Subpart F - Operation and Maintenance  


§ 195.400 - Scope.
§ 195.401 - General requirements.
§ 195.402 - Procedural manual for operations, maintenance, and emergencies.
§ 195.403 - Emergency response training.
§ 195.404 - Maps and records.
§ 195.405 - Protection against ignitions and safe access/egress involving floating roofs.
§ 195.406 - Maximum operating pressure.
§ 195.408 - Communications.
§ 195.410 - Line markers.
§ 195.412 - Inspection of rights-of-way and crossings under navigable waters.
§ 195.413 - Underwater inspection and reburial of pipelines in the Gulf of Mexico and its inlets.
§ 195.414 - xxx
§ 195.415 - [Reserved]
§ 195.416 - xxx
§ 195.417 - Notification of potential rupture.
§ 195.418 - Valves: Onshore valve shut-off for rupture mitigation.
§ 195.419 - Valve capabilities.
§ 195.420 - Valve maintenance.
§ 195.422 - Pipeline repairs.
§ 195.424 - Pipe movement.
§ 195.426 - Scraper and sphere facilities.
§ 195.428 - Overpressure safety devices and overfill protection systems.
§ 195.430 - Firefighting equipment.
§ 195.432 - Inspection of in-service breakout tanks.
§ 195.434 - Signs.
§ 195.436 - Security of facilities.
§ 195.438 - Smoking or open flames.
§ 195.440 - Public awareness.
§ 195.442 - Damage prevention program.
§ 195.444 - Leak detection.
§ 195.446 - Control room management.
High Consequence Areas
§ 195.450 - Definitions.
Pipeline Integrity Management
§ 195.452 - Pipeline integrity management in high consequence areas.
§ 195.454 - xxx
§§ 195.414--195.418 - [Reserved]
§§ 195.417--195.419 - [Reserved]
§§ 195.417--195.419 - [Reserved]