§ 1843.7005 - Definitization.


Latest version.
  • (a) Undefinitized contract actions should be sufficiently complete and detailed as to enable the contractor to begin immediate preparation of a cost proposal for the changed requirement. The NASA goal is to definitive UCAs within 180 from date of issuance.

    (b) Whenever possible, pre-change study efforts or engineering change proposals (ECPs) shall be utilized to negotiate and definitize changes prior to issuance.