§ 536.7105-6 - Allowances.  


Latest version.
  • 536.7105-6 Allowances.

    (a) Establishing a separate allowance in addition to the CCA is only permitted pursuant to a written determination approved by the contracting director supporting the use of any such allowance.

    (b) The written determination for a separate allowance in addition to the CCA shall consider the following:

    (1) Alternative contracting structures, such as a separate GMP line item or performing the work as part of the GMP option, and

    (2) Ensuring conformance with all applicable rules and procedures relating to allowances, including FAR 11.702.