§ 2925.203 - Evaluating offers.  


Latest version.
  • Unless the Assistant Secretary for Administration and Management determines otherwise, when the cost of a comparable domestic construction material exceeds by more than 6 percent for large business or 12 percent for small business or labor surplus area set-aside the cost of a foreign construction material proposed in an offer, use of the domestic construction material would unreasonably increase the cost of the contract and use of the foreign construction material is authorized and acceptable. This evaluation shall be made for each foreign construction material proposed in an offer and not specifically excepted by the solicitation. The cost of construction material shall be computed to include all delivery costs to the construction site, and the cost of foreign construction material shall also include any applicable duty (whether or not a duty-free entry certificate may be issued). The acceptable offer that remains low after adding (for evaluation purposes only) 6 percent or 12 percent, as applicable, of the cost of all foreign construction materials shall be considered the successful offer. The contract awarded under these circumstances shall contain a list of the authorized foreign construction materials as required by FAR 25.202(c) and the clause at FAR 52.225-5, Buy American Act—Construction Materials.