§ 27.1238 - Eligible costs.  


Latest version.
  • § 27.1238 Eligible costs.

    (a) The costs listed in paragraphs (b) through (f) of this section are eligible costs.

    (b) Pre-transition costs:

    (1) Engineering/Consulting

    (i) Evaluation of equipment;

    (ii) RX site identification;

    (iii) EBS Programming plan covering the BTA;

    (iv) Market Analysis (MHz per POP Study);

    (v) RF study (interference analysis); and

    (vi) Transition Plan creation and support;

    (2) Project management (may be sourced external);

    (3) Filing fees;

    (4) Legal fees;

    (5) Site acquisition fees-contractor; and

    (6) Arbitrator fee;

    (c) Transmission facility - analog conversion costs:

    (1) Transmitter upgrading or retuning;

    (2) Combiner re-tuning or new;

    (3) Power divider/circulator adjacent channel combiner hardware;

    (4) STL/fiber relocation;

    (5) Miscellaneous material costs (including cabling and connectors);

    (6) Contract labor:

    (i) Tower;

    (ii) Building modifications;

    (iii) Electrical/HVAC; and

    (iv) Mechanical

    (7) Engineering:

    (i) Structural; and

    (ii) Pathway Interference Analysis.

    (8) Equipment disposal/shipping

    (9) Program Management (third party or internal costs to manage the BTA conversion); and

    (10) Travel and Per Diem Cost.

    (d) Transmission facility-digital conversion costs:

    (1) New transmitter or retuning;

    (2) Digital compression equipment-TX site (including encoders, controller, and software);

    (3) Combiners-new or retune;

    (4) Power divider/circulator adjacent channel combiner hardware;

    (5) Cabinets, cabling, feedline and connectors;

    (6) STL - fiber digital upgrade;

    (7) Installation cost due to adding additional broadcast antenna (4 or more digital channels required);

    (8) Contract labor:

    (i) Tower;

    (ii) Building modifications;

    (iii) Electrical/HVAC; and

    (iv) Mechanical.

    (9) Proof of performance testing (may be contracted);

    (10) Engineering:

    (i) Structural; and

    (ii) Path engineering analysis.

    (11) Equipment disposal/shipping;

    (12) Training;

    (13) Program management (third party or internal costs to manage BTA conversion);

    (14) Travel and per diem costs.

    (e) Qualified receive-sites only-modifications (analog and digital):

    (1) Digital set top boxes;

    (2) Downconverters (with filtering)/antennas (replacement downconverters);

    (3) Contract labor:

    (i) Antenna change/DC install (antenna change may be necessary); and

    (ii) Electrical; and mechanical

    (4) Project management (third party or internal costs to manage the BTA conversion);

    (5) Proof of performance testing (may be contracted);

    (6) Mini headend (cost effective distribution method):

    (i) Modulators, combiners;

    (ii) Equipment racks; and

    (iii) Amplifiers

    (7) Cable, connectors; and

    (8) Training.

    (f) Miscellaneous transition fees.

    (1) Filing fees;

    (2) Arbitrator fee; and

    (3) Legal fees.

    [71 FR 35193, June 19, 2006]