§ 60.2600 - How do I comply with the increment of progress for submittal of a control plan?  


Latest version.
  • § 60.2600 How do I comply with the increment of progress for submittal of a control plan?

    For your control plan increment of progress, you must satisfy the two requirements specified in paragraphs (a) and (b) of this section:

    (a) Submit the final control plan that includes the five items described in paragraphs (a)(1) through (5) of this section:

    (1) A description of the devices for air pollution control and process changes that you will use to comply with the emission limitations and other requirements of this subpart;

    (2) The type(s) of waste to be burned;

    (3) The maximum design waste burning capacity;

    (4) The anticipated maximum charge rate; and

    (5) If applicable, the petition for site-specific operating limits under § 60.2680.

    (b) Maintain an onsite copy of the final control plan.