§ 2919.503-70 - Class set-aside for construction acquisitions.


Latest version.
  • (a) Each requirement for construction, alterations, maintenance, and repair (including architect-engineer services), estimated to cost up to $2 million shall be set aside for exclusive small business participation. Such set-asides shall be considered to be unilateral small business set-asides, and shall be withdrawn only in accordance with the procedures of FAR 19.506 and 2919.506 if found not to serve the best interest of the Government.

    (b) Small business set-aside preferences for construction acquisitions in excess of $2 million shall be considered on a case-by-case basis under conditions prescribed in FAR 19.502-2.