Appendix A to Subpart B of Part 1730 - Review Rating Summary, RUS Form 300  


Latest version.
  • Appendix A to Subpart B of Part 1730 - Review Rating Summary, RUS Form 300

    Borrower Designation ________

    Date Prepared ________

    Ratings on form are:

    0: Unsatisfactory - no records

    1 : Unsatisfactory - corrective action needed

    2 : Acceptable, but should be improved - see attached recommendations

    3 : Satisfactory - no additional action required at this time

    N/A: Not applicable

    PART I - TRANSMISSION and DISTRIBUTION FACILITIES

    1. Substations (Transmission and Distribution)

    a. Safety, Clearance, Code Compliance - Rating: ________

    b. Physical Condition: Structure, Major Equipment, Appearance -

    Rating: ________

    c. Inspection Records Each Substation - Rating: ________

    d. Oil Spill Prevention - Rating: ________

    2. Transmission Lines

    a. Right-of-Way: Clearing, Erosion, Appearance, Intrusions -

    Rating: ________

    b. Physical Condition: Structure, Conductor, Guying - Rating: ________

    c. Inspection Program and Records - Rating: ________

    3. Distribution Lines - Overhead

    a. Inspection Program and Records - Rating: ________

    b. Compliance with Safety Codes: Clearances - Rating: ________

    Compliance with Safety Codes: Foreign Structures - Rating: ________

    Compliance with Safety Codes: Attachments - Rating: ________

    c. Observed Physical Condition from Field Checking: Right-of-Way - Rating: ________

    Observed Physical Condition from Field Checking: Other - Rating: ________

    4. Distribution - Underground Cable

    a. Grounding and Corrosion Control - Rating: ________

    b. Surface Grading, Appearance -

    Rating: ________

    c. Riser Poles: Hazards, Guying, Condition - Rating: ________

    5. Distribution Line Equipment: Conditions and Records

    a. Voltage Regulators - Rating: ________

    b. Sectionalizing Equipment -

    Rating: ________

    c. Distribution Transformers -

    Rating: ________

    d. Pad Mounted Equipment - Safety: Locking, Dead Front, Barriers - Rating: ________

    Pad Mounted Equipment - Appearance: Settlement, Condition - Rating: ________

    e. Kilowatt-hour and Demand Meter Reading and Testing - Rating: ________

    PART II - OPERATION AND MAINTENANCE

    6. Line Maintenance and Work Order Procedures

    a. Work Planning and Scheduling -

    Rating: ________

    b. Work Backlogs: Right-of-Way Maintenance - Rating: ________

    Work Backlogs: Poles - Rating: ________

    Work Backlogs: Retirement of Idle Services - Rating: ________

    Work Backlogs: Other - Rating: ________

    7. Service Interruptions

    a. Average Annual Hours/Consumer by Cause (Complete for each of the previous 5 years)

    1. Power Supplier ________

    2. Major Storm ________

    3. Scheduled ________

    4. All Other ________

    5. Total ________

    Rating: ________

    b. Emergency Restoration Plan - Rating:________

    8. Power Quality

    General Freedom from Complaints - Rating:________

    9. Loading and Load Balance

    a. Distribution Transformer Loading - Rating:________

    b. Load Control Apparatus - Rating:________

    c. Substation and Feeder Loading - Rating:________

    10. Maps and Plant Records

    a. Operating Maps: Accurate and Up-to-Date - Rating:________

    b. Circuit Diagrams - Rating:________

    c. Staking Sheets - Rating:________

    PART III - ENGINEERING

    11. System Load Conditions and Losses

    a. Annual System Loses, ________% - Rating:________

    b. Annual Load Factor, ________% - Rating:________

    c. Power Factor at Monthly Peak, ________% - Rating:________

    d. Ratio of Individual Substation Peak kW to kVA, ________ - Rating:________

    12. Voltage Conditions

    a. Voltage Surveys - Rating:________

    b. Substation Transformer Output Voltage Spread - Rating:________

    13. Load Studies and Planning

    a. Long Range Engineering Plan - Rating:________

    b. Construction Work Plan - Rating:________

    c. Sectionalizing Study - Rating:________

    d. Load Data for Engineering Studies - Rating:________

    e. Load Forecasting Data - Rating:________

    f. Energy Efficiency and Conservation Program quality assurance compliance - Rating:______

    PART IV - OPERATION AND MAINTENANCE BUDGETS

    For Previous 2 Years:

    Normal Operation - Actual $________

    Normal Maintenance - Actual $________

    Total - Actual $________

    For Present Year:

    Normal Operation - Budget $________

    Normal Maintenance - Budget $________

    Total - Budget $________

    For Future 3 Years:

    Normal Operation - Budget $________

    Normal Maintenance - Budget $________

    Additional (Deferred) Maintenance - Budget $________

    Total - Budget $________

    14. Budgeting:

    Adequacy of Budgets For Needed Work - Rating:________

    15. Date Budget Discussed with Board of Directors ________

    Remarks: ________

    EXPLANATORY NOTES

    Item No. ________ Comments ________

    Rated by ________ ________ Title ________ Date ________

    Reviewed by ________ Manager ________ Date ________

    Reviewed by ________ RUS GFR ________ Date ________

    [63 FR 3450, Jan. 23, 1998, as amended at 78 FR 73371, Dec. 5, 2013; 84 FR 32618, July 9, 2019]