§ 225.202 - Exceptions.
Latest version.
-
225.202 Exceptions.
[65 FR 19851, Apr. 13, 2000, as amended at 68 FR 15619, Mar. 31, 2003; 80 FR 15912, Mar. 26, 2015(a) (2) A nonavailability determination is not required for construction materials listed in FAR 25.104(a). For other materials, a nonavailability determination shall be approved at the levels specified in 225.103(b)(ii). Use the estimated value of the construction materials to determine the approval level.
A nonavailability determination is not required before January 1, 2030, if there is an offer for foreign construction material that exceeds 55 percent domestic content (also see FAR 25.204(b)(1)(ii) and (b)(2)(ii)).
[89 FR 11954, Feb. 15, 2024]