Code of Federal Regulations (Last Updated: May 6, 2024) |
Title 46 - Shipping |
Chapter I - Coast Guard, Department of Homeland Security |
SubChapter A - Procedures Applicable to the Public |
Part 2 - Vessel Inspections |
Subpart 2.75 - Approvals of Safety Equipment, Materials and Installations, and Qualifications for Construction Personnel |
§ 2.75-10 - Procedures for obtaining approvals.
-
§ 2.75-10 Procedures for obtaining approvals.
(a) The requirements for obtaining approvals of items covered by specifications and bearing official Coast Guard approval numbers are set forth in parts 159 through 164 of this chapter. For other items, the requirements are described in the regulations governing such items.
(b) Unless otherwise specified, correspondence concerning approvals should be addressed to the Commandant (CG-ENG), Attn: Office of Design and Engineering Systems, U.S. Coast Guard Stop 7509, 2703 Martin Luther King Jr. Avenue SE., Washington, DC 20593-7509. When plans, drawings, test data, etc., are required to be submitted by the manufacturer, the material being transmitted with the application should be clearly identified.
[CGD 76-048, 44 FR 73043, Dec. 17, 1979, as amended by CGD 82-063b, 48 FR 4781, Feb. 3, 1983; CGD 88-070, 53 FR 34533, Sept. 7, 1988; CGD 95-072, 60 FR 50459, Sept. 29, 1995; CGD 96-041, 61 FR 50725, Sept. 27, 1996]