§ 101-45.313-6 - Use of Standard Form 119, Contractor's Statement of Contingent or Other Fees.  


Latest version.
  • (a) Required use. Except as provided in § 101-45.313-7, Standard Form 119 shall be used, without deviation, whenever either part of the inquiry provided for in § 101-45.313-3(a) with respect to contingent fees is answered in the affirmative. The form shall be used also, without deviation, in any other case where an agency desires to obtain such information. When, after use of the form, further information is required, it may be obtained in any appropriate manner. Submission of the form shall be required, normally, only of successful bidders and contractors.

    (b) Statement in lieu of form. Any bidder who has previously furnished a Standard Form 119 to the office issuing the invitation or negotiating the contract may be permitted to accompany his bid with, or submit in connection with the proposed contract, a signed statement indicating when such completed form was previously furnished, identifying by number the previous invitation or contract in connection with which such form was submitted; and representing that the statements in such previously furnished form are applicable to such subsequent bid or contract. In such case, submission of an additional completed Standard Form 119 need not be required.