§ 3809.11 - When do I have to submit a plan of operations?  


Latest version.
  • § 3809.11 When do I have to submit a plan of operations?

    (a) You must submit a plan of operations and obtain BLM's approval before beginning operations greater than casual use, except as described in § 3809.21. Also see §§ 3809.31 and 3809.400 through 3809.434.

    (b) You must submit a plan of operations for any bulk sampling in which you will remove 1,000 tons or more of presumed ore for testing.

    (c) You must submit a plan of operations for any operations causing surface disturbance greater than casual use in the following special status areas where § 3809.21 does not apply:

    (1) Lands in the California Desert Conservation Area (CDCA) designated by the CDCA plan as “controlled” or “limited” use areas;

    (2) Areas in the National Wild and Scenic Rivers System, and areas designated for potential addition to the system;

    (3) Designated Areas of Critical Environmental Concern;

    (4) Areas designated as part of the National Wilderness Preservation System and administered by BLM;

    (5) Areas designated as “closed” to off-road vehicle use, as defined in § 8340.0-5 of this title;

    (6) Any lands or waters known to contain Federally proposed or listed threatened or endangered species or their proposed or designated critical habitat, unless BLM allows for other action under a formal land-use plan or threatened or endangered species recovery plan; and

    (7) National Monuments and National Conservation Areas administered by BLM.