Subpart FFFF—Emission Guidelines and Compliance Times for Other Solid Waste Incineration Units That Commenced Construction On or Before December 9, 2004  


§ 60.2980 What is the purpose of this subpart?
§ 60.2981 Am I affected by this subpart?
§ 60.2982 Is a State plan required for all States?
§ 60.2983 What must I include in my State plan?
§ 60.2984 Is there an approval process for my State plan?
§ 60.2985 What if my State plan is not approvable?
§ 60.2986 Is there an approval process for a negative declaration letter?
§ 60.2987 What compliance schedule must I include in my State plan?
§ 60.2988 Are there any State plan requirements for this subpart that apply instead of the requirements specified in subpart B of this part?
§ 60.2989 Does this subpart directly affect incineration unit owners and operators in my State?
§ 60.2990 What Authorities are withheld by EPA?
§ 60.2991 What incineration units must I address in my State plan?
§ 60.2992 What is an existing incineration unit?
§ 60.2993 Are any combustion units excluded from my State plan?
§ 60.2994 Are air curtain incinerators regulated under this subpart?
§ 60.2996 What is the purpose of the “model rule” in this subpart?
§ 60.2997 How does the model rule relate to the required elements of my State plan?
§ 60.2998 What are the principal components of the model rule?
§ 60.3000 When must I comply?
§ 60.3001 What must I do if I close my OSWI unit and then restart it?
§ 60.3002 What must I do if I plan to permanently close my OSWI unit and not restart it?
§ 60.3010 What is a waste management plan?
§ 60.3011 When must I submit my waste management plan?
§ 60.3012 What should I include in my waste management plan?
§ 60.3014 What are the operator training and qualification requirements?
§ 60.3015 When must the operator training course be completed?
§ 60.3016 How do I obtain my operator qualification?
§ 60.3017 How do I maintain my operator qualification?
§ 60.3018 How do I renew my lapsed operator qualification?
§ 60.3019 What site-specific documentation is required?
§ 60.3020 What if all the qualified operators are temporarily not accessible?
§ 60.3022 What emission limitations must I meet and by when?
§ 60.3023 What operating limits must I meet and by when?
§ 60.3024 What if I do not use a wet scrubber to comply with the emission limitations?
§ 60.3025 What happens during periods of startup, shutdown, and malfunction?
§ 60.3027 How do I conduct the initial and annual performance test?
§ 60.3028 How are the performance test data used?
§ 60.3030 How do I demonstrate initial compliance with the emission limitations and establish the operating limits?
§ 60.3031 By what date must I conduct the initial performance test?
§ 60.3033 How do I demonstrate continuous compliance with the emission limitations and the operating limits?
§ 60.3034 By what date must I conduct the annual performance test?
§ 60.3035 May I conduct performance testing less often?
§ 60.3036 May I conduct a repeat performance test to establish new operating limits?
§ 60.3038 What continuous emission monitoring systems must I install?
§ 60.3039 How do I make sure my continuous emission monitoring systems are operating correctly?
§ 60.3040 What is my schedule for evaluating continuous emission monitoring systems?
§ 60.3041 What is the minimum amount of monitoring data I must collect with my continuous emission monitoring systems, and is the data collection requirement enforceable?
§ 60.3042 How do I convert my 1-hour arithmetic averages into the appropriate averaging times and units?
§ 60.3043 What operating parameter monitoring equipment must I install, and what operating parameters must I monitor?
§ 60.3044 Is there a minimum amount of operating parameter monitoring data I must obtain?
§ 60.3046 What records must I keep?
§ 60.3047 Where and in what format must I keep my records?
§ 60.3048 What reports must I submit?
§ 60.3049 What information must I submit following my initial performance test?
§ 60.3050 When must I submit my annual report?
§ 60.3051 What information must I include in my annual report?
§ 60.3052 What else must I report if I have a deviation from the operating limits or the emission limitations?
§ 60.3053 What must I include in the deviation report?
§ 60.3054 What else must I report if I have a deviation from the requirement to have a qualified operator accessible?
§ 60.3055 Are there any other notifications or reports that I must submit?
§ 60.3056 In what form can I submit my reports?
§ 60.3057 Can reporting dates be changed?
§ 60.3059 Am I required to apply for and obtain a title V operating permit for my unit?
§ 60.3060 When must I submit a title V permit application for my existing unit?
§ 60.3061 What are the requirements for temporary-use incinerators and air curtain incinerators used in disaster recovery?
§ 60.3062 What is an air curtain incinerator?
§ 60.3063 When must I comply if my air curtain incinerator burns only wood waste, clean lumber, and yard waste?
§ 60.3064 What must I do if I close my air curtain incinerator that burns only wood waste, clean lumber, and yard waste and then restart it?
§ 60.3065 What must I do if I plan to permanently close my air curtain incinerator that burns only wood waste, clean lumber, and yard waste and not restart it?
§ 60.3066 What are the emission limitations for air curtain incinerators that burn only wood waste, clean lumber, and yard waste?
§ 60.3067 How must I monitor opacity for air curtain incinerators that burn only wood waste, clean lumber, and yard waste?
§ 60.3068 What are the recordkeeping and reporting requirements for air curtain incinerators that burn only wood waste, clean lumber, and yard waste?
§ 60.3069 Am I required to apply for and obtain a title V operating permit for my air curtain incinerator that burns only wood waste, clean lumber, and yard waste?
§ 60.3076 What equations must I use?
§ 60.3078 What definitions must I know?
Table 1 to Subpart FFFF of Part 60—Model Rule—Compliance Schedule
Table 2 to Subpart FFFF of Part 60—Model Rule—Emission Limitations
Table 3 to Subpart FFFF of Part 60—Model Rule—Operating Limits for Incinerators and Wet Scrubbers
Table 4 to Subpart FFFF of Part 60—Model Rule—Requirements for Continuous Emission Monitoring Systems (CEMS)
Table 5 to Subpart FFFF of Part 60—Model Rule—Summary of Reporting Requirements