Subpart DDDD—Emissions Guidelines and Compliance Times for Commercial and Industrial Solid Waste Incineration Units  


§ 60.2500 What is the purpose of this subpart?
§ 60.2505 Am I affected by this subpart?
§ 60.2510 Is a State plan required for all States?
§ 60.2515 What must I include in my State plan?
§ 60.2520 Is there an approval process for my State plan?
§ 60.2525 What if my state plan is not approvable?
§ 60.2530 Is there an approval process for a negative declaration letter?
§ 60.2535 What compliance schedule must I include in my State plan?
§ 60.2540 Are there any State plan requirements for this subpart that apply instead of the requirements specified in subpart B?
§ 60.2541 In lieu of a state plan submittal, are there other acceptable option(s) for a state to meet its Clean Air Act section 111(d)/129(b)(2) obligations?
§ 60.2542 What authorities will not be delegated to state, local, or tribal agencies?
§ 60.2545 Does this subpart directly affect CISWI owners and operators in my state?
§ 60.2550 What CISWIs must I address in my state plan?
§ 60.2555 What combustion units are exempt from my State plan?
§ 60.2560 What is the “model rule” in this subpart?
§ 60.2565 How does the model rule relate to the required elements of my State plan?
§ 60.2570 What are the principal components of the model rule?
§ 60.2575 What are my requirements for meeting increments of progress and achieving final compliance?
§ 60.2580 When must I complete each increment of progress?
§ 60.2585 What must I include in the notifications of achievement of increments of progress?
§ 60.2590 When must I submit the notifications of achievement of increments of progress?
§ 60.2595 What if I do not meet an increment of progress?
§ 60.2600 How do I comply with the increment of progress for submittal of a control plan?
§ 60.2605 How do I comply with the increment of progress for achieving final compliance?
§ 60.2610 What must I do if I close my CISWI and then restart it?
§ 60.2615 What must I do if I plan to permanently close my CISWI and not restart it?
§ 60.2620 What is a waste management plan?
§ 60.2625 When must I submit my waste management plan?
§ 60.2630 What should I include in my waste management plan?
§ 60.2635 What are the operator training and qualification requirements?
§ 60.2640 When must the operator training course be completed?
§ 60.2645 How do I obtain my operator qualification?
§ 60.2650 How do I maintain my operator qualification?
§ 60.2655 How do I renew my lapsed operator qualification?
§ 60.2660 What site-specific documentation is required?
§ 60.2665 What if all the qualified operators are temporarily not accessible?
§ 60.2670 What emission limitations must I meet and by when?
§ 60.2675 What operating limits must I meet and by when?
§ 60.2680 What if I do not use a wet scrubber, fabric filter, activated carbon injection, selective noncatalytic reduction, an electrostatic precipitator, or a dry scrubber to comply with the emission limitations?
§ 60.2685 Affirmative defense for violation of emission standards during malfunction.
§ 60.2690 How do I conduct the initial and annual performance test?
§ 60.2695 How are the performance test data used?
§ 60.2700 How do I demonstrate initial compliance with the amended emission limitations and establish the operating limits?
§ 60.2705 By what date must I conduct the initial performance test?
§ 60.2706 By what date must I conduct the initial air pollution control device inspection?
§ 60.2710 How do I demonstrate continuous compliance with the amended emission limitations and the operating limits?
§ 60.2715 By what date must I conduct the annual performance test?
§ 60.2716 By what date must I conduct the annual air pollution control device inspection?
§ 60.2720 May I conduct performance testing less often?
§ 60.2725 May I conduct a repeat performance test to establish new operating limits?
§ 60.2730 What monitoring equipment must I install and what parameters must I monitor?
§ 60.2735 Is there a minimum amount of monitoring data I must obtain?
§ 60.2740 What records must I keep?
§ 60.2745 Where and in what format must I keep my records?
§ 60.2750 What reports must I submit?
§ 60.2755 When must I submit my waste management plan?
§ 60.2760 What information must I submit following my initial performance test?
§ 60.2765 When must I submit my annual report?
§ 60.2770 What information must I include in my annual report?
§ 60.2775 What else must I report if I have a deviation from the operating limits or the emission limitations?
§ 60.2780 What must I include in the deviation report?
§ 60.2785 What else must I report if I have a deviation from the requirement to have a qualified operator accessible?
§ 60.2790 Are there any other notifications or reports that I must submit?
§ 60.2795 In what form can I submit my reports?
§ 60.2800 Can reporting dates be changed?
§ 60.2805 Am I required to apply for and obtain a title V operating permit for my unit?
§ 60.2810 What is an air curtain incinerator?
§ 60.2815 What are my requirements for meeting increments of progress and achieving final compliance?
§ 60.2820 When must I complete each increment of progress?
§ 60.2825 What must I include in the notifications of achievement of increments of progress?
§ 60.2830 When must I submit the notifications of achievement of increments of progress?
§ 60.2835 What if I do not meet an increment of progress?
§ 60.2840 How do I comply with the increment of progress for submittal of a control plan?
§ 60.2845 How do I comply with the increment of progress for achieving final compliance?
§ 60.2850 What must I do if I close my air curtain incinerator and then restart it?
§ 60.2855 What must I do if I plan to permanently close my air curtain incinerator and not restart it?
§ 60.2860 What are the emission limitations for air curtain incinerators?
§ 60.2865 How must I monitor opacity for air curtain incinerators?
§ 60.2870 What are the recordkeeping and reporting requirements for air curtain incinerators?
§ 60.2875 What definitions must I know?
Table 1 to Subpart DDDD of Part 60—Model Rule—Increments of Progress and Compliance Schedules
Table 2 to Subpart DDDD of Part 60—Model Rule—Emission Limitations That Apply to Incinerators Before [Date to be specified in state plan]
Table 3 to Subpart DDDD of Part 60—Model Rule—Operating Limits for Wet Scrubbers
Table 4 to Subpart DDDD of Part 60—Model Rule—Toxic Equivalency Factors
Table 5 to Subpart DDDD of Part 60—Model Rule—Summary of Reporting Requirements
Table 6 to Subpart DDDD of Part 60—Model Rule—Emission Limitations That Apply to Incinerators on and After [Date to be specified in state plan]
Table 7 to Subpart DDDD of Part 60—Model Rule—Emission Limitations That Apply to Energy Recovery Units After May 20, 2011 [Date to be specified in state plan]
Table 8 to Subpart DDDD of Part 60—Model Rule—Emission Limitations That Apply to Waste-Burning Kilns After May 20, 2011 [Date to be specified in state plan.]
Table 9 to Subpart DDDD of Part 60—Model Rule—Emission Limitations That Apply to Small, Remote Incinerators After May 20, 2011 [Date to be specified in state plan]