§ 127.120 - Procedure for submittal of plans.


Latest version.
  • § 127.120 Procedure for submittal of plans.

    If a vessel is to be constructed, altered, or repaired, the plans, information, and calculations required by this part must be submitted - submitted—

    (a) To the OCMI in the zone where the vessel is to be constructed, altered, or repaired; or

    (b) By visitors to the Commanding Officer, Marine Safety Center, U.S. Coast Guard, 4200 Wilson Boulevard Suite 400, Arlington, VA 222032703 Martin Luther King Jr. Avenue SE., Washington, DC 20593, or by mail to: Commanding Officer (MSC), Attn: Marine Safety Center, U.S. Coast Guard Stop 7410, 4200 Wilson Boulevard Suite 400, Arlington, VA 20598-74107430, 2703 Martin Luther King Jr. Avenue SE., Washington, DC 20593–7430, in a written or electronic format. Information for submitting the VSP electronically can be found at http://www.uscg.mil/HQ/MSC.

    [USCG-2007-29018USCG–2007–29018, 72 FR 53966, Sept. 21, 2007, as amended by USCG-2009-0702USCG–2009–0702, 74 FR 49235, Sept. 25, 2009; USCG-2013-0671USCG–2013–0671, 78 FR 60154, Sept. 30, 2013; USCG–2016–0498, 82 FR 35092, July 28, 2017]