§ 315.905-70 - Structured approach.  


Latest version.
  • (a) General. (1) The structured approach for determining profit or fee (hereafter referred to as profit) provides contracting officers with a technique that will ensure consideration of the relative value of the appropriate profit factors described in 315.905-71 in the establishment of a profit objective for the conduct of negotiations. The contracting officer's analysis of these profit factors is based on information available to him/her prior to negotiations. Such information is furnished in proposals, audit data, assessment reports, preaward surveys and the like. The structured approach also provides a basis for documentation of this objective, including an explanation of any significant departure from this objective in reaching an agreement. The extent of documentation should be directly related to the dollar value and complexity of the proposed acquisition.

    (2) The negotiation process does not require agreement on either estimated cost elements or profit elements. The profit objective is a part of an overall negotiation objective which, as a going-in objective, bears a distinct relationship to the cost objective and any proposed sharing arrangement. Since profit is merely one of several interrelated variables, the Government negotiator generally should not complete the profit negotiation without simultaneously agreeing on the other variables. Specific agreement on the exact weights or values of the individual profit factors is not required and should not be attempted.

    (b) Exceptions. (1) The profit-analysis factors set forth at FAR 15.905 shall be used for establishing profit objectives under the following listed circumstances. Generally, it is expected that this method will be supported in a manner similar to that used in the structured approach (profit factor breakdown and documentation of the profit objective); however, factors within FAR 15.905 considered inapplicable to the acquisition will be excluded from the profit objective.

    (i) Contracts not expected to exceed $100,000;

    (ii) Architect-engineer contracts;

    (iii) Management contracts for operation and/or maintenance of Government facilities;

    (iv) Construction contracts;

    (v) Contracts primarily requiring delivery of material supplies by subcontractors;

    (vi) Termination settlements; and

    (vii) Cost-plus-award-fee contracts (However, contracting officers may find it advantageous to perform a structured profit analysis as an aid in arriving at an appropriate fee arrangement).

    (2) Other exceptions may be made in the negotiation of contracts having unusual pricing situations. Such exceptions shall be justified in writing by the contracting officer in situations where the structured approach is determined to be unsuitable.

    (c) Limitation. The maximum profit objective shall be the percentage allowed pursuant to statute or regulation (see FAR 15.903(d)).

    (d) Profit objective. (1) A profit objective is that part of the estimated contract price objective or value which, in the judgment of the contracting officer, constitutes an appropriate amount of profit for the acquisition being considered. This objective should realistically reflect the total overall task to be performed and the requirements placed on the contractor.

    (2) Development of a profit objective should not begin until the following actions have been accomplished:

    (i) A thorough review of proposed contract work;

    (ii) A review of all available knowledge regarding the contractor pursuant to FAR subpart 9.1, including audit data, preaward survey reports and financial statements, as appropriate; and

    (iii) An analysis of the contractor's cost estimate and comparison with the Government's estimate or projection of cost.