![]() |
Code of Federal Regulations (Last Updated: May 6, 2024) |
![]() |
Title 46 - Shipping |
![]() |
Chapter I - Coast Guard, Department of Homeland Security |
![]() |
SubChapter Q - Equipment, Construction, and Materials: Specifications and Approval |
![]() |
Part 160 - Lifesaving Equipment |
![]() |
Subpart 160.132 - Launching Appliances - Davits |
§ 160.132-23 - Procedure for approval of design or material change.
-
§ 160.132-23 Procedure for approval of design or material change.
(a) Each change in design, material, or construction from the plans approved under 46 CFR 159.005-13 and § 160.132-13(h) of this subpart must be approved by the Commandant before being used in any production davit. The manufacturer must submit any such change following the procedures in § 160.132-9 of this subpart, but documentation on items that are unchanged from the plans approved under 46 CFR 159.005-13 and § 160.115-13(h) of this subpart need not be resubmitted.
(b) Unless determined by the Commandant to be unnecessary, a prototype davit with each change described in paragraph (a) of this section must be made and tested according to the procedures for new approvals in §§ 160.132-9 through 160.132-13 of this subpart.
(c) Determinations of equivalence of design, construction, and materials will be made by the Commandant only.