§ 2452.237-79 - Post award conference.  


Latest version.
  • 2452.237-79 Post award conference.

    As prescribed in 2437.110(e)(5), insert the following clause in all contracts for services:

    Post Award Conference (MAR 2016)

    The Contractor shall be required to attend a post-award conference on DATE______ to be held at ADDRESS______, unless other arrangements are made. All Contractors must have a valid ID for security clearance into the building.

    (End of clause)

    Alternate I Post Award Conference (MAR 2016) If the conference will be conducted via telephone or video conferencing, substitute the following for the first and second sentences:

    The conference will be conducted via [telephone, video conferencing]. The Contracting Officer or designee will provide the contractor with the date, time and contact information for the conference.

    (End of Alternate I)

    [81 FR 13754, Mar. 15, 2016]