§ 193.2621 - Testing transfer hoses.  


Latest version.
  • § 193.2621 Testing transfer hoses.

    Hoses used in LNG or flammable refrigerant transfer systems must be:

    (a) Tested once each calendar year, but with intervals not exceeding 15 months, to the maximum pump pressure or relief valve setting; and

    (b) Visually inspected for damage or defects before each use.