-
§ 52.50 Identification of plan.
(a) Purpose and scope. This section sets forth the applicable State implementation plan for Alabama under section 110 of the Clean Air Act, 42 U.S.C. 7401, and 40 CFR part 51 to meet national ambient air quality standards.
(b) Incorporation by reference.
(1) Material listed in paragraphs (c) and (d) of this section with an EPA approval date prior to August 31, 2022, for Alabama was approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Materials are incorporated as it exists on the date of the approval and notice of any change in the material will be published in the Federal Register. Entries in paragraphs (c) and (d) of this section with EPA approval dates after August 31, 2022, for Alabama will be incorporated by reference in the next update to the SIP compilation.
(2) EPA Region 4 certifies that the rules/regulations provided by EPA in the SIP compilation at the addresses in paragraph (b)(3) of this section are an exact duplicate of the officially promulgated State rules/regulations which have been approved as part of the State Implementation Plan as of the dates referenced in paragraph (b)(1) of this section.
(3) Copies of the materials incorporated by reference may be inspected at the Region 4 EPA Office at 61 Forsyth Street SW, Atlanta, GA 30303. To obtain the material, please call (404) 562–9022. You may also inspect the material with an EPA approval date prior to August 31, 2021, for Alabama, at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, please email fedreg.legal@nara.gov or go to: http://www.archives.gov/federal-register/cfr/ibr-locations.html.
(c) EPA-Approved Alabama Regulations.
Table 1 to Paragraph (c)—EPA-Approved Alabama Regulations
State citation Title/subject State
effective
dateEPA approval date Explanation Chapter No. 335–1–1 Organization Section 335–1–1–.03 Organization and Duties of the Commission 12/8/2017 7/6/2018, 83 FR 31454 Section 335–1–1–.04 Organization of the Department 12/8/2017 7/6/2018, 83 FR 31454 Chapter No. 335–3–1 General Provision Section 335–3–1–.01 Purpose 6/22/1989 3/19/1990, 55 FR 10062 Section 335–3–1–.02 Definitions 4/13/2020 9/21/2020, 85 FR 59192 Section 335–3–1–.03 Ambient Air Quality Standards 10/13/1998 3/1/1999, 64 FR 9918 Section 335–3–1–.04 Monitoring, Records, and Reporting 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–1–.05 Sampling and Testing Methods 6/22/1989 3/19/1990, 55 FR 10062 Section 335–3–1–.06 Compliance Schedule 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–1–.07 Maintenance and Malfunctioning of Equipment; Reporting 10/15/1989 3/19/1990, 55 FR 10062 Section 335–3–1–.08 Prohibition of Air Pollution 8/10/2000 12/8/2000, 65 FR 76938 Section 335–3–1–.09 Variances 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–1–.10 Circumvention 6/22/1989 3/19/1990, 55 FR 10062 Section 335–3–1–.11 Severability 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–1–.12 Bubble Provision 6/22/1989 3/19/1990, 55 FR 10062 Section 335–3–1–.13 Credible Evidence 4/13/1999 11/3/1999, 64 FR 59633 Section 335–3–1–.15 Emissions Inventory Reporting Requirements 4/3/2003 4/24/2003, 68 FR 20077 Chapter No. 335–3–2 Air Pollution Emergency Section 335–3–2–.01 Air Pollution Emergency 6/22/1989 3/19/1990, 55 FR 10062 Section 335–3–2–.02 Episode Criteria 8/10/2000 12/8/2000, 65 FR 76938 Section 335–3–2–.03 Special Episode Criteria 6/22/1989 3/19/1990, 55 FR 10062 Section 335–3–2–.04 Emission Reduction Plans 6/22/1989 3/19/1990, 55 FR 10062 Section 335–3–2–.05 Two Contaminant Episode 6/22/1989 3/19/1990, 55 FR 10062 Section 335–3–2–.06 General Episodes 6/22/1989 3/19/1990, 55 FR 10062 Section 335–3–2–.07 Local Episodes 6/22/1989 3/19/1990, 55 FR 10062 Section 335–3–2–.08 Other Sources 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–2–.09 Other Authority Not Affected 6/22/1989 3/19/1990, 55 FR 10062 Chapter No. 335–3–3 Control of Open Burning and Incineration Section 335–3–3–.01 Open Burning 1/22/2008 9/15/2008, 73 FR 53134 Section 335–3–3–.02 Incinerators 6/22/1989 3/19/1990, 55 FR 10062 Section 335–3–3–.03 Incineration of Wood, Peanut, and Cotton Ginning Waste 8/10/2000 12/8/2000, 65 FR 76938 Chapter No. 335–3–4 Control of Particulate Emissions Section 335–3–4–.01 Visible Emissions 9/30/2008 10/15/2008, 73 FR 60957 Section 335–3–4–.02 Fugitive Dust and Fugitive Emissions 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–4–.03 Fuel Burning Equipment 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–4–.04 Process Industries—General 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–4–.05 Small Foundry Cupola 6/22/1989 3/19/1990, 55 FR 10062 Section 335–3–4–.06 Cotton Gins 6/22/1989 3/19/1990, 55 FR 10062 Section 335–3–4–.07 Kraft Pulp Mills 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–4–.08 Wood Waste Boilers 6/9/2017 10/13/2017, 82 FR 47631 Section 335–3–4–.09 Coke Ovens 8/10/2000 12/8/2000, 65 FR 76938 Section 335–3–4–.10 Primary Aluminum Plants 6/22/1989 3/19/1990, 55 FR 10062 Section 335–3–4–.11 Cement Plants 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–4–.12 Xylene Oxidation Process 6/22/1989 3/19/1990, 55 FR 10062 Section 335–3–4–.13 Sintering Plants 6/22/1989 3/19/1990, 55 FR 10062 Section 335–3–4–.14 Grain Elevators 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–4–.15 Secondary Lead Smelters 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–4–.17 Steel Mills Located in Etowah County 10/15/1996 6/6/1997, 62 FR 30991 Chapter No. 335–3–5 Control of Sulfur Compound Emissions Section 335–3–5–.01 Fuel Combustion 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–5–.02 Sulfuric Acid Plants 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–5–.03 Petroleum Production 8/10/2000 12/8/2000, 65 FR 76938 Section 335–3–5–.04 Kraft Pulp Mills 8/10/2000 12/8/2000, 65 FR 76938 Section 335–3–5–.05 Process Industries—General 6/22/1989 3/19/1990, 55 FR 10062 Section 335–3–5–.06 TR SO2 Trading Program—Purpose and Definitions 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–5–.07 TR SO2 Trading Program—Applicability 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–5–.08 TR SO2 Trading Program—Retired Unit Exemption 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–5–.09 TR SO2 Trading Program—Standard Requirements 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–5–.10 TR SO2 Trading Program—Computation of Time 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–5–.11 Administrative Appeal Procedures 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–5–.12 SO2 Trading Budgets and Variability Limits 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–5–.13 TR SO2 Allowance Allocations 12/7/2018 3/12/2020, 85 FR 14418 Section 335–3–5–.14 Authorization of Designated Representative and Alternate Designated Representative 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–5–.15 Responsibilities of Designated Representative and Alternate Designated Representative 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–5–.16 Changing Designated Representative and Alternate Designated Representative; Changes in Owners and Operators; Changes in Units at the Source 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–5–.17 Certificate of Representation 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–5–.18 Objections Concerning Designated Representative and Alternate Designated Representative 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–5–.19 Delegation by Designated Representative and Alternate Designated Representative 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–5–.21 Establishment of Compliance Accounts, Assurance Accounts, and General Accounts 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–5–.22 Recordation of TR SO2 Allowance Allocations and Auction Results 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–5–.23 Submission of TR SO2 Allowance Transfers 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–5–.24 Recordation of TR SO2 Allowance Transfers 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–5–.25 Compliance with TR SO2 Emissions Limitation 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–5–.26 Compliance with TR SO2 Assurance Provisions 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–5–.27 Banking 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–5–.28 Account Error 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–5–.29 Administrator's Action on Submissions 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–5–.31 General Monitoring, Recordkeeping, and Reporting Requirements 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–5–.32 Initial Monitoring System Certification and Recertification Procedures 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–5–.33 Monitoring System Out–of–Control Periods 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–5–.34 Notifications Concerning Monitoring 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–5–.35 Recordkeeping and Reporting 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–5–.36 Petitions for Alternatives to Monitoring, Recordkeeping, or Reporting Requirements 11/24/2015 8/31/2016, 81 FR 59869 Chapter No. 335–3–6 Control of Organic Emissions Section 335–3–6–.01 Applicability 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–6–.02 VOC Water Separation 4/15/1987 9/27/1993, 58 FR 50262 Section 335–3–6–.03 Loading and Storage of VOC 4/15/1987 9/27/1993, 58 FR 50262 Section 335–3–6–.04 Fixed-Roof Petroleum Liquid Storage Vessels 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–6–.05 Bulk Gasoline Plants 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–6–.06 Bulk Gasoline Terminals 8/10/2000 12/8/2000, 65 FR 76938 Section 335–3–6–.07 Gasoline Dispensing Facilities—Stage I 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–6–.08 Petroleum Refinery Sources 6/22/1989 3/19/1990, 55 FR 10062 Section 335–3–6–.09 Pumps and Compressors 6/22/1989 3/19/1990, 55 FR 10062 Section 335–3–6–.10 Ethylene Producing Plants 6/22/1989 3/19/1990, 55 FR 10062 Section 335–3–6–.11 Surface Coating 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–6–.12 Solvent Metal Cleaning 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–6–.13 Cutback Asphalt 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–6–.14 Petition for Alternative Controls 6/22/1989 3/19/1990, 55 FR 10062 Section 335–3–6–.15 Compliance Schedules 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–6–.16 Test Methods and Procedures 8/10/2000 12/8/2000, 65 FR 76938 Section 335–3–6–.17 Manufacture of Pneumatic Rubber Tires 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–6–.18 Manufacture of Synthesized Pharmaceutical Products 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–6–.20 Leaks from Gasoline Tank Trucks and Vapor Collection Systems 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–6–.21 Leaks from Petroleum Refinery Equipment 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–6–.22 Graphic Arts 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–6–.23 Petroleum Liquid Storage in External Floating Roof Tanks 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–6–.24 Applicability 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–6–.25 VOC Water Separation 6/22/1989 3/19/1990, 55 FR 10062 Section 335–3–6–.26 Loading and Storage of VOC 4/15/1987 9/27/1993, 58 FR 50262 Section 335–3–6–.27 Fixed-Roof Petroleum Liquid Storage Vessels 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–6–.28 Bulk Gasoline Plants 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–6–.29 Gasoline Terminals 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–6–.30 Gasoline Dispensing Facilities Stage 1 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–6–.31 Petroleum Refinery Sources 4/15/1987 9/27/1993, 58 FR 50262 Section 335–3–6–.32 Surface Coating 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–6–.33 Solvent Metal Cleaning 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–6–.34 Cutback and Emulsified Asphalt 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–6–.35 Petition for Alternative Controls 4/15/1987 9/27/1993, 58 FR 50262 Section 335–3–6–.36 Compliances Schedules 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–6–.37 Test Methods and Procedures 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–6–.38 Reserved 7/31/1991 9/27/1993, 58 FR 50262 Section 335–3–6–39 Manufacture of Synthesized Pharmaceutical Products 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–6–41 Leaks from Gasoline Tank Trucks and Vapor Collection Systems 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–6–42 Reserved 7/31/1991 9/27/1993, 58 FR 50262 Section 335–3–6–43 Graphic Arts 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–6–44 Petroleum Liquid Storage in External Floating Roof Tanks 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–6–45 Large Petroleum Dry Cleaners 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–6–46 Reserved 7/31/1991 9/27/1993, 58 FR 50262 Section 335–3–6–47 Leaks From Coke By-product Recovery Plant Equipment 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–6–48 Emissions From Coke By-product Recovery Plant Coke Oven Gas Bleeder 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–6–49 Manufacture of Laminated Countertops 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–6–50 Paint Manufacture 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–6–53 List of EPA Approved and Equivalent Test Methods and Procedures for the Purpose of Determining VOC Emissions 10/15/1996 6/6/1997, 62 FR 30991 Chapter No. 335–3–7 Carbon Monoxide Emissions Section 335–3–7–01 Metals Production 6/22/1989 3/19/1990, 55 FR 10062 Section 335–3–7–02 Petroleum Processes 6/22/1989 3/19/1990, 55 FR 10062 Chapter No. 335–3–8 Control of Nitrogen Oxide Emissions Section 335–3–8–01 Standards for Portland Cement Kilns 4/6/2001 7/17/2001, 66 FR 36919 Section 335–3–8–02 Nitric Acid Manufacturing 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–8–03 NOX Emissions from Electric Utility Generating Units 10/24/2000 11/7/2001, 66 FR 56223 Section 335–3–8–04 Standards for Stationary Reciprocating Internal Combustion Engines 3/22/2005 12/28/2005, 70 FR 76694 Section 335–3–8–05 New Combustion Sources 1/16/2012 7/7/2021, 86 FR 35610 Section 335–3–8–07 TR NOX Annual Trading Program—Purpose and Definitions 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–8–08 TR NOX Annual Trading Program—Applicability 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–8–09 TR NOX Annual Trading Program—Retired Unit Exemption 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–8–10 TR NOX Annual Trading Program—Standard Requirements 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–8–11 TR NOX Annual Trading Program—Computation of Time 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–8–12 Administrative Appeal Procedures 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–8–13 NOX Annual Trading Budgets and Variability Limits 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–8–14 TR NOX Annual Allowance Allocations 12/7/2018 3/12/2020, 85 FR 14418 Section 335–3–8–16 Authorization of Designated Representative and Alternate Designated Representative 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–8–17 Responsibilities of Designated Representative and Alternate Designated Representative 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–8–18 Changing Designated Representative and Alternate Designated Representative; Changes in Owners and Operators; Changes in Units at the Source 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–8–19 Certificate of Representation 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–8–20 Objections Concerning Designated Representative and Alternate Designated Representative 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–8–21 Delegation by Designated Representative and Alternate Designated Representative 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–8–23 Establishment of Compliance Accounts, Assurance Accounts, and General Accounts 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–8–24 Recordation of TR NOX Annual Allowance Allocations and Auction Results 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–8–25 Submission of TR NOX Annual Allowance Transfers 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–8–26 Recordation of TR NOX Annual Allowance Transfers 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–8–27 Compliance with TR NOX Annual Emissions Limitation 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–8–28 Compliance with TR NOX Annual Assurance Provisions 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–8–29 Banking 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–8–30 Account Error 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–8–31 Administrator's Action on Submissions 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–8–33 General Monitoring, Recordkeeping, and Reporting Requirements 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–8–34 Initial Monitoring System Certification and Recertification Procedures 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–8–35 Monitoring System Out-of-Control Periods 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–8–36 Notifications Concerning Monitoring 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–8–37 Recordkeeping and Reporting 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–8–38 Petitions for Alternatives to Monitoring, Recordkeeping, or Reporting Requirements 11/24/2015 8/31/2016, 81 FR 59869 Section 335–3–8–39 TR NOX Ozone Season Group 2 Trading Program—Purpose and Definitions 6/9/2017 10/6/2017, 82 FR 46674 Section 335–3–8–40 TR NOX Ozone Season Group 2 Trading Program—Applicability 10/5/2018 3/12/2020, 85 FR 14418 Section 335–3–8–41 TR NOX Ozone Season Group 2 Trading Program—Retired Unit Exemption 6/9/2017 10/6/2017, 82 FR 46674 Section 335–3–8–42 TR NOX Ozone Season Group 2 Trading Program—Standard Requirements 6/9/2017 10/6/2017, 82 FR 46674 Section 335–3–8–43 TR NOX Ozone Season Group 2 Trading Program—Computation of Time 6/9/2017 10/6/2017, 82 FR 46674 Section 335–3–8–44 Administrative Appeal Procedures 11/24/2015 10/6/2017, 82 FR 46674 Section 335–3–8–45 NOX Ozone Season Group 2 Trading Budgets and Variability Limits 6/9/2017 10/6/2017, 82 FR 46674 Section 335–3–8–46 TR NOX Ozone Season Group 2 Allowance Allocations 12/7/2018 3/12/2020, 85 FR 14418 Section 335–3–8–48 Authorization of Designated Representative and Alternate Designated Representative 6/9/2017 10/6/2017, 82 FR 46674 Section 335–3–8–49 Responsibilities of Designated Representative and Alternate Designated Representative 6/9/2017 10/6/2017, 82 FR 46674 Section 335–3–8–50 Changing Designated Representative and Alternate Designated Representative; Changes in Owners and Operators; Changes in Units at the Source 6/9/2017 10/6/2017, 82 FR 46674 Section 335–3–8–51 Certificate of Representation 6/9/2017 10/6/2017, 82 FR 46674 Section 335–3–8–52 Objections Concerning Designated Representative and Alternate Designated Representative 6/9/2017 10/6/2017, 82 FR 46674 Section 335–3–8–53 Delegation by Designated Representative and Alternate Designated Representative 6/9/2017 10/6/2017, 82 FR 46674 Section 335–3–8–55 Establishment of Compliance Accounts, Assurance Accounts, and General Accounts 6/9/2017 10/6/2017, 82 FR 46674 Section 335–3–8–56 Recordation of TR NOX Ozone Season Group 2 Allowance Allocations and Auction Results 6/9/2017 10/6/2017, 82 FR 46674 Section 335–3–8–57 Submission of TR NOX Ozone Season Group 2 Allowance Transfers 6/9/2017 10/6/2017, 82 FR 46674 Section 335–3–8–58 Recordation of TR NOX Ozone Season Group 2 Allowance Transfers 6/9/2017 10/6/2017, 82 FR 46674 Section 335–3–8–59 Compliance with TR NOX Ozone Season Group 2 Emissions Limitation 6/9/2017 10/6/2017, 82 FR 46674 Section 335–3–8–60 Compliance with TR NOX Ozone Season Group 2 Assurance Provisions 6/9/2017 10/6/2017, 82 FR 46674 Section 335–3–8–61 Banking 6/9/2017 10/6/2017, 82 FR 46674 Section 335–3–8–62 TR NOX Ozone Season Group 2 Trading Program—Account Error 6/9/2017 10/6/2017, 82 FR 46674 Section 335–3–8–63 TR NOX Ozone Season Group 2 Trading Program—Administrator's Action on Submissions 6/9/2017 10/6/2017, 82 FR 46674 Section 335–3–8–65 General Monitoring, Recordkeeping, and Reporting Requirements 6/9/2017 10/6/2017, 82 FR 46674 Section 335–3–8–66 Initial Monitoring System Certification and Recertification Procedures 6/9/2017 10/6/2017, 82 FR 46674 Section 335–3–8–67 Monitoring System Out-of-Control Periods 6/9/2017 10/6/2017, 82 FR 46674 Section 335–3–8–68 Notifications Concerning Monitoring 6/9/2017 10/6/2017, 82 FR 46674 Section 335–3–8–69 Recordkeeping and Reporting 6/9/2017 10/6/2017, 82 FR 46674 Section 335–3–8–70 Petitions for Alternatives to Monitoring, Recordkeeping, or Reporting Requirements 6/9/2017 10/6/2017, 82 FR 46674 Section 335–3–8–71 NOX Budget Program 4/13/2020 7/7/2021, 86 FR 35610 Section 335–3–8–72 NOX Budget Program Monitoring and Reporting 12/13/2021 7/11/2022, 87 FR 41061 Chapter No. 335–3–9 Control of Emissions from Motor Vehicles Section 335–3–9–01 Visible Emission Restrictions for Motor Vehicles 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–9–02 Ignition System and Engine Speed 8/10/2000 12/8/2000, 65 FR 76938 Section 335–3–9–03 Crankcase Ventilation Systems 8/10/2000 12/8/2000, 65 FR 76938 Section 335–3–9–04 Exhaust Emission Control Systems 6/22/1989 3/19/1990, 55 FR 10062 Section 335–3–9–05 Evaporative Loss Control Systems 6/22/1989 3/19/1990, 55 FR 10062 Section 335–3–9–06 Other Prohibited Acts 8/10/2000 12/8/2000, 65 FR 76938 Section 335–3–9–07 Effective Date 10/15/1996 6/6/1997, 62 FR 30991 Chapter No. 335–3–12 Continuous Monitoring Requirements for Existing Sources Section 335–3–12–01 General 6/22/1989 3/19/1990, 55 FR 10062 Section 335–3–12–02 Emission Monitoring and Reporting Requirements 2/17/1998 9/14/1998, 63 FR 49005 Section 335–3–12–03 Monitoring System Malfunction 6/22/1989 3/19/1990, 55 FR 10062 Section 335–3–12–04 Alternate Monitoring and Reporting Requirements 6/22/1989 3/19/1990, 55 FR 10062 Section 335–3–12–05 Exemptions and Extensions 6/22/1989 3/19/1990, 55 FR 10062 Chapter No. 335–3–13 Control of Fluoride Emissions Section 335–3–13–01 Definitions 2/28/1978 2/22/1982, 47 FR 7666 Section 335–3–13–02 Superphosphoric Acid Plants 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–13–03 Diammonium Phosphate Plants 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–13–04 Triple Superphosphate Plants 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–13–05 Granular Triple Superphosphoric Storage Facilities 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–13–06 Wet Process Phosphoric Acid Plants 10/15/1996 6/6/1997, 62 FR 30991 Chapter No. 335–3–14 Air Permits Section 335–3–14–01 General Provisions 6/9/2017 12/14/2018, 83 FR 64285 Section 335–3–14–02 Permit Procedures 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–14–03 Standards for Granting Permits 5/23/2011 9/26/2012, 77 FR 59100 Section 335–3–14–04 Air Permits Authorizing Construction in Clean Air Areas [Prevention of Significant Deterioration Permitting (PSD)] 10/5/2018 7/3/2019, 84 FR 31741 Except for changes to 335–3–14–04(2)(w)1., state effective July 11, 2006, which lists a 100 ton per year significant net emissions increase for regulated NSR pollutants not otherwise specified at 335–3–14–04(2)(w). Except for the significant impact levels at 335–3–14–04(10)(b) which were withdrawn from EPA consideration on October 9, 2014. Except for the second sentence of paragraph 335–3–14–04(2)(bbb)2., as well as the second and fourth sentences of paragraph 335–3–14–04(2)(bbb)3., which include changes from the vacated federal ERP rule and were withdrawn from EPA consideration by the State on May 5, 2017. Section 335–3–14–05 Air Permits Authorizing Construction in or Near Nonattainment Areas 6/9/2017 12/14/2018, 83 FR 64285 With the exception of: The portion of 335–3–14–05(1)(k) stating “excluding ethanol production facilities that produce ethanol by natural fermentation”; and 335–3–14–05(2)(c)3 (addressing fugitive emission increases and decreases). Also with the exception of the state-withdrawn elements: 335–3–14–05(1)(h) (the actual-to-potential test for projects that only involve existing emissions units); the last sentence at 335–3–14–05(3)(g), stating “Interpollutant offsets shall be determined based upon the following ratios”; and the NNSR interpollutant ratios at 335–3–14–05(3)(g)1–4. Chapter No. 335–3–15 Synthetic Minor Operating Permits Section 335–3–15–01 Definitions 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–15–02 General Provisions 8/10/2000 12/8/2000, 65 FR 76938 Section 335–3–15–03 Applicability 11/23/1993 10/20/1994, 59 FR 52916 Section 335–3–15–04 Synthetic Minor Operating Permit Requirements 10/15/1996 6/6/1997, 62 FR 30991 Section 335–3–15–05 Public Participation 6/9/2017 12/14/2018, 83 FR 64285 Chapter No. 335–3–17 Conformity of Federal Actions to State Implementation Plans Section 335–3–17–01 Transportation Conformity 5/28/2013 10/12/2017, 82 FR 47383 Section 335–3–17–02 General Conformity 5/23/2011 9/26/2012, 77 FR 59100 (d) EPA-Approved Alabama Source-Specific Requirements.
Table 2 to Paragraph (d)—EPA-Approved Alabama Source-Specific Requirements
Name of source Permit No. State
effective
dateEPA approval date Explanation Lafarge Cement Kiln AB70004_1_01 2/6/2008 7/30/2009, 74 FR 37945 Certain provisions of the permit. Lehigh Cement Kiln 4–07–0290–03 2/6/2008 7/30/2009, 74 FR 37945 Certain provisions of the permit. (e) EPA Approved Alabama Non-Regulatory Provisions.
EPA Approved Alabama Non-Regulatory Provisions
Name of nonregulatory SIP provision Applicable geographic or nonattainment area State submittal date/effective date EPA approval date Explanation Attainment Plan for the Alabama Portion of the Chattanooga 1997 Annual PM2.5 Nonattainment Area A portion of Jackson County, Alabama 10/07/2009 10/5/2012, 77 FR 60904 Birmingham 1990 Baseline Emissions Inventory Birmingham Ozone Nonattainment Area 11/13/1992 6/4/1999, 64 FR 29961 Alabama Interagency Transportation Conformity Memorandum of Agreement 1/20/2000 5/11/2000, 65 FR 30362 Alabama Fuel Waiver Request—Appendix II of Attainment Demonstration of the 1-hour NAAQS for Ozone for the Birmingham Nonattainment Area Birmingham Ozone Nonattainment Area 12/1/2000 11/7/2001, 66 FR 56220 Attainment Demonstration of the 1-hour NAAQS for Ozone for the Birmingham Nonattainment Area Birmingham Ozone Nonattainment Area 12/1/2000 11/7/2001, 66 FR 56224 Maintenance Plan for the Birmingham area Jefferson County and Shelby County 1/30/2004 3/12/2004, 69 FR 11800 8-Hour Ozone Maintenance plan for the Birmingham area Jefferson County and Shelby County 1/26/2006 5/12/2006, 71 FR 27631 Conformity SIP for Birmingham and Jackson County Jefferson County, Shelby County, Jackson County 12/12/2008 3/26/2009, 74 FR 13118 110(a)(1) and (2) Infrastructure Requirements for the 1997 8-Hour Ozone National Ambient Air Quality Standards Alabama 12/10/2007 7/13/2011, 76 FR 41088 For the 1997 8-hour ozone NAAQS. Chattanooga; Fine Particulate Matter 2002 Base Year Emissions Inventory Jackson County 7/31/2009 2/8/2012, 77 FR 6467 Regional haze plan Statewide 7/15/2008 6/28/2012, 77 FR 38515. 110(a)(1) and (2) Infrastructure Requirements for 1997 Fine Particulate Matter National Ambient Air Quality Standards Alabama 7/25/2008 10/1/2012, 77 FR 59755 With the exception of sections 110(a)(2)(D)(i) and 110(a)(2)(E)(ii). 110(a)(1) and (2) Infrastructure Requirements for 2006 Fine Particulate Matter National Ambient Air Quality Standards Alabama 9/23/2009 10/1/2012, 77 FR 59755 With the exception of sections 110(a)(2)(D)(i) and 110(a)(2)(E)(ii). 1997 Annual PM2.5 Maintenance Plan for the Birmingham Area Birmingham PM2.5 Nonattainment Area 5/2/2011 1/22/2013, 78 FR 4341 2006 24-hour PM2.5 Maintenance Plan for the Birmingham Area Birmingham PM2.5 Nonattainment Area 6/17/2010 1/25/2013, 78 FR 5306 110(a)(1) and (2) Infrastructure Requirements for 1997 Fine Particulate Matter National Ambient Air Quality Standards Alabama 7/25/2008 4/12/2013, 78 FR 21841 Addressing element 110(a)(2)(D)(i)(II) prong 3 only 110(a)(1) and (2) Infrastructure Requirements for 2006 Fine Particulate Matter National Ambient Air Quality Standards Alabama 9/23/2009 4/12/2013, 78 FR 21841 Addressing element 110(a)(2)(D)(i)(II) prong 3 only 2008 Lead Attainment Demonstration for Troy Area Troy Area 11/9/2012 1/28/2014, 79 FR 4407 110(a)(1) and (2) Infrastructure Requirements for 1997 Fine Particulate Matter National Ambient Air Quality Standards Alabama 7/25/2008 5/7/2014, 79 FR 26143 Addressing prong 4 of section 110(a)(2)(D)(i) only. 110(a)(1) and (2) Infrastructure Requirements for 2006 Fine Particulate Matter National Ambient Air Quality Standards Alabama 9/23/2009 5/7/2014, 79 FR 26143 Addressing prong 4 of section 110(a)(2)(D)(i) only. 1997 Annual PM2.5 Maintenance Plan for the Alabama portion of the Chattanooga TN-GA-AL Area Portion of Jackson County in the Chattanooga TN-GA-AL Area 4/23/2013 12/22/2014, 79 FR 76235 110(a)(1) and (2) Infrastructure Requirements for the 2008 Lead NAAQS Alabama 11/4/2011 3/18/2015, 80 FR 14019 Addressing the PSD permitting requirements of sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only. 110(a)(1) and (2) Infrastructure Requirements for the 2008 Ozone NAAQS Alabama 8/20/2012 3/18/2015, 80 FR 14019 Addressing the PSD permitting requirements of sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only. 110(a)(1) and (2) Infrastructure Requirements for the 2010 NO2 NAAQS Alabama 4/23/2013 3/18/2015, 80 FR 14019 Addressing the PSD permitting requirements of sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only. Non-interference Demonstration for Federal Low-Reid Vapor Pressure Requirement for the Birmingham Area Jefferson and Shelby Counties 11/14/2014 4/17/2015, 80 FR 21170 110(a)(1) and (2) Infrastructure Requirements for the 2008 8-Hour Ozone National Ambient Air Quality Standards 7/17/2012 4/2/2015 4/2/2015, 80 FR 17689 With the exception of PSD permitting requirements for major sources of sections 110(a)(2)(C) and (J); interstate transport requirements of section 110(a)(2)(D)(i)(I) and (II), 110(a)(2)(E)(ii), and the visibility requirements of section 110(a)(2)(J). Cross State Air Pollution Rule—State-Determined Allowance Allocations for the 2016 control periods Alabama 3/27/2014 9/22/2015 110(a)(1) and (2) Infrastructure Requirements for the 2008 Ozone NAAQS Alabama 8/20/2012 8/12/2015, 80 FR 48258 Addressing the visibility requirements of 110(a)(2)(J) only. 110(a)(1) and (2) Infrastructure Requirements for the 2008 Lead National Ambient Air Quality Standards Alabama 11/4/2011 10/9/2015, 80 FR 61111 With the exception of provisions pertaining to PSD permitting requirements in sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3), 110(a)(2)(J); and section 110(a)(2)(E)(ii). 110(a)(1) and 110(a)(2) Infrastructure Requirements for the 2010 NO2 NAAQS—Update Alabama 12/9/2015 9/22/2016, 81 FR 65286 Addressing Prongs 1 and 2 of Section 110(a)(2)(D)(i)(I) only. 110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour NO2 NAAQS Alabama 4/23/2013 11/21/2016, 81 FR 83142 With the exception of sections: 110(a)(2)(C) and (J) concerning PSD permitting requirements; 110(a)(2)(D)(i)(I) and (II) (prongs 1 through 4) concerning interstate transport requirements and the state boards of section 110(a)(2)(E)(ii). 110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour SO2 NAAQS Alabama 4/23/2013 1/12/2017, 82 FR 3637 With the exception of interstate transport requirements of section 110(a)(2)(D)(i)(II) (prong 4), and the state board requirements of section 110(a)(2)(E)(ii). 110(a)(1) and (2) Infrastructure Requirements for the 2012 Annual PM2.5 NAAQS Alabama 12/9/2015 9/18/2017, 82 FR 43487 With the exception of section 110(a)(2)(D)(i)(I) and (II) (prongs 1, 2 and 4) and the state board requirements of section 110(a)(2)(E)(ii). 110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour NO2 NAAQS Alabama 12/9/2015 10/12/2017, 82 FR 47393 Addressing Prong 4 of Section 110(a)(2)(D)(i)(I) only. 110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour SO2 NAAQS Alabama 4/23/2013 10/12/2017, 82 FR 47393 Addressing Prong 4 of Section 110(a)(2)(D)(i)(I) only. 110(a)(1) and (2) Infrastructure Requirements for the 2012 Annual PM2.5 NAAQS Alabama 12/9/2015 10/12/2017, 82 FR 47393 Addressing Prong 4 of Section 110(a)(2)(D)(i)(I) only. Regional Haze Plan Revision Alabama 10/26/2015 10/12/2017, 82 FR 47393 2008 Lead Maintenance Plan for the Troy Area Troy Area 1/3/2018 6/20/2018, 83 FR 28543 110(a)(1) and (2) Infrastructure Requirements for the 1997 Annual PM2.5 NAAQS Alabama 12/8/2017 7/6/2018, 83 FR 31454 Addressing the state board requirements of sections 128 and 110(a)(2)(E)(ii) only. 110(a)(1) and (2) Infrastructure Requirements for the 2006 24-hour PM2.5 NAAQS Alabama 12/8/2017 7/6/2018, 83 FR 31454 Addressing the state board requirements of sections 128 and 110(a)(2)(E)(ii) only. 110(a)(1) and (2) Infrastructure Requirements for the 2012 24-hour PM2.5 NAAQS Alabama 12/8/2017 7/6/2018, 83 FR 31454 Addressing the state board requirements of sections 128 and 110(a)(2)(E)(ii) only. 110(a)(1) and (2) Infrastructure Requirements for the 2008 Lead NAAQS Alabama 12/8/2017 7/6/2018, 83 FR 31454 Addressing the state board requirements of sections 128 and 110(a)(2)(E)(ii) only. 110(a)(1) and (2) Infrastructure Requirements for the 2008 8-hour Ozone NAAQS Alabama 12/8/2017 7/6/2018, 83 FR 31454 Addressing the state board requirements of sections 128 and 110(a)(2)(E)(ii) only. 110(a)(1) and (2) Infrastructure Requirements for the 2010 NO2 NAAQS Alabama 12/8/2017 7/6/2018, 83 FR 31454 Addressing the state board requirements of sections 128 and 110(a)(2)(E)(ii) only. 110(a)(1) and (2) Infrastructure Requirements for the 2010 SO2 NAAQS Alabama 12/8/2017 7/6/2018, 83 FR 31454 Addressing the state board requirements of sections 128 and 110(a)(2)(E)(ii) only. 110(a)(1) and (2) Infrastructure Requirements for the 2012 Annual PM2.5 NAAQS Alabama 12/9/2015 9/25/2018, 83 FR 48387 Addressing Prongs 1 and 2 of section 110(a)(2)(D)(i)(I) only. June 2018 Regional Haze Progress Report Alabama 6/26/2018 3/5/2019, 84 FR 7823 110(a)(1) and (2) Infrastructure Requirements for the 2015 8-Hour Ozone NAAQS Alabama 8/27/2018 2/6/2020, 85 FR 6808 With the exception of 110(a)(2)(D)(i)(I) (prongs 1 and 2). 110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour SO2 NAAQS Alabama 8/20/2018 3/10/2020, 85 FR 13755 Addressing Prongs 1 and 2 of section 110(a)(2)(D)(i) only. 1997 8-Hour Ozone Second 10-Year Limited Maintenance Plan for the Birmingham Area Jefferson County and Shelby County 9/16/2020 4/6/2022, 87 FR 19806 2006 24-hour PM2.5 Second Maintenance Plan (Limited Maintenance Plan) for the Birmingham Area Birmingham PM2.5 Maintenance Area 2/2/2021 2/2/2024, 89 FR 7289 [63 FR 70672, Dec. 22, 1998]