§ 3262.10 - What operational requirements must I meet when drilling a well?  


Latest version.
  • § 3262.10 What operational requirements must I meet when drilling a well?

    (a) When drilling a well, you must:

    (1) Keep the well under control at all times by:

    (i) Conducting training during your operation to maintain the capability of your personnel to perform emergency procedures quickly and effectively;

    (ii) Using properly maintained equipment; and

    (iii) Using operational practices that allow for quick and effective emergency response.

    (b) You must use sound engineering principles and take into account all pertinent data when:

    (1) Selecting and using drilling fluid types and weights;

    (2) Designing and implementing a system to control fluid temperatures;

    (3) Designing and using blowout prevention equipment; and

    (4) Designing and implementing a casing and cementing program.

    (c) Your operation must always comply with the requirements of § 3200.4.