Code of Federal Regulations (Last Updated: November 8, 2024) |
Title 40 - Protection of Environment |
Chapter I—Environmental Protection Agency |
SubChapter C—Air Programs |
Part 60 - Standards of Performance for New Stationary Sources |
Subpart OOOOc - Emissions Guidelines for Greenhouse Gas Emissions From Existing Crude Oil and Natural Gas Facilities |
Subpart OOOOc - Emissions Guidelines for Greenhouse Gas Emissions From Existing Crude Oil and Natural Gas Facilities
Applicability of State or Tribal Plans |
§ 60.5375c - What designated facilities must I address in my state or Tribal plan? |
Model Rule—Definitions |
§ 60.5430c - What definitions apply to this subpart? |
§§ 60.5431c--60.5439c - [Reserved] |
Model Rule—Increments of Progress |
§ 60.5380c - What if I do not meet the final control plan increment of progress compliance date? |
§ 60.5381c - How do I comply with the increment of progress for submittal of a final compliance control plan? |
§ 60.5379c - What are my requirements for meeting increments of progress and achieving final compliance? |
Introduction |
§ 60.5360c - What is the purpose of this subpart? |
§ 60.5370c - What compliance schedule must I include in my state or Tribal plan? |
§ 60.5361c - Which pollutants are regulated by this subpart? |
§ 60.5371c - What requirements apply to revisions to my state or Tribal plan? |
§ 60.5362c - Am I affected by this subpart? |
§ 60.5372c - In lieu of a state or Tribal plan submittal, are there other acceptable option(s) for a state to meet its Clean Air Act section 111(d) obligations? |
§ 60.5363c - What must I include in my state or Tribal plan? |
§ 60.5373c - What authorities will not be delegated to state, local, or Tribal agencies? |
§ 60.5364c - How do I apply to use my state standards as part of my state or Tribal plan submission? |
§ 60.5374c - Does this subpart directly affect designated facility owners and operators in my state? |
§ 60.5365c - How do I apply for a less stringent standard taking into consideration the remaining useful life of a designated facility and other factors? |
§ 60.5366c - [Reserved] |
§ 60.5367c - Is there an approval process for my state or Tribal plan? |
§ 60.5368c - What if my state or Tribal plan is not approvable? |
§ 60.5369c - Is there an approval process for a negative declaration letter? |
Model Rule—Recordkeeping and Reporting |
§ 60.5420c - What are my notification, reporting, and recordkeeping requirements? |
§ 60.5421c - What are my additional recordkeeping requirements for process unit equipment designated facilities? |
§ 60.5422c - What are my additional reporting requirements for process unit equipment designated facilities? |
§ 60.5425c - What parts of the General Provisions apply to me? |
Model Rule—Test Methods and Performance Testing |
§ 60.5405c - What test methods and procedures must I use for my centrifugal compressor and reciprocating compressor designated facilities? |
§ 60.5406c - What test methods and procedures must I use for my process unit equipment designated facilities? |
Model Rule—Applicability |
§ 60.5385c - What is the purpose of this subpart? |
§ 60.5386c - Am I subject to this subpart? |
§ 60.5387c - When must I comply with this subpart? |
Model Rule—Initial Compliance Requirements |
§ 60.5410c - How do I demonstrate initial compliance with the standards for each of my designated facilities? |
§ 60.5411c - What additional requirements must I meet to determine initial compliance for my covers and closed vent systems? |
§ 60.5412c - What additional requirements must I meet for determining initial compliance of my control devices? |
§ 60.5413c - What are the performance testing procedures for control devices? |
Model Rule—Continuous Compliance Requirements |
§ 60.5415c - How do I demonstrate continuous compliance with the standards for each of my designated facilities? |
§ 60.5416c - What are the initial and continuous cover and closed vent system inspection and monitoring requirements? |
§ 60.5417c - What are the continuous monitoring requirements for my control devices? |
Use of Model Rule |
§ 60.5376c - What is the “model rule” in this subpart? |
§ 60.5377c - How does the model rule relate to the required elements of my state or Tribal plan? |
§ 60.5378c - What are the principal components of the model rule? |
Model Rule—Emission and Work Practice Standards |
§ 60.5390c - What GHG standards apply to gas well liquids unloading operations at well designated facilities? |
§ 60.5400c - What GHG standards apply to process unit equipment designated facilities? |
§ 60.5391c - What GHG standards apply to associated gas wells at well designated facilities? |
§ 60.5401c - What are the alternative GHG standards for process unit equipment designated facilities? |
§ 60.5392c - What GHG standards apply to centrifugal compressor designated facilities? |
§ 60.5402c - What are the exceptions to the GHG standards for process unit equipment designated facilities? |
§ 60.5393c - What GHG standards apply to reciprocating compressor designated facilities? |
§ 60.5394c - What GHG standards apply to process controller designated facilities? |
§ 60.5395c - What GHG standards apply to pump designated facilities? |
§ 60.5396c - What GHG standards apply to storage vessel designated facilities? |
§ 60.5397c - What GHG standards apply to fugitive emissions components designated facilities? |
§ 60.5388c - What standards apply to super-emitter events? |
Table 1 to Subpart OOOOc of Part 60 - —Designated Facility Presumptive Standards and Regulated Entity Compliance Dates |
Table 4 to Subpart OOOOc of Part 60 - —Applicability of General Provisions to Subpart OOOOc |