§ 25.145 - Licensing provisions for the FSS in the 18.3-20.2 GHz and 28.35-30.0 GHz bands.  


Latest version.
  • § 25.145 Licensing provisions for the FSS in the 18.3-20.2 GHz and 28.35-30.0 GHz bands.

    (a) [Reserved]

    (b) System License. Applicants authorized to construct and launch a system of technically identical non-geostationary satellite orbit satellites will be awarded a single “blanket” license covering a specified number of space stations to operate in a specified number of orbital planes.

    (c) In addition to providing the information specified in § 25.114, each non-geostationary satellite orbit applicant shall demonstrate the following:

    (1) That the proposed system is capable of providing Fixed-Satellite Service to all locations as far north as 70° North Latitude and as far south as 55° South Latitude for at least 75% of every 24-hour period; and

    (2) That the proposed system is capable of providing Fixed-Satellite Service on a continuous basis throughout the fifty states, Puerto Rico and the U.S. Virgin Islands.

    (3) [Reserved]

    (d) [Reserved]

    (e) Prohibition of certain agreements. No license shall be granted to any applicant for a space station in the FSS operating in portions of the 18.3-20.2 GHz and 28.35-30.0 GHz bands if that applicant, or any persons or companies controlling or controlled by the applicant, shall acquire or enjoy any right, for the purpose of handling traffic to or from the United States, its territories or possessions, to construct or operate space segment or earth stations, or to interchange traffic, which is denied to any other United States company by reason of any concession, contract, understanding, or working arrangement to which the Licensee or any persons or companies controlling or controlled by the Licensee are parties.

    [62 FR 61456, Nov. 18, 1997, as amended at 65 FR 54171, Sept. 7, 2000; 66 FR 63515, Dec. 7, 2001; 67 FR 39310, June 7, 2002; 68 FR 16966, Apr. 8, 2003; 68 FR 51505, Aug. 27, 2003; 68 FR 59129, Oct. 14, 2003; 70 FR 59277, Oct. 12, 2005; 78 FR 8423, Feb. 6, 2013; 79 FR 8320, Feb. 12, 2014; 81 FR 55333, Aug. 18, 2016]