§ 3212.22 - What criteria establish a new facility for the purpose of obtaining a production incentive?  


Latest version.
  • § 3212.22 What criteria establish a new facility for the purpose of obtaining a production incentive?

    (a) Criteria for determining whether a project is a new facility for the purpose of obtaining a production incentive include:

    (1) The project requires a new site license or facility construction permit if it is on Federal lands;

    (2) The project requires a new Commercial Use Permit;

    (3) The project includes at least one new turbine-generator unit;

    (4) The project involves a new sales contract;

    (5) The project involves a new site or substantially larger footprint; and

    (6) The project is not contiguous to an existing project.

    (b) Generally, a new facility will not:

    (1) Be permitted only with a Geothermal Drilling Permit;

    (2) Be constructed entirely within the footprint of an existing facility; or

    (3) Involve only well-field projects such as drilling new wells, increasing injection, and enhanced recovery projects.