Code of Federal Regulations (Last Updated: May 6, 2024) |
Title 7 - Agriculture |
Subtitle B - Regulations of the Department of Agriculture |
Chapter III - Animal and Plant Health Inspection Service, Department of Agriculture |
Part 305 - Phytosanitary Treatments |
Subpart - Heat Treatments |
§ 305.25 - Dry heat treatment schedules.
Latest version.
-
Treatment schedule Temperature ( °F) Time Directions T302-a-1-2 168 minimum At least 2 hours Spread the ears of corn in single layers on slats or wire shelves. T303-c-1 212 1 hour. T303-d-1 180-200 2 hours. T408-a 230-249 - 250-309
- 310-397
- 380-429
- 430-450
16 hours - 2 hours.
- 30 minutes.
- 4 minutes.
- 2 minutes.
Spread soil in layers 0.5 inches in depth to ensure uniform heat penetration. T412-a 248 15 minutes Start timing when the entire mass reaches 248 °F. 1 T412-b-1 212 15 minutes. T503-1-4, T503-2-4, T504-1-1, T504-2-1 212 1 hour Treat small bales only. T518-1 170 4.5 hours May take 2 hours to reach temperature. T518-2-1 180-200 2 hours. 1 A minimum of two temperature probes must be placed in the heat treating equipment in order to determine that all niger seed being treated reaches the target temperature. The treatment temperature must be recorded accurately, precisely, and regularly during treatment. The monitoring equipment must be locked before each treatment begins to prevent tampering. Seed processing equipment must have the capability to divert for retreatment any nontreated seeds or treated seeds that do not meet treatment standards.