Subpart 3275 - Conducting Utilization Operations |
§ 3275.10 - How do I change my operations if I have an approved facility construction or commercial use permit? |
§ 3275.11 - What are a facility operator's obligations? |
§ 3275.12 - What environmental and safety requirements apply to facility operations? |
§ 3275.13 - How must the facility operator measure the geothermal resources? |
§ 3275.14 - What aspects of my geothermal operations must I measure? |
§ 3275.15 - How accurately must I measure my production and utilization? |
§ 3275.16 - What standards apply to installing and maintaining meters? |
§ 3275.17 - What must I do if I find an error in a meter? |
§ 3275.18 - May BLM require me to test for byproducts associated with geothermal resource production? |
§ 3275.19 - How do I apply to commingle production? |
§ 3275.20 - What will BLM do if I waste geothermal resources? |
§ 3275.21 - May BLM order me to drill and produce wells on my lease? |