Subpart D - Construction  


§ 195.200 - Scope.
§ 195.202 - Compliance with specifications or standards.
§ 195.204 - Inspection - general.
§ 195.205 - Repair, alteration and reconstruction of aboveground breakout tanks that have been in service.
§ 195.206 - Material inspection.
§ 195.207 - Transportation of pipe.
§ 195.208 - Welding of supports and braces.
§ 195.210 - Pipeline location.
§ 195.212 - Bending of pipe.
§ 195.214 - Welding procedures.
§ 195.216 - Welding: Miter joints.
§ 195.222 - Welders and welding operators: Qualification of welders and welding operators.
§ 195.224 - Welding: Weather.
§ 195.226 - Welding: Arc burns.
§ 195.228 - Welds and welding inspection: Standards of acceptability.
§ 195.230 - Welds: Repair or removal of defects.
§ 195.234 - Welds: Nondestructive testing.
§ 195.236 - External corrosion protection.
§ 195.238 - External coating.
§ 195.242 - Cathodic protection system.
§ 195.244 - Test leads.
§ 195.246 - Installation of pipe in a ditch.
§ 195.248 - Cover over buried pipeline.
§ 195.250 - Clearance between pipe and underground structures.
§ 195.252 - Backfilling.
§ 195.254 - Above ground components.
§ 195.256 - Crossing of railroads and highways.
§ 195.258 - Valves: General.
§ 195.260 - Valves: Location.
§ 195.262 - Pumping equipment.
§ 195.264 - Impoundment, protection against entry, normal/emergency venting or pressure/vacuum relief for aboveground breakout tanks.
§ 195.266 - Construction records.
§§ 195.236--195.244 - [Reserved]