![]() |
Code of Federal Regulations (Last Updated: July 5, 2024) |
![]() |
Title 46 - Shipping |
![]() |
Chapter I - Coast Guard, Department of Homeland Security |
![]() |
SubChapter J - Electrical Engineering |
![]() |
Part 111 - Electric Systems - General Requirements |
![]() |
Subpart 111.33 - Power Semiconductor Rectifier Systems |
§ 111.33-7 - Alarms and shutdowns.
Latest version.
-
§ 111.33-7 Alarms and shutdowns.
Each power semiconductor rectifier converter must have a high temperature alarm or shutdown, except as provided in § 111.33–11. 33–11.
[CGD 74–125A, 47 FR 15236, Apr. 8, 1982, as amended by USCG–2020–0075, 88 FR 16362, Mar. 16, 2023]