95-11497. Acid Rain Program: Continuous Emission Monitoring Rule Technical Revisions  

  • [Federal Register Volume 60, Number 95 (Wednesday, May 17, 1995)]
    [Rules and Regulations]
    [Pages 26560-26571]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-11497]
    
    
    
    
    Federal Register / Vol. 60, No. 95 / Wednesday, May 17, 1995 / Rules 
    and Regulations 
    [[Page 26560]] 
    
    ENVIRONMENTAL PROTECTION AGENCY
    
    40 CFR Part 75
    
    [FRL-5203-2]
    
    
    Acid Rain Program: Continuous Emission Monitoring Rule Technical 
    Revisions
    
    AGENCY: Environmental Protection Agency (EPA).
    
    ACTION: Interim final rule and request for comments.
    
    -----------------------------------------------------------------------
    
    SUMMARY: Title IV of the Clean Air Act (the Act), as amended by the 
    Clean Air Act Amendments of 1990, authorizes the Environmental 
    Protection Agency (EPA or Agency) to establish the Acid Rain Program. 
    The program sets emissions limitations to reduce acidic deposition and 
    its serious, adverse effects on natural resources, ecosystems, 
    materials, visibility, and public health. On January 11, 1993, the 
    Agency promulgated final rules under title IV. Several parties filed 
    petitions for review of the rules. On April 17, 1995, the EPA and the 
    parties signed a settlement agreement addressing continuous emission 
    monitoring (CEM) issues.
        In this interim final rule, EPA is amending certain provisions of 
    the CEM regulations to allow industry to be in compliance in situations 
    that were not contemplated in the original rulemaking. The interim 
    final rule allows industry additional flexibility to implement new 
    provisions immediately that address these unforeseen situations, 
    reduces the possibility of underestimating emissions, and also allows 
    the public to comment upon these new provisions.
    
    DATES: Effective Dates. This interim final rule shall become effective 
    on July 17, 1995. The provisions of Secs. 75.11(a), 75.21(a), and 
    75.32(a)(3); sections 6.3.1, 6.3.2 and 6.4 of appendix A of part 75; 
    and section 2.1 of appendix B of part 75 are suspended temporarily from 
    July 17, 1995 through December 31, 1996. Sections 75.11 (e) and (g), 
    75.21(f), 75.30 (d) and (e), 75.32(a)(4), 75.55(e), and 75.56(a)(6); 
    Figure 5 and sections 6.3.3, 6.3.4 and 6.4.1 of appendix A of part 75; 
    section 2.1.7 of appendix B of part 75; and section 7 of appendix F of 
    part 75 are temporarily added and are effective from July 17, 1995 
    through December 31, 1996.
        Comment Date. Comments on this interim final rule must be received 
    on or before June 16, 1995.
    
    ADDRESSES: Any written comments on these interim final rule revisions 
    must be identified with the Docket No. A-94-16, must be identified as 
    comments on the interim final rule, and must be submitted in duplicate 
    to: EPA Air Docket (6102), Environmental Protection Agency, 401 M 
    Street SW, Washington, DC 20460. The docket is available for public 
    inspection and copying between 8:30 a.m. and 3:30 p.m., Monday through 
    Friday, at the address given above. A reasonable fee may be charged for 
    copying.
    
    FOR FURTHER INFORMATION CONTACT: Margaret Sheppard, Acid Rain Division 
    (6204J), U.S. Environmental Protection Agency, 401 M Street SW, 
    Washington, DC 20460, telephone number (202) 233-9180.
    
    SUPPLEMENTARY INFORMATION: All public comments received on the interim 
    final rule will be addressed in a subsequent final rulemaking notice. 
    The EPA will not institute a second comment period on this document. 
    Any parties interested in commenting on this interim final rule should 
    do so at this time.
        For additional information about further revisions to the Acid Rain 
    monitoring provisions, see the direct final rule published elsewhere in 
    this Federal Register.
        The EPA intends to publish a final rulemaking document as a follow-
    up to this interim final rule prior to January 1, 1997 that will 
    incorporate provisions based upon public comments. At that time, the 
    sections that are added temporarily by this interim final rule would be 
    permanently added by the follow-up final rule. Provisions that are 
    suspended temporarily in this interim final rule would be removed in 
    the follow-up final rule. If EPA were not to publish a follow-up final 
    rule prior to January 1, 1997, the sections temporarily added by the 
    interim final rule would expire and the sections suspended temporarily 
    by the interim final rule would be effective January 1, 1997.
    
    I. Background
    
        Title IV of the Clean Air Act (CAA or the Act), as amended November 
    15, 1990, requires the Environmental Protection Agency (EPA or Agency) 
    to establish an Acid Rain Program to reduce the adverse effects of 
    acidic deposition. On January 11, 1993, the Agency promulgated final 
    rules implementing the program, including the General Provisions of the 
    Permits Regulation and the CEM rule (58 FR 3590-3766). Technical 
    corrections were published on June 23, 1993 (58 FR 34126) and July 30, 
    1993 (58 FR 40746-40752). This notice of interim final rulemaking, like 
    the notice of direct final rulemaking published elsewhere in this issue 
    of the Federal Register, contains additional technical corrections and 
    other amendments to address various implementation issues that have 
    come to light since the final rule was published on January 11, 1993. 
    The effective date of these interim final amendments will be July 17, 
    1995.
        The EPA has been engaged in settlement discussions with several 
    parties who challenged certain provisions of the Acid Rain CEM rules 
    promulgated on January 11, 1993. [See Environmental Defense Fund v. 
    Browner, No. 93-1203 and consolidated cases, ``Complex'' (D.C. Cir., 
    filed March 12, 1993.] Although the parties have been able to reach 
    agreement on a number of issues, which are addressed in the direct 
    final rule, some additional issues remain outstanding. These 
    outstanding issues, unlike the noncontroversial and routine technical 
    corrections addressed by the direct final rule, may not be considered 
    noncontroversial and therefore are being addressed separately in this 
    interim final rule. The issues addressed by this interim final rule 
    are: (1) A requirement that units with SO2 CEMS burning gaseous 
    fuels only must use heat input and a default SO2 emission rate or 
    appendix D methods to determine SO2 emissions instead of an 
    SO2 CEMS and a flow monitor [Sec. 75.11(e)], (2) the procedure for 
    assigning proportional flow rates for emissions through multiple stacks 
    or bypass stacks for purposes of substituting missing data 
    [Sec. 75.30(e)], (3) the procedure for determining proper operation of 
    units with add-on controls for purposes of substituting missing data 
    (Sec. 75.34), (4) clarification of provisions in the January 11, 1993 
    rule that the unit must be operating while performing certain quality 
    assurance procedures (appendix A, sections 6.3.1 and 6.3.2; appendix B, 
    section 2.1 Introductory Text), and (5) the procedures for performing 
    cycle time tests (appendix A, section 6.4).
        In order to allow for necessary changes to the data acquisition and 
    handling systems (DAHS) required by the revisions to Secs. 75.11(e) and 
    75.30(e), owners or operators may choose to delay compliance with the 
    revised provisions regarding use of heat input and a default SO2 
    emission rate or appendix D methods for units with SO2 CEMS when 
    burning only gaseous fuels [Sec. 75.11(e)] or with the procedure for 
    assigning proportional flow rates for emissions through multiple stacks 
    or bypass stacks for purposes of missing data substitution 
    [Sec. 75.30(e)] until January 1, 1997. The EPA believes that this will 
    give utilities time to comment [[Page 26561]] on these issues and EPA 
    time to respond to these issues in a final rulemaking before the 
    provisions become required. Furthermore, EPA believes an optional 
    delayed compliance date for these revised provisions is warranted 
    because utilities may need time to incorporate these changes into their 
    DAHS, emissions will be monitored under the current regulations until 
    the changeover, and emissions affected by these provisions will be 
    small.
    II. EPA Action
    
        Under CAA Section 412(c), not later than January 1, 1995, owners 
    and operators of Acid Rain affected units must install and operate 
    CEMS, quality assure the data, and keep records and reports in 
    accordance with the Acid Rain regulations. Because EPA believes the 
    revisions published in this rule will improve and enhance the 
    implementation of the Acid Rain monitoring program, EPA believes it is 
    necessary that the revisions become effective as soon as possible. Many 
    of the monitoring provisions in part 75 are interrelated and would be 
    difficult to separate from other, related provisions and therefore 
    these technical revisions to the monitoring provisions must be 
    considered as a whole. For these reasons, EPA is publishing the 
    noncontroversial revisions through a direct final rulemaking and is 
    also publishing provisions that may be controversial and on which it 
    may receive comment through this interim final rulemaking. Both the 
    direct final rule and the interim final rule will become effective on 
    the same date. Even though comments may be submitted on these interim 
    final provisions, EPA believes that it is necessary to include the 
    interim final revisions in the revised CEM regulation in order to 
    assure an overall consistent and implementable Acid Rain monitoring 
    program. Therefore, EPA is issuing these amendments to the CEM 
    regulation effective at the same time as the direct final amendments 
    and will take comment on both sets of revisions. Comments on the 
    interim final provisions must be submitted to Air Docket A-94-16, which 
    is also the docket for the direct final rulemaking published elsewhere 
    in this issue of the Federal Register, and must be identified as 
    comments on the interim final rule to distinguish them from comments on 
    the direct final provisions. Because the provisions of the direct final 
    rule and interim final rule are interrelated, the docket contains 
    supporting material and relevant information for both rulemakings.
        As described in the notice of direct final rulemaking, if EPA 
    receives significant adverse comments on the direct final rule, EPA 
    will withdraw those portions of the direct final rule upon which 
    comments are submitted, address the comments, and subsequently issue a 
    final rule that addresses the withdrawn portions of the direct final 
    rule. Except for certain specified subsections which will cease to be 
    in effect as of January 1, 1997, the interim final rule will remain in 
    effect until EPA publishes a subsequent final rule, following 
    consideration of comments received in response to the notice of 
    proposed rulemaking corresponding to this interim final rule. At the 
    time of that future rulemaking, sections that are temporarily added in 
    today's interim final rule would be permanently added and would replace 
    provisions in the current rule that are temporarily suspended.
        The EPA has been addressing many technical issues during early 
    implementation of the Acid Rain monitoring program through issuance of 
    policy statements interpreting the monitoring provisions of the January 
    11, 1993 rule, as well as by issuance of technical guidance. Many of 
    the clarifying policy statements and technical guidance, which are to a 
    large extent reflected in the direct final rule and interim final rule, 
    are now being used by utilities for implementation guidance. Therefore, 
    EPA believes it would be contrary to the public interest to delay the 
    effectiveness of these monitoring provisions and believes these 
    technical revisions should be effective immediately. Because EPA 
    believes it is necessary to issue the technical corrections to the CEMS 
    regulation as soon as possible and because the revised portions of the 
    monitoring provisions are integrally interrelated, EPA believes it 
    necessary for the full complement of revisions to take effect at the 
    same time. The EPA is therefore invoking the good cause exception under 
    the Administrative Procedure Act (APA) in not providing an opportunity 
    for comment before this interim final rule takes effect.1 [See 5 
    U.S.C. 553(b)(B); see also 42 U.S.C. 7607(d)(1).] Under CAA Section 
    307(d)(1), subsection 307(d) does not apply in the case of a rule for 
    which the agency invokes the good cause exception of 5 U.S.C. 
    553(b)(B). Therefore, CAA Section 307(d) does not apply to this interim 
    final rule. The EPA believes that notice-and-comment rulemaking prior 
    to the effective date of the interim final rule would be impracticable 
    and contrary to the public interest because of the complex and 
    interrelated nature of the monitoring provisions that make it necessary 
    to revise all of the CEM provisions in a consistent and integrated way 
    in order to avoid inconsistency in monitoring requirements and because 
    of the need to make the technical corrections and amendments available 
    for use by utilities as soon as possible.
    
        \1\As previously noted however, EPA is providing the public with 
    an opportunity to comment on EPA's direct final rule and will 
    withdraw any portions of the direct final rule upon which 
    significant adverse comments are submitted.
    III. Rationale
    
    A. SO2 Monitoring During Combustion of Gas for Units With SO2 
    CEMS
    
        Some coal-fired units and oil-fired units also combust pipeline 
    natural gas. Natural gas has a very low sulfur content and will produce 
    extremely low SO2 concentrations when combusted alone. In order to 
    monitor these low concentrations accurately, a utility would need to 
    use an SO2 monitor with a range of a few parts per million (ppm). 
    At this range, there are no Protocol 1 gases available for 
    calibrations. Furthermore, it is unlikely that the CEMS would be able 
    to pass the relative accuracy test at such low levels because it is 
    difficult to measure extremely small concentrations precisely with 
    either the reference method or a CEMS. The EPA had concerns about the 
    accuracy of the SO2 concentration data when measuring natural gas 
    alone, because of the extremely low concentrations and because of the 
    difficulty in performing appropriate quality assurance testing. The EPA 
    decided that it was inappropriate for units to use an SO2 CEMS to 
    measure emissions from natural gas only. However, a coal-fired, oil-
    fired, or gas-fired unit could still use an SO2 CEMS for measuring 
    SO2 when combusting fuels other than natural gas (or other gaseous 
    fuel with a sulfur content no greater than natural gas) or when 
    combusting a combination of fuels.
        In order to address this situation, some industry representatives 
    requested to use the provisions of appendix D of part 75 for 
    determination of SO2 emissions from natural gas instead of use of 
    an SO2 CEMS. (See Docket Item II-D-29, Letter from B. Machaver to 
    S. Jewett, November 30, 1993; Docket Item II-D-30, Log of telephone 
    conversation on Questions Concerning 40 CFR Part 75 Regulations for 
    Oil/Gas Fired Title IV Affected Units (Questions provided in November 
    30, 1993 Memorandum to Susan Jewett), December 7, 1993.) After 
    consideration, EPA agreed that this [[Page 26562]] would be an 
    acceptable alternative to using the SO2 CEMS during combustion of 
    low sulfur gaseous fuel, so long as the utility certifies an excepted 
    monitoring system under appendix D of part 75 for the measuring of gas. 
    This requires accuracy testing of a gas flowmeter and testing of the 
    DAHS. Furthermore, the utility must perform the procedures under 
    appendix D, with the same fuel sampling, analysis, and fuel flowmeter 
    quality assurance/quality control (QA/QC) requirements.
        Another variant suggested by a utility was to use the default 
    SO2 emission rate factor of 0.0006 pound per million British 
    thermal units (lb/mmBtu) for pipeline natural gas that EPA previously 
    discussed in a policy statement regarding the ``NADB emission rate'' in 
    appendix D and the heat input calculated by a flow monitor and a 
    diluent monitor. (See Docket Item II-D-54, Acid Rain CEM (Part 75) 
    Policy Manual; Docket Item II-D-59, Letter from R. LaBorde, Central 
    Louisiana Electric Company to J. Winkler, EPA Region VI Re: Requestion 
    for Clarification, Rodemacher Power Station Unit-1, Rapides Parish, LA, 
    August 3, 1994). After further consideration, EPA agreed that this also 
    is acceptable. (See Docket Item II-D-67, Response to R. LaBorde, CLECO, 
    from J. Hepola, EPA, August 25, 1994.) The owner or operator must 
    certify the system using the flow monitoring system, the diluent 
    monitor, and the DAHS as a system for monitoring SO2 emissions. 
    These monitors must be tested following the QA/QC requirements of 
    appendix B of part 75. Both of these methods allow utilities to use 
    provisions that are allowed for estimating the low SO2 emissions 
    due to combustion of gaseous fuels with a low sulfur content under 
    appendix D of part 75. The EPA believes that these methods will allow 
    SO2 accounting with sufficient accuracy for the low emission rate 
    from combustion of natural gas. These methods are not sufficiently 
    accurate for combustion of oil or coal because of their higher sulfur 
    content. Similarly, during periods of co-firing of oil, coal or other 
    high sulfur fuels, the owner or operator must use the certified 
    SO2 CEMS.
    
    B. Missing Data Substitution Provisions
    
    1. Missing Data Procedures for Units With Add-On Emission Controls
        Many utilities were uncertain of the requirements for substituting 
    and reporting missing data for units with add-on emission controls. For 
    instance, the regulation was not clear as to whether or not parametric 
    data needed to be reported and recorded for these units. Industry also 
    commented that the possible options for substituting missing data were 
    unclear for these units. (See Docket Item II-D-3, Discussion Issues for 
    TU Electric and EPA; Docket Item II-D-4, Draft Meeting Notes for EPA-
    Texas Utilities Teleconference, December 7, 1992 ). In response to 
    these concerns, EPA prepared a policy statement to clarify missing data 
    substitution procedures for units with add-on emission controls. (See 
    Docket Item II-D-54, Acid Rain CEM (Part 75) Policy Manual). The EPA 
    has amended part 75 in part to incorporate these interpretations.
        The amendments to part 75 allow four ways of substituting for 
    missing data. The default option is to substitute the maximum potential 
    concentration of SO2 or the maximum potential NOX emission 
    rate when no information on the emission controls is available. A unit 
    with SO2 add-on emission controls with an inlet monitor may 
    instead use the maximum SO2 concentration at the scrubber inlet 
    during the previous 720 quality-assured monitor operating hours. This 
    option may always be used by a source.
        Another option is to develop a site-specific correlation to 
    determine the removal efficiency of the control equipment. The 
    designated representative for a unit will petition the Administrator 
    for use of this correlation instead of following standard missing data 
    substitution procedures. The requirements for using this correlation as 
    a missing data substitution method are located in appendix C of part 
    75. The correlation involves monitoring emission control parameters and 
    electronically reporting this data for each missing data period to EPA 
    each quarter. This correlation method may only be used if the 
    availability or the CEMS at the outlet of the emission controls is 90.0 
    percent or greater.
        A third option is to use the standard missing data procedures and 
    to keep information on the emission controls at the site. The 
    parameters listed in appendix C are a guideline of the types of 
    information that are to be used to verify the add-on emission controls 
    are operating properly. The EPA considers ``proper operation'' of the 
    control equipment to require that the removal efficiency is equal to or 
    greater than that when monitor data is available, such as during the 
    hours before and after the missing data period. It is not enough to 
    show that the control device simply is operating. The information that 
    a utility should keep relates to site-specific equipment. Part 75 does 
    not require that every single one of those parameters must be kept, nor 
    does it prohibit the use of other information to verify proper 
    operation of the emission controls. Also, these records do not have to 
    be kept electronically. However, the designated representative must 
    report in the monitoring plan for the unit the range of each parameter 
    that indicates proper operation of the add-on emission controls. The 
    EPA or a State air pollution control agency could request to look at 
    the parametric records or to have them reported at any time to verify 
    that the add-on emission controls are maintaining emission reductions 
    and are operating properly, by comparing the data with the range of 
    each parameter reported in the monitoring plan. In addition, a 
    designated representative for a source must certify that the emission 
    controls are properly operating and that the missing data procedures 
    are not systematically underestimating emissions during the quarter 
    where the utility uses the standard missing data procedures. This 
    additional certification is to be reported as part of the designated 
    representative's certification with each quarterly report.
        The fourth and final option for supplying missing data is to use 
    the standard missing data procedures as in the third option, and then 
    to petition the Administrator for use of a value more representative of 
    actual emissions than the maximum SO2 concentration in the 
    previous 720 hours or the maximum NOX emission rate at the 
    corresponding load range. As in the existing rule, this is only an 
    option when monitor data availability is below 90.0 percent, where the 
    most conservative missing data substitution procedures are required. A 
    designated representative may petition to substitute with a more 
    representative value that does not underestimate emissions if 
    sufficient data exist to demonstrate that the maximum value is an 
    extreme overestimate, based upon periods of improper operation or non-
    operation of the emission controls. This demonstration requires 
    information such as: CEM data from periods when the add-on emission 
    controls are operating; unit operating load data; parametric data 
    indicating proper operation of the add-on emission controls during the 
    missing data period; and fuel sulfur content. The EPA expects a 
    ``representative value'' to be no less than the maximum hourly value 
    from when the emission controls were operating during the same lookback 
    period normally used for an SO2 or NOX CEMS.
        The EPA has also made minor changes to indicate that petitions are 
    submitted by the designated [[Page 26563]] representative, rather than 
    the owner or operator. This is consistent with the designated 
    representative's role as the official contact person for EPA for all 
    submissions.
    2. SO2 Concentration Missing Data During Gas Combustion
        A utility noted that for a unit that combusts either natural gas 
    and some oil or natural gas and some coal, SO2 emissions due to 
    gas combustion are several orders of magnitude smaller than emissions 
    during combustion of either coal or oil (See II-D-16, Letter from David 
    Rengert, Niagara Mohawk Power Corporation to Ann Zownir, EPA, May 21, 
    1993). Therefore, if an SO2 CEMS was not providing quality-assured 
    data when the unit was combusting only natural gas, the standard 
    missing data procedures might substitute vastly overestimate SO2 
    concentration values from combustion of coal or oil. In addition, if 
    the unit combusts primarily natural gas, these low SO2 
    concentration values could potentially underestimate emissions when 
    combusting oil or coal if the 90th percentile and 95th percentile (and 
    possibly even the maximum value) during the previous 720 quality-
    assured monitor operating hours were substituted using all data 
    collected from all fuels. To address this concern, EPA revised the 
    missing data procedures to separate SO2 emissions due to 
    combustion of natural gas and other gaseous fuels with a sulfur content 
    no greater than that of natural gas. SO2 concentration values 
    measured by an SO2 monitoring system during combustion of natural 
    gas only are not kept as part of the historical data that is used to 
    substitute SO2 concentration data. These values are not used to 
    provide the average of the hour before and the hour after a missing 
    data period and are not included in percentile calculations. As a 
    result, substituted missing data will reflect the fuel being used 
    during the missing data period.
        As was discussed under Section A above, as of January 1, 1997, 
    SO2 CEMS will no longer be allowed for measuring SO2 during 
    combustion of natural gas or other gaseous fuels with a sulfur content 
    no greater than that of natural gas because of the difficulty of 
    accurately measuring and quality assurance testing at such low 
    concentrations.
        During those times, a utility will either use the heat input from 
    the flow monitor and diluent monitor and the default SO2 emission 
    rate for pipeline natural gas of 0.0006 lb/mmBtu according to appendix 
    F of part 75, or the fuel flow and daily sulfur content of the gaseous 
    fuel according to appendix D of part 75. The utility should use the 
    following to fill in missing data if a fuel flowmeter, a flow monitor 
    or a diluent monitor is not providing quality-assured data. For units 
    combusting pipeline natural gas using a flow monitor, a diluent monitor 
    and the default SO2 emission rate, the owner or operator should 
    follow the missing data procedures for heat input found in Sec. 75.36 
    of subpart D of part 75. For other units using gas sampling and 
    analysis and fuel flowmeters, the owner or operator should substitute 
    using the missing data procedures for sulfur content or fuel flow found 
    in appendix D of part 75.
        Note that these revised procedures are not needed if a unit is co-
    firing a high sulfur fuel along with natural gas or other gaseous fuels 
    with a sulfur content no greater than that of natural gas. In this 
    case, the concentration will come predominantly from the higher-sulfur 
    fuel, generally oil or coal. Thus, during periods of co-firing, the 
    owner or operator should be using the SO2 CEMS or the missing data 
    procedures in Secs. 75.31 or 75.33 for an SO2 CEMS.
    3. Missing Data for Multiple Stacks and Bypass Stacks
        The EPA has added a provision to account for missing data 
    substitution of flow data in the case of multiple stacks or bypass 
    stacks in Sec. 75.30(e) of today's interim final rule. First, this 
    revision accounts for the fact that emissions may not flow through a 
    particular stack during an hour when the unit combusts fuel. To account 
    for this, EPA has added a provision to the missing data procedures such 
    that only hours when emissions pass by the monitors on the stack are 
    included as unit operating hours and as quality-assured monitor 
    operating hours in calculations of availability and substitute values.
        A second provision accounts for the fact that some units may be 
    able to shift flow between ducts or stacks. If flow from a unit can 
    shift from one stack to another, such as when flue dampers are moved, 
    then the correlation between load for the entire unit and flow rate 
    measured on one stack is no longer accurate. It would be possible to 
    underestimate flow rate and SO2 mass emissions during use of the 
    missing data procedures for flow, contrary to EPA's intent for these 
    missing data procedures. In order to avoid this situation, EPA has 
    added a provision in today's rule that requires using a substitute 
    value of the maximum flow rate recorded by the flow monitoring system 
    at the corresponding load range during the previous 2,160 hours of 
    quality-assured monitor data when emissions passed through the stack if 
    the proportion of flow between stacks has changed during that time. 
    This will avoid potential underestimation that might occur when using 
    an average flow rate in the corresponding load range. As discussed 
    above in this notice, owners or operators may choose to delay 
    compliance with this requirement until January 1, 1997 in order to make 
    changes to their DAHS and to await implementation of these provisions 
    until after EPA has addressed all comments on the interim final rule. 
    In addition, EPA notes that if a utility never changes the flue dampers 
    so that the proportion of flow is constant, then no changes to the 
    standard missing data procedures or to their DAHS are necessary.
    
    C. Certification and Quality Assurance Testing
    
    1. Calibration Error Test
        The EPA discovered that some CEMS testers were incorrectly 
    performing the 7-day calibration error test. In the incorrect use of 
    the procedure, the tester checked the calibration error at the zero 
    calibration gas level, made automatic adjustments to the monitor data 
    at that point, checked the calibration error at the high calibration 
    gas level, and then again made adjustments to the data. The EPA 
    clarified that a tester should check the calibration error both at the 
    zero level and the high level before making any adjustments. Both in 
    the preamble to part 75 (January 11, 1993) and in a public issue paper 
    on the 7-day calibration error test, EPA stated that this second 
    interpretation is the correct one. (See Docket Item II-D-27, Issue 
    Paper on Part 75 Calibration Error Testing for Certification, October 
    8, 1993; Letter from J. White to D. McNeal, and Response to J. White 
    from S. Saile, EPA). The EPA has adopted this interpretation of testing 
    both instrument levels together because instrument errors at the zero 
    and high levels are not always independent of each other. These interim 
    amendments to part 75 clarify this provision.
        Another related issue associated with the 7-day calibration error 
    test concerned the kinds of adjustments that could be made. 
    Requirements of the calibration error tests in 40 CFR part 75 and 40 
    CFR part 60 could be interpreted as requiring either 7 successive daily 
    tests or one cumulative 7-day test. The following statements in the 
    January 11, 1993 rule imply that the 7-day test is cumulative:
    
        Do not make manual adjustments to the monitor setting during the 
    7-day test. If automatic adjustments are made, conduct the 
    calibration error test in a way that the [[Page 26564]] magnitude of 
    the adjustments can be determined and recorded. (section 6.3.1 of 
    appendix A.)
    
        However, EPA stated in Section V.G(4)(a) of its January 11, 1993 
    preamble to part 75 that ``the 7-day calibration error test performed 
    during certification is the same 2-point drift test as the daily 
    calibration error test'' and referred to 40 CFR part 60, appendix B in 
    Section V.G(4)(b) (58 FR 3641). Industry generally interprets the 
    calibration drift test in 40 CFR part 60 to require 7 separate daily 
    tests, rather than a cumulative test over 7 days. (See Docket Item I-C-
    3, Jahnke, James A., Excerpt from Continuous Emission Monitoring, Van 
    Nostrand Reinhold, New York.) The EPA now clarifies part 75 to state 
    its original intention that the 7-day calibration error test is a 
    series of 7 daily calibration error tests. On each day of the test, the 
    monitor must meet the performance specification of a calibration error 
    no greater than 2.5 percent of span. Because this is a series of tests, 
    a tester may not adjust the monitor or monitor data, either manually or 
    automatically, until the test has been completed at both levels on any 
    given day. However, the tester may make adjustments between daily 
    tests, once the previous day's test results have been recorded.
    2. Quality Assurance of Data Following Daily Calibration Error Test
        During early implementation EPA began developing a series of 
    policies in order to assist in its evaluation of the acceptability of 
    data received in quarterly reports. Among these policies concerned the 
    acceptability of data when a required daily test is not performed. The 
    Agency initially decided that the absence of information on a test 
    during a calendar day means that emissions data for that day are not 
    considered quality-assured. Section 2.1 of appendix B requires daily 
    assessments, such as calibration error tests and interference checks, 
    to be performed on each calendar day. Based on this requirement, EPA 
    initially interpreted data as invalid for a calendar day from midnight 
    to the time of the next successful daily calibration error test if no 
    test results were reported. (See Docket Items II-D-56, ETS User 
    Bulletin #2 and II-D-50, Electronic Data Reporting Supplementary 
    Instructions, June 29, 1994.)
        Some utilities expressed concern that a unit might stop operating 
    during the middle of a day before the regularly scheduled time for 
    performing an automated calibration. (See Docket Item II-D-60, Letter 
    from Gary R. Cline, Pennsylvania Electric Co., to Margaret Sheppard, 
    EPA, August 1, 1994.) Because the testing procedures require the unit 
    to operate during all measurements, the utility would be unable to 
    perform this test and its data would be invalidated beginning at 
    midnight. Some suggestions from utilities included: allowing 
    performance of the test while the unit is off-line, treating the data 
    as quality assured until the time of the next test, and treating the 
    data as quality-assured prospectively for 24 hours from the previous 
    test.
        The EPA decided that the approach consistent with the regulatory 
    language that would result in the greatest amount of quality-assured 
    data while still preserving the requirement for a daily test is to 
    retain the calendar day requirement for performing each daily test. 
    However, if a unit stops operating during a calendar day, then data is 
    still considered quality-assured for 24 clock hours from the previous 
    day's test. For example, a unit with monitors that are normally 
    calibrated at 8 a.m. performs the calibration error test at 8 a.m. on 
    January 11. All 24 hours of data from the monitor for January 11 are 
    quality-assured. If the unit suddenly ``trips'' and stops operating at 
    6 a.m. on January 12, the data from midnight until 6 a.m. are also 
    considered quality-assured. If the unit starts up again at 3 p.m. but 
    the monitors are not tested between 3 p.m. and midnight, then that 
    block of data is invalidated. As in the January 11, 1993 rule, today's 
    rule still requires a calibration error test to be performed with the 
    unit operating. This is because the readings from the CEMS are affected 
    by temperature and pressure conditions. (See Docket Item II-D-39, Log 
    of telephone conversation between Jon Konings, WEPCo, and M. Sheppard, 
    EPA, on EPA's policy on conducting calibration error test, April 13, 
    1994.) In order to ensure accurate CEMS measurements for the entire 
    system and to ensure that this test is performed under controlled 
    conditions, EPA requires the daily calibration error tests to be 
    performed while the unit is operating for purposes of quality-assuring 
    the data and testing the CEMS. (See Docket Item II-D-54, Acid Rain CEM 
    (Part 75) Policy Manual.)
    3. Unit Operation During Testing
        This issue is related to provisions of section 6 of appendix A of 
    part 75 and to the tests performed under appendix B of part 75. Under 
    the January 11, 1993 rule, section 6.1 of appendix A requires that a 
    unit be operated during periods when measurements are made for 
    certification testing. Similarly, section 6.2 indicates that when 
    performing a linearity check, testers are to conduct each test by 
    operating the monitor at its normal (unit) operating temperature and 
    conditions. In this interim rule, EPA further clarifies provisions in 
    the January 11, 1993 rule, providing that the unit must be operating, 
    by adding language to sections 6.3.1, 6.3.2, and 6.4 for the 
    calibration error test and for the cycle time test. These sections are 
    later cited in appendix B. This language addition clarifies EPA's 
    intent that a unit must be operating during all monitor testing, both 
    for initial certification testing and for QA/QC testing.
        During the public comment period for the proposed part 75 
    regulation, some commenters raised this issue. (See Docket A-90-51, 
    Docket Item IV-D-303, Letter from Nicolson, Rober J., Vice President, 
    Fossil & Hydro Operations, Consumers Power Company, Comments on Clean 
    Air Act Amendments--Title IV Part 75 Continuous Emission Monitoring 
    Rule and Docket A-91-69, Item IV-D-66, Letter from Sullivan, J.J., 
    Executive Director, Environmental Programs, PSI Energy, Inc., Comments 
    on the Proposed Acid Rain Program Rule: 40 CFR Part 72, 73, 75 and 77.) 
    Under the new source performance standard for subpart Da of 40 CFR part 
    60 and under the performance specifications in appendix B of 40 part 
    60, EPA required a unit to operate for 168 hours in a row in order to 
    perform the 7-day calibration error test for monitors. In part 75, EPA 
    modified this to allow units to operate only during the periods when 
    measurements were performed and by allowing operation on nonconsecutive 
    days. This change was made to account for peaking units, which normally 
    would not operate for every hour of every day. However, EPA still 
    required the unit to be operating during testing so that the test will 
    be performed under the same temperature and pressure conditions as when 
    monitor readings are taken during the program. (See Docket A-90-69, 
    Docket Items V-C-1 and V-C-2, Response to Comment Document.)
        The test procedures for linearity checks and for calibration error 
    tests require the entire monitoring system to be tested, rather than 
    just the analyzer. For example, sections 6.2 and 6.3.1 of appendix A 
    requires introducing calibration gas through the gas injection port, 
    which for most systems will be at the probe. The calibration gas must 
    go through as much of the system as possible, including the probe, 
    filters, scrubbers, conditioners, and other monitor components for 
    extractive type monitoring systems, or including all active electronic 
    and optical components for in situ type monitors. 
    [[Page 26565]] Monitor responses must come from the DAHS. Thus, the 
    test is a test of the complete continuous emission monitoring system. 
    (See Docket Item II-D-68, Memorandum from B. Warren-Hicks, The Cadmus 
    Group to M. Sheppard, EPA, September 6, 1994). In order to make the 
    linearity check and calibration error test a true test of the entire 
    monitoring system, the tests must be performed under the same unit 
    operating conditions that prevail when the monitor reads emissions to 
    include in certification test results and in quarterly emissions 
    reports. The EPA has already stated this policy in question Number 
    12.17 of its policy guidance manual. (See Docket Item II-D-54, Acid 
    Rain CEM (Part 75) Policy Manual.) Utilities have also commented on the 
    significant effects of temperature and pressure conditions upon monitor 
    readings. (See Docket Items II-D-39, Conversation between J. Konings, 
    WEPCo and M. Sheppard, EPA:ARD, on EPA's policy on conducting 
    calibration error test, April 13, 1994; II-D-40, Meeting Notes from EPA 
    Meeting with J. West of Metropolitan Edison and J. Jahnke of Source 
    Technology Associates, April 18, 1994.).
        The procedures of the relative accuracy test and the cycle time 
    test require continuous emission monitoring systems and flow monitors 
    to measure the actual emissions at the stack. Therefore, these tests 
    can only be performed while the unit is operating.
        The EPA does not consider test results to be valid if the test is 
    performed while the unit is not operating.
        Thus, in this interim rule, EPA clarifies that a unit must be 
    operating when a test is performed in order to provide acceptable 
    results to meet requirements for certification testing or QA/QC 
    testing. This is also consistent in a new provision in section 2.1 of 
    appendix B of part 75. This provision allows data to be considered 
    valid for 24 hours following the last passed calibration error test if 
    a unit stops operating on a calendar day before the utility has 
    performed a calibration error test on that day. However, if a daily 
    calibration error test were failed or if the daily calibration error 
    test were performed while the unit is not operating, the data after 
    that test would not be considered valid.
    4. Cycle Time Test
        Part 75 included a cycle time/response time test to determine if a 
    CEMS was capable of drawing down and analyzing a sample frequently 
    enough to provide an update at least four times an hour. A tester was 
    required to perform this test on the SO2 pollutant concentration 
    monitor, the NOX CEMS (in lb/mmBtu), and the CO2 pollutant 
    concentration monitor. Some testers found the regulatory procedures 
    unclear as to when a source tester samples stack gas. In addition, EPA 
    staff realized that some CEMS cannot perform the cycle time/response 
    time test simultaneously on the NOX and diluent gas components of 
    the NOX CEMS, because NOX and O2 cannot be kept in the 
    same bottle for reasons of stability.
        As a result of these issues raised during implementation, EPA has 
    revised the cycle time/response time test to be a cycle time test 
    patterned after the response time test in Method 20 of appendix A of 40 
    CFR part 60. A cycle time test is a test to determine the length of 
    time it takes for a CEM system to draw down a sample of gas, analyze 
    the sample, achieve a stable reading, and record the new concentration. 
    More specifically, the cycle time test determines 95 percent of the 
    length of time for the monitor to go from reading a known concentration 
    of calibration gas to reading actual stack emissions. (The 95-percent 
    margin allows for small amounts of error that will prevent a monitor 
    from reading the labelled value of a calibration gas, even when the 
    monitor reading is stable.) A tester starts by introducing calibration 
    gas until the monitor reading is stable. Next, the tester switches the 
    monitor to reading stack gas emissions. When the monitor response is 
    stable, the tester notes the time. The DAHS records each value that the 
    monitor reads and the time of the reading. Once the DAHS has recorded 
    this stable value, the tester introduces the other calibration gas. The 
    procedure is repeated, so that the monitor returns to a stable reading 
    of stack gas and records it. This revised procedure will allow more 
    time-share monitoring systems to pass the cycle time test than the 
    earlier cycle time/response time test, because the revised test 
    eliminates the time it takes for gas to travel from the calibration gas 
    cylinder to the probe.
        Stability is considered to be achieved when the monitor reading 
    changes by less than 5 percent from the average concentration over a 5-
    minute period, or less than 1 percent of the monitor span over 30 
    seconds. These values were adapted from the response time test found in 
    Method 20 of appendix A, 40 CFR part 60 for testing of stationary gas 
    turbines. The EPA made the definition of stability more flexible by 
    lengthening the time period for averaging concentration from 2 minutes 
    to 5 minutes, in order to apply to coal-fired boilers, which may 
    experience less stable loads than stationary gas turbines. Based upon 
    results from certification tests at Phase I units, EPA believes that 
    coal-fired units can reliably achieve this definition of stability. 
    (See Docket Item II-D-75, Analysis of Cycle Time/Response Time Data, 
    October 3, 1994.)
        The longer of the two times going from calibration gas to stack gas 
    is the cycle time of the component monitor. For a NOX or SO2-
    diluent monitoring system, the cycle time is the longer of the two 
    cycle times for the NOX or SO2 pollutant concentration 
    monitor and the diluent monitor. Originally, testers were required to 
    test both component monitors at the same time, which requires injecting 
    both gases simultaneously. Testing the two component monitors 
    separately simplifies performing the cycle time test, since calibration 
    gases do not need to be injected simultaneously. This also resolves the 
    issues raised during certification testing for Phase I units. In 
    addition, the revision provides consistency with existing EPA 
    regulations under 40 CFR part 60.
        The EPA has included recordkeeping provisions for this 
    certification test in Sec. 75.56. Furthermore, the rule amendments 
    contain an additional figure at the end of appendix A, to complement 
    the figures for test data and results for other certification tests for 
    CEMS.
    
    IV. Impact Analyses
    
        The impact analyses required by Executive Orders 12866 and 12875 
    and by the Regulatory Flexibility Act, the Unfunded Mandates Act and 
    the Paperwork Reduction Act are found under the notice of direct final 
    rulemaking in today's Federal Register.
        The control numbers assigned to collections of information in 
    certain EPA regulations by the OMB have been consolidated under 40 CFR 
    part 9. The EPA finds there is ``good cause'' under Sections 553(b)(B) 
    and 553(d)(3) of the APA to amend the applicable table in 40 CFR part 9 
    to display the OMB control number for this rule without prior notice 
    and comment. Due to the technical nature of the table, further notice 
    and comment would be unnecessary. For additional information, see 58 FR 
    18014, April 7, 1993, and 58 FR 27472, May 10, 1993.
    List of Subjects in 40 CFR Parts 75
    
        Environmental protection, Air pollution control, Carbon dioxide, 
    Continuous emission monitors, Electric utilities, Incorporation by 
    reference, Nitrogen oxides, Reporting and recordkeeping requirements, 
    Sulfur dioxide.
    
        [[Page 26566]] Dated: April 28, 1995.
    Carol M. Browner,
    Administrator.
    
        For the reasons set out in the preamble, part 75 of title 40, 
    chapter I, of the Code of Federal Regulations is amended as follows:
    
    PART 75--CONTINUOUS EMISSION MONITORING
    
        1.-3. The authority citation for part 75 is revised to read as 
    follows:
    
        Authority: 42 U.S.C. 7601 and 7651k.
    
        4. Section 75.11 is amended by adding a sentence to the end of 
    paragraph (a) and by adding paragraphs (e) and (g) to read as follows:
    
    
    Sec. 75.11  Specific provisions for monitoring SO2 emissions 
    (SO2 and flow monitors).
    
        (a) * * * The provisions in this paragraph are suspended from July 
    17, 1995 through December 31, 1996.
    * * * * *
        (e) Units with SO2 continuous emission monitoring systems 
    during the combustion of gaseous fuel. On or after January 1, 1997, the 
    owner or operator of a unit with an SO2 continuous emission 
    monitoring system shall, during any hours in which the unit combusts 
    only pipeline natural gas or gaseous fuel with a sulfur content no 
    greater than natural gas, calculate SO2 emissions in accordance 
    with the following procedures. Prior to January 1, 1997, the owner or 
    operator of such a unit may calculate SO2 emissions in accordance 
    with the following procedures.
        (1) The owner or operator of a unit with an SO2 continuous 
    emission monitoring system shall, during any hours in which the unit 
    combusts only pipeline natural gas, calculate SO2 emissions using 
    one of the following two methods in lieu of operating and recording 
    data from the SO2 continuous emission monitoring system:
        (i) By using the heat input calculated using a certified flow 
    monitoring system and a certified diluent monitor, the default SO2 
    emission rate for pipeline natural gas from appendix D of this part, 
    and Equation F-23 in appendix F of this part and by certifying this as 
    a system for monitoring SO2 mass emissions by identification in 
    the monitoring plan, by tests for the data acquisition and handling 
    system under Sec. 75.20(c), and by meeting all quality control and 
    quality assurance requirements in appendix B of this part for a flow 
    monitor and a diluent monitor; or
        (ii) By certifying an excepted monitoring system under appendix D 
    of this part under Sec. 75.20, by following the procedures for 
    determining SO2 emissions from combustion of gaseous fuels under 
    appendix D of this part, by meeting the recordkeeping requirements of 
    Sec. 75.55, and by meeting all quality control and quality assurance 
    requirements for fuel flowmeters in appendix D of this part.
        (2) During any hours in which the unit combusts only gaseous fuel 
    with a sulfur content no greater than natural gas other than pipeline 
    natural gas, the owner or operator shall calculate SO2 mass 
    emissions by certifying an excepted monitoring system under appendix D 
    of this part under Sec. 75.20, by using the gas sampling and analysis 
    and fuel flow procedures of appendix D of this part, by meeting the 
    recordkeeping requirements of Sec. 75.55, and by meeting all quality 
    control and quality assurance requirements for fuel flowmeters in 
    appendix D of this part.
    * * * * *
        (g) Coal-fired units. The owner or operator shall meet the general 
    operating requirements in Sec. 75.10 for an SO2 continuous 
    emission monitoring system and a flow monitoring system for each 
    affected coal-fired unit while the unit is combusting coal or any fuel 
    other than natural gas or a gaseous fuel with a sulfur content no 
    greater than natural gas, except as provided in Sec. 75.16 and in 
    subpart E of this part.
        5. Section 75.21 is amended by adding a sentence to the end of 
    paragraph (a) and by adding paragraph (f) to read as follows:
    
    
    Sec. 75.21  Quality assurance and quality control requirements.
    
        (a) * * * The provisions in this paragraph are suspended from July 
    17, 1995 through December 31, 1996.
    * * * * *
        (f) Continuous emission monitoring systems. The owner or operator 
    of an affected unit shall operate, calibrate, and maintain each primary 
    and redundant backup continuous emission monitoring system used under 
    the Acid Rain Program according to the quality assurance and quality 
    control procedures in appendix B of this part. The owner or operator of 
    an affected unit shall ensure that each non-redundant backup continuous 
    emission monitoring system used under the Acid Rain Program complies 
    with the daily and quarterly quality assurance and quality control 
    procedures in appendix B of this part for each day and quarter that the 
    system is used to report data. The owner or operator shall perform 
    quality assurance upon a reference method backup monitoring system 
    according to the requirements of Method 2, 6C, 7E, or 3A in appendix A 
    of part 60 of this chapter, instead of the procedures specified in 
    appendix B of this part. Notwithstanding the provisions of appendix B 
    of this part, the owner or operator of a unit with an SO2 
    continuous emission monitoring system is not required to perform daily 
    or quarterly assessments under appendix B of this part on any day or in 
    any calendar quarter during which the unit combusts only natural gas or 
    a gaseous fuel with a sulfur content no greater than natural gas. In 
    addition, any calendar quarter during which the unit combusts only 
    natural gas or a gaseous fuel with a sulfur content no greater than 
    natural gas shall be excluded in determining the calendar quarter, 
    bypass operating quarter, or unit operating quarter when the next 
    relative accuracy test audit must be performed for the SO2 
    continuous emission monitoring system, provided that a relative 
    accuracy test audit is performed on that system at least once every two 
    calendar years. The owner or operator of a unit using a certified flow 
    monitor and a certified diluent monitor and Equation F-23 to calculate 
    SO2 emissions shall meet all quality control and quality assurance 
    requirements in appendix B of this part for the flow monitor and the 
    diluent monitor.
        6. Section 75.30 is amended by adding paragraphs (d) and (e) to 
    read as follows:
    
    
    Sec. 75.30  General provisions.
    
    * * * * *
        (d) On or after January 1, 1997, the owner or operator shall comply 
    with the provisions of this paragraph. Prior to January 1, 1997, the 
    owner or operator may comply with the provisions of this paragraph (d) 
    if also complying with the provisions of Sec. 75.11(e).
        (1) Whenever a unit with an SO2 continuous emission monitoring 
    system combusts only pipeline natural gas and the owner or operator is 
    using the procedures in section 7 of appendix F of this part to 
    determine SO2 mass emissions pursuant to Sec. 75.11(e), the owner 
    or operator shall substitute for missing data from a flow monitoring 
    system, CO2 diluent monitor or O2 diluent monitor using the 
    missing data substitution procedures in Sec. 75.36.
        (2) Whenever a unit with an SO2 continuous emission monitoring 
    system combusts gas with a sulfur content no greater than natural gas 
    or pipeline natural gas and the owner or operator is using the gas 
    sampling and analysis and fuel flow procedures in appendix D of this 
    part, to determine SO2 mass emissions pursuant to Sec. 75.11(e), 
    the owner or operator shall substitute for [[Page 26567]] missing data 
    using the missing data procedures in appendix D of this part.
        (3) The owner or operator shall not use historical data from an 
    SO2 pollutant concentration monitor to account for SO2 
    emissions due to combustion of gas during missing data periods. In 
    addition, the owner or operator shall not include hours when the unit 
    combusts only natural gas (or a gaseous fuel with sulfur content no 
    greater than that of natural gas) in the availability calculations in 
    Sec. 75.32, nor in the calculations of substitute data using the 
    procedures of either Sec. 75.31 or Sec. 75.33. For the purpose of the 
    missing data and availability procedures for SO2 pollutant 
    concentration monitors in Secs. 75.31 through 75.33 only, all hours 
    during which the unit combusts only natural gas, or a gaseous fuel with 
    a sulfur content no greater than natural gas, shall be excluded from 
    the definition of ``monitor operating hour,'' ``quality-assured monitor 
    operating hour,'' ``unit operating hour,'' and ``unit operating day.''
        (e) On or after January 1, 1997, the owner or operator shall comply 
    with the provisions of this paragraph. Prior to January 1, 1997, the 
    owner or operator may comply with the provisions of this paragraph.
        (1) For monitoring of emissions at a unit with multiple stacks or a 
    bypass stack, include only those hours when emissions are passing 
    through the stack or duct in the definitions of ``unit operating hour'' 
    and ``quality-assured monitor operating hour'' for purposes of applying 
    the missing data and availability procedures in Secs. 75.31 through 
    75.36 to the monitoring system on that stack or duct.
        (2) If the proportion of flow going to each stack from a unit with 
    multiple stacks or the proportion of flow going to a bypass stack has 
    changed during the previous 2,160 hours when emissions passed through 
    that stack, then record the maximum flow rate recorded by the flow 
    monitoring system at the corresponding load range during the previous 
    2,160 hours of quality-assured monitor data when emissions passed 
    through that stack, instead of the value calculated using the missing 
    data substitution procedures in Sec. 75.31 or Sec. 75.33.
        7. Section 75.32 is amended by adding a sentence to the end of 
    paragraph (a)(3) and adding paragraph (a)(4) to read as follows:
    
    
    Sec. 75.32  Determination of monitoring data availability for standard 
    missing data procedure.
    
        (a) * * *
        (3) * * * The provisions in this paragraph (a)(3) are suspended 
    from July 17, 1995 through December 31, 1996.
        (4) The owner or operator shall include all unit operating hours, 
    and all monitor operating hours for which quality-assured data were 
    recorded by a certified primary monitor, a certified redundant or non-
    redundant backup monitor, a reference method for that unit, and from an 
    approved alternative monitoring system under subpart E of this part 
    when calculating percent monitor data availability using Equation 8 or 
    9. The owner or operator shall exclude hours when a unit combusted only 
    natural gas (or gaseous fuel with the same sulfur content as natural 
    gas) from calculations of percent monitor data availability for 
    SO2 pollutant concentration monitors, as provided in 
    Sec. 75.30(d). No hours from more than three years (26,280 clock hours) 
    earlier shall be used in Equation 8 or 9. When three years from 
    certification have elapsed, replace the words ``since certification'' 
    or ``during previous 8,760 unit operating hours'' with ``in the 
    previous three years'' and replace ``8,760'' with ``total unit 
    operating hours in the previous three years.''
    * * * * *
        8. Section 75.34 is revised to read as follows:
    
    
    Sec. 75.34  Units with add-on emission controls.
    
        (a) The owner or operator of an affected unit equipped with add-on 
    SO2 and/or NOX emission controls shall use at least one of 
    the following options:
        (1) The owner or operator may use the missing data substitution 
    procedures as specified for all affected units in Secs. 75.31 through 
    75.33 for substituting data for each hour where the add-on emission 
    controls are operating within the proper operation range specified in 
    the monitoring plan for the unit. The designated representative shall 
    report the range of add-on emission control operating parameters that 
    indicate proper operation in the unit's monitoring plan and the owner 
    or operator shall record data to verify the proper operation of the 
    SO2 or NOX add-on emission controls during each hour, as 
    described in paragraph (d) of this section. In addition, under 
    Sec. 75.64(c) the designated representative shall submit a certified 
    verification of the proper operation of the SO2 or NOX add-on 
    emission control for each missing data period at the end of each 
    quarter.
        (2) In addition, the designated representative may petition the 
    Administrator under Sec. 75.66 to replace the maximum recorded value in 
    the last 720 quality-assured monitor operating hours with a value 
    corresponding to the maximum controlled emission rate (an emission rate 
    recorded when the add-on emission controls were operating) recorded 
    during the last 720 quality-assured monitor operating hours. For such a 
    petition, the designated representative must demonstrate that the 
    following conditions are met: the monitor data availability, calculated 
    in accordance with Sec. 75.32, for the affected unit is below 90.0 
    percent and parametric data establish that the add-on emission controls 
    were operating properly (i.e., within the range of operating parameters 
    provided in the monitoring plan) during the time period under petition.
        (3) The designated representative may petition the Administrator 
    under Sec. 75.66 for approval of site-specific parametric monitoring 
    procedure(s) for calculating substitute data for missing SO2 
    pollutant concentration and NOX emission rate data in accordance 
    with the requirements of paragraphs (b) and (c) of this section, and 
    appendix C of this part. The owner or operator shall record the data 
    required in appendix C of this part, pursuant to Sec. 75.51(b) until 
    January 1, 1996, or pursuant to Sec. 75.55(b).
        (b) For an affected unit equipped with add-on SO2 emission 
    controls, the designated representative may petition the Administrator 
    to approve a parametric monitoring procedure, as described in appendix 
    C of this part, for calculating substitute SO2 concentration data 
    for missing data periods. The owner or operator shall use the 
    procedures in Sec. 75.31, Sec. 75.33, or Sec. 75.34(a) for providing 
    substitute data for missing SO2 concentration data unless a 
    parametric monitoring procedure has been approved by the Administrator.
        (1) Where the monitoring data availability is 90.0 percent or more 
    for an outlet SO2 pollutant concentration monitor, the owner or 
    operator may calculate substitute data using an approved parametric 
    monitoring procedure.
        (2) Where the monitor data availability for an outlet SO2 
    pollutant concentration monitor is less than 90.0 percent, the owner or 
    operator shall calculate substitute data using the procedures in 
    Sec. 75.34(a) (1) or (2), even if the Administrator has approved a 
    parametric monitoring procedure.
        (c) For an affected unit with NOX add-on emission controls, 
    the designated representative may petition the Administrator to approve 
    a parametric monitoring procedure, as described in appendix C of this 
    part, in order to calculate substitute NOX emission rate 
    [[Page 26568]] data for missing data periods. The owner or operator 
    shall use the procedures in Sec. 75.31 or Sec. 75.33 for providing 
    substitute data for missing NOX emission rate data prior to 
    receiving the Administrator's approval for a parametric monitoring 
    procedure.
        (1) Where monitor data availability for a NOX continuous 
    emission monitoring system is 90.0 percent or more, the owner or 
    operator may calculate substitute data using an approved parametric 
    monitoring procedure.
        (2) Where monitor data availability for a NOX continuous 
    emission monitoring system is less than 90.0 percent, the owner or 
    operator shall calculate substitute data using the procedure in 
    Sec. 75.34(a) (1) or (2), even if the Administrator has approved a 
    parametric monitoring procedure.
        (d) The owner or operator shall keep records of information as 
    described in subpart F of this part to verify the proper operation of 
    the SO2 or NOX emission controls during all periods of 
    missing data. The owner or operator shall provide these records to the 
    Administrator or to the EPA Regional Office upon request. Whenever such 
    records are not provided or such records do not demonstrate that proper 
    operation of the SO2 or NOX add-on emission controls has been 
    maintained in accordance with the range of add-on emission control 
    operating parameters reported in the monitoring plan for the unit, the 
    owner or operator shall substitute the maximum potential NOX 
    emission rate, as defined in Sec. 72.2 of this chapter, to report the 
    NOX emission rate, and either the maximum hourly SO2 
    concentration recorded by the inlet monitor during the previous 720 
    quality assured monitor operating hours, if available, or the maximum 
    potential concentration for SO2, as defined by section 2.1.1.1 of 
    appendix A of this part, to report SO2 concentration for each hour 
    of missing data until information demonstrating proper operation of the 
    SO2 or NOX emission controls is available.
        9. Section 75.53 is amended by revising paragraph (d) introductory 
    text and by adding paragraph (d)(4) to read as follows:
    Sec. 75.53  Monitoring plan.
    
    * * * * *
        (d) Contents of monitoring plan for specific situations. The 
    following additional information shall be included in the monitoring 
    plan for gas-fired or oil-fired units or for units with add-on emission 
    controls:
    * * * * *
        (4) For each unit with add-on emission controls:
        (i) A list of operating parameters for the add-on emission 
    controls, including parameters from the list in Sec. 75.55 appropriate 
    to the particular installation; and
        (ii) The range of each operating parameter in the list that 
    indicates the add-on emission controls are properly operating.
    * * * * *
        10. Section 75.55 is amended by adding paragraphs (b) and (e) to 
    read as follows:
    
    
    Sec. 75.55  General recordkeeping provisions for specific situations.
    
        (a) * * *
        (b) Specific parametric data record provisions for calculating 
    substitute emissions data for units with add-on emission controls. In 
    accordance with Sec. 75.34, the owner or operator of an affected unit 
    with add-on emission controls shall either record the applicable 
    information in paragraph (b)(3) of this section for each hour of 
    missing SO2 concentration data or NOX emission rate (in 
    addition to other information), or shall record the information in 
    paragraph (b)(1) of this section for SO2 or paragraph (b)(2) of 
    this section for NOX through an automated data acquisition and 
    handling system, as appropriate to the type of add-on emission 
    controls:
        (1) For units with add-on SO2 emission controls petitioning to 
    use or using the optional parametric monitoring procedures in appendix 
    C of this part, for each hour of missing SO2 concentration or 
    volumetric flow data:
        (i) The information required in Sec. 75.54(b) for SO2 
    concentration and volumetric flow if either one of these monitors is 
    still operating;
        (ii) Date and hour;
        (iii) Number of operating scrubber modules;
        (iv) Total feedrate of slurry to each operating scrubber module 
    (gal/min);
        (v) Pressure differential across each operating scrubber module 
    (inches of water column);
        (vi) For a unit with a wet flue gas desulfurization system, an 
    inline measure of absorber pH for each operating scrubber module;
        (vii) For a unit with a dry flue gas desulfurization system, the 
    inlet and outlet temperatures across each operating scrubber module;
        (viii) For a unit with a wet flue gas desulfurization system, the 
    percent solids in slurry for each scrubber module.
        (ix) For a unit with a dry flue gas desulfurization system, the 
    slurry feed rate (gal/min) to the atomizer nozzle;
        (x) For a unit with SO2 add-on emission controls other than 
    wet or dry limestone, corresponding parameters approved by the 
    Administrator;
        (xi) Method of determination of SO2 concentration and 
    volumetric flow, using Codes 1-15 in Table 3 of Sec. 75.54; and
        (xii) Inlet and outlet SO2 concentration values recorded by an 
    SO2 continuous emission monitoring system and the removal 
    efficiency of the add-on emission controls.
        (2) For units with add-on NOX emission controls petitioning to 
    use or using the optional parametric monitoring procedures in appendix 
    C of this part, for each hour of missing NOX emission rate data:
        (i) Date and hour;
        (ii) Inlet air flow rate (acfh, rounded to the nearest thousand);
        (iii) Excess O2 concentration of flue gas at stack outlet 
    (percent, rounded to nearest tenth of a percent);
        (iv) Carbon monoxide concentration of flue gas at stack outlet 
    (ppm, rounded to the nearest tenth);
        (v) Temperature of flue gas at furnace exit or economizer outlet 
    duct ( deg.F); and
        (vi) Other parameters specific to NOX emission controls (e.g., 
    average hourly reagent feedrate);
        (vii) Method of determination of NOX emission rate using Codes 
    1-15 in Table 3 of Sec. 75.54; and
        (viii) Inlet and outlet NOX emission rate values recorded by a 
    NOX continuous emission monitoring system and the removal 
    efficiency of the add-on emission controls.
        (3) For units with add-on SO2 or NOX emission controls 
    following the provisions of Sec. 75.34(a) (1) or (2), for each hour of 
    missing data record:
        (i) Parametric data which demonstrate the proper operation of the 
    add-on emission controls, as described in the monitoring plan for the 
    unit (to be maintained on site, and to be submitted upon request from 
    the Administrator or by an EPA Regional office);
        (ii) A flag indicating that the add-on emission controls are 
    operating with all parameters within the ranges specified in the 
    monitoring plan or that the add-on emission controls are not operating 
    properly;
        (iii) For units petitioning under Sec. 75.66 for substituting a 
    representative SO2 concentration during missing data periods, any 
    available inlet and outlet SO2 concentration values recorded by an 
    SO2 continuous emission monitoring system; and
        (iv) For units petitioning under Sec. 75.66 for substituting a 
    representative NOX emission rate during missing data periods, any 
    available inlet and outlet NOX emission rate values recorded by a 
    [[Page 26569]] NOX continuous emission monitoring system.
    * * * * *
        (e) Specific SO2 emission record provisions during the 
    combustion of gaseous fuel. In accordance with the provisions in 
    Sec. 75.11(e), the owner or operator of a unit with an SO2 
    continuous emission monitoring system may record the information in 
    paragraph (c)(3) of this section in lieu of the information in 
    Secs. 75.54(c)(1) and 75.54(c)(3), for those hours when only pipeline 
    natural gas or a gaseous fuel with a sulfur content no greater than 
    natural gas is combusted.
    * * * * *
        11. Section 75.56 is amended by adding paragraph (a)(6) to read as 
    follows:
    
    
    Sec. 75.56  Certification, quality assurance and quality control record 
    provisions.
    
        (a) * * *
        (6) For each SO2, NOX, CO2, or O2 pollutant 
    concentration monitor, NOx-diluent continuous emission monitoring 
    system, or SO2-diluent continuous emission monitoring system, the 
    owner or operator shall record the following information for the cycle 
    time test:
        (i) Component/system identification code;
        (ii) Date;
        (iii) Start and end times;
        (iv) Upscale and downscale cycle times for each component;
        (v) Stable start monitor value;
        (vi) Stable end monitor value;
        (vii) Reference value of calibration gas(es);
        (viii) Calibration gas level; and
        (ix) Cycle time result for the entire system.
    * * * * *
        12. Section 75.64 is amended by revising paragraphs (a)(1) and (c) 
    to read as follows:
    
    
    Sec. 75.64   Quarterly reports.
    
        (a) * * *
        (1) The information and hourly data required in Secs. 75.50 through 
    75.52 (or Secs. 75.54 through 75.56), no later than the quarterly 
    report due April 30, 1996), excluding:
        (i) Descriptions of adjustments, corrective action, and 
    maintenance;
        (ii) Information which is incompatible with electronic reporting 
    (e.g., field data sheets, lab analyses, quality control plan);
        (iii) Opacity data listed in Sec. 75.50(f) or Sec. 75.54(f);
        (iv) For units with SO2 or NOX add-on emission controls 
    that do not elect to use the approved site-specific parametric 
    monitoring procedures for calculation of substitute data, the 
    information in Sec. 75.55(b)(3); and
        (v) The information recorded under Sec. 75.56(a)(7) for the period 
    prior to January 1, 1996.
    * * * * *
        (c) Compliance certification. The designated representative shall 
    submit a certification in support of each quarterly emissions 
    monitoring report based on reasonable inquiry of those persons with 
    primary responsibility for ensuring that all of the unit's emissions 
    are correctly and fully monitored. The certification shall indicate 
    whether the monitoring data submitted were recorded in accordance with 
    the applicable requirements of this part including the quality control 
    and quality assurance procedures and specifications of this part and 
    its appendices, and any such requirements, procedures and 
    specifications of an applicable excepted or approved alternative 
    monitoring method. In the event of any missing data periods, the 
    certification must describe the measures taken to cure the causes for 
    the missing data periods. For a unit with add-on emission controls, the 
    designated representative shall also include a certification for all 
    hours where data are substituted following the provisions of 
    Sec. 75.34(a)(1), that the add-on emission controls were operating 
    within the range of parameters listed in the monitoring plan, and that 
    the substitute values recorded during the quarter do not systematically 
    underestimate SO2 or NOX emissions, pursuant to Sec. 75.34.
    * * * * *
        13. Section 75.66 is amended by revising paragraphs (e) and (f) to 
    read as follows:
    
    
    Sec. 75.66   Petitions to the Administrator.
    
    * * * * *
        (e) Parametric monitoring procedure petitions. The designated 
    representative for an affected unit may submit a petition to the 
    Administrator, where each petition shall contain the information 
    specified in Sec. 75.51(b) (or Sec. 75.55(b), no later than January 1, 
    1996) for use of a parametric monitoring method. The Administrator will 
    either:
        (1) Publish a notice in the Federal Register indicating receipt of 
    a parametric monitoring procedure petition;, or
        (2) Notify interested parties of receipt of a parametric monitoring 
    petition.
        (f) Missing data petitions for units with add-on emission controls. 
    The designated representative for an affected unit may submit a 
    petition to the Administrator for the use of the maximum controlled 
    emission rate, which the Administrator will approve if the petition 
    adequately demonstrates that all the requirements in Sec. 75.34(a)(2) 
    are satisfied. Each petition shall contain the information listed below 
    for the time period (or data gap) during which the affected unit 
    experienced the monitor outage that would otherwise result in the 
    substitution of an uncontrolled maximum value under the standard 
    missing data procedures contained in subpart D of this part:
        (1) Data demonstrating that the affected unit's monitor data 
    availability for the time period under petition was less than 90.0 
    percent;
        (2) Data demonstrating that the add-on emission controls were 
    operating properly during the time period under petition (i.e., within 
    the range of operating parameters for the add-on emission controls in 
    the monitoring plan for the unit);
        (3) A list of the average hourly values for the previous 720 
    quality-assured monitor operating hours, highlighting both the maximum 
    recorded value and the value corresponding to the maximum controlled 
    emission rate; and
        (4) An explanation and information on operation of the add-on 
    emission controls demonstrating that the selected historical SO2 
    concentration or NOX emission rate does not underestimate the 
    SO2 concentration or NOX emission rate during the missing 
    data period.
    * * * * *
        14. Appendix A to Part 75, Section 6.3 is amended by adding a 
    sentence to the last paragraph of sections 6.3.1 and 6.3.2 and by 
    adding section 6.3.3 to read as follows:
    
    Appendix A--Specifications and Test Procedures
    
    * * * * *
    
    6. Certification Tests and Procedures
    * * * * *
        6.3.1  * * * The provisions in this section are suspended from 
    July 17, 1995 through December 31, 1996.
        6.3.2  * * * The provisions in this section are suspended from 
    July 17, 1995 through December 31, 1996.
    
    6.3.3  Pollutant Concentration Monitor and CO2 or O2 Monitor 
    7-day Calibration Error Test
    
        Measure the calibration error of each pollutant concentration 
    monitor and CO2 or O2 monitor while the unit is operating 
    once each day for 7 consecutive operating days according to the 
    following procedures. (In the event that extended unit outages occur 
    after the commencement of the test, the 7 consecutive unit operating 
    days need not be 7 consecutive calendar days.) Units using dual span 
    monitors must perform the calibration error test on both high- and 
    low-scales of the pollutant concentration monitor.
        Do not make manual adjustments to the monitor settings until 
    after taking measurements at both zero and high 
    [[Page 26570]] concentration levels for that day during the 7-day 
    test. If automatic adjustments are made, conduct the calibration 
    error test in a way that the magnitude of the adjustments can be 
    determined and recorded. Record and report test results for each day 
    using the unadjusted concentration or flow rate measured in the 
    calibration error test prior to making any manual adjustment or 
    resetting the calibration.
        The calibration error tests should be approximately 24 hours 
    apart (unless the 7-day test is performed over non-consecutive 
    days). Perform calibration error tests at two concentrations: (1) 
    Zero-level and (2) high-level, as specified in section 5.2 of this 
    appendix. In addition, repeat the procedure for SO2 and 
    NOX pollutant concentration monitors using the low-scale for 
    units equipped with emission controls or other units with dual span 
    monitors. Use only NIST traceable reference material, standard 
    reference material, NIST/EPA-approved certified reference material, 
    research gas material, Protocol 1 calibration gases certified by the 
    vendor to be within 2 percent of the label value or zero air 
    material for the zero level only.
        Introduce the calibration gas at the gas injection port, as 
    specified in section 2.2.1 of this appendix. Operate each monitor in 
    its normal sampling mode. For extractive and dilution type monitors, 
    pass the audit gas through all filters, scrubbers, conditioners, and 
    other monitor components used during normal sampling and through as 
    much of the sampling probe as is practical. For in situ type 
    monitors, perform calibration checking all active electronic and 
    optical components, including the transmitter, receiver, and 
    analyzer. Challenge the pollutant concentration monitors and 
    CO2 or O2 monitors once with each gas. Record the monitor 
    response from the data acquisition and handling system. Using 
    Equation A-5 of this appendix, determine the calibration error at 
    each concentration once each day (at 24-hour intervals) for 7 
    consecutive days according to the procedures given in this section.
        Calibration error tests are acceptable for monitor or monitoring 
    system certification if none of these daily calibration error test 
    results exceed the applicable performance specifications in section 
    3.1 of this appendix.
    * * * * *
        15. Appendix A to part 75, section 6.3.4 is added to read as 
    follows:
    
    Appendix A--Specifications and Test Procedures
    
    6. Certification Tests and Procedures
    
    * * * * *
    
    6.3.4  Flow Monitor 7-day Calibration Error Test
    
        Measure the calibration error of each flow monitor according to 
    the following procedures.
        Introduce the reference signal corresponding to the values 
    specified in section 2.2.2.1 of this appendix to the probe tip (or 
    equivalent), or to the transducer. During the 7-day certification 
    test period, conduct the calibration error test while the unit is 
    operating once each unit operating day (as close to 24-hour 
    intervals as practicable). In the event that extended unit outages 
    occur after the commencement of the test, the 7 consecutive 
    operating days need not be 7 consecutive calendar days. Record the 
    flow monitor responses by means of the data acquisition and handling 
    system. Calculate the calibration error using Equation A-6 of this 
    appendix.
        Do not perform any corrective maintenance, repair, or 
    replacement upon the flow monitor during the 7-day certification 
    test period other than that required in the quality assurance/
    quality control (QA/QC) plan required by appendix B of this part. Do 
    not make adjustments between the zero and high reference level 
    measurements on any day during the 7-day test. If the flow monitor 
    operates within the calibration error performance specification 
    (i.e., less than or equal to 3 percent error each day and requiring 
    no corrective maintenance, repair, or replacement during the 7-day 
    test period) the flow monitor passes the calibration error test 
    portion of the certification test. Record all maintenance activities 
    and the magnitude of any adjustments. Record output readings from 
    the data acquisition and handling system before and after all 
    adjustments. Record and report all calibration error test results 
    using the unadjusted flow rate measured in the calibration error 
    test prior to resetting the calibration. Record all adjustments made 
    during the seven day period at the time the adjustment is made and 
    report them in the certification application.
    * * * * *
        16. Appendix A to part 75, is amended by adding a sentence to the 
    end of section 6.4 and by adding section 6.4.1 to read as follows:
    
    6. Certification Tests and Procedures
    
    * * * * *
        6.4  * * * The provisions in this section 6.4 are suspended from 
    July 17, 1995 through December 31, 1996.
    
    6.4.1  Cycle Time Test
    
        Perform cycle time tests for each pollutant concentration 
    monitor, and continuous emission monitoring system while the unit is 
    operating according to the following procedures.
        Use a zero-level and a high-level calibration gas (as defined in 
    section 5.2 of this appendix) alternately. To determine the upscale 
    elapsed time, inject a zero-level concentration calibration gas into 
    the probe tip (or injection port leading to the calibration cell, 
    for in situ systems with no probe). Record the stable starting 
    monitor value and start time. Next, allow the monitor to measure the 
    concentration of flue gas emissions until the response stabilizes. 
    Determine the upscale elapsed time as the time at which 95.0 percent 
    of the step change is achieved between the stable starting gas value 
    and the stable ending monitor value. Record the stable ending 
    monitor value, the end time, and the upscale elapsed time for the 
    monitor using data acquisition and handling system output. Then 
    repeat the procedure, starting by injecting the high-level gas 
    concentration to determine the downscale elapsed time, which is the 
    time at which 95.0 percent of the step change is achieved between 
    the stable starting gas value and the stable ending monitor value. 
    End the downscale test by measuring the concentration of flue gas 
    emissions. Record the stable starting and ending monitor values, the 
    start and end times, and the downscale elapsed time for the monitor 
    using data acquisition and handling system output. A stable value is 
    equivalent to a reading with a change of less than 1 percent of the 
    span value for 30 seconds, or a reading with a change of less than 5 
    percent from the measured average concentration over 5 minutes.
        For monitors or monitoring systems that perform a series of 
    operations (such as purge, sample, and analyze), time the injections 
    of the calibration gases so they will produce the longest possible 
    cycle time. Record the span, the zero and high gas concentrations, 
    the start and end times, the stable starting and ending monitor 
    values, and the upscale and downscale elapsed times. Report the 
    slower of the two elapsed times as the cycle time for the analyzer. 
    (See Figure 5 at the end of this appendix.) For the NOX 
    continuous emission monitoring system test and SO2-diluent 
    continuous emission monitoring system test, record and report the 
    longer cycle time of the two component analyzers as the system cycle 
    time.
        For time-shared systems, this procedure must be done for all 
    probe locations that will be polled within the same 15-minute period 
    during monitoring system operations. For cycle time results for a 
    time-shared system, add together the longest cycle time obtained 
    from each location. Report the sum of the cycle time at each 
    location plus the time required for all purge cycles (as determined 
    by the CEMS manufacturer) for each location as the cycle time for 
    each and all of those systems. For monitors with dual ranges, 
    perform the test on the range giving the longest cycle time.
        Cycle time test results are acceptable for monitor or monitoring 
    system certification if none of the cycle times exceed 15 minutes.
    * * * * *
        17. Appendix A to part 75 is amended by adding Figure 5 at the end 
    of the appendix to read as follows:
    * * * * *
    
    Figure 5--Cycle Time
    Date of test-----------------------------------------------------------
    Component/system ID#:--------------------------------------------------
    Analyzer type----------------------------------------------------------
    Serial Number----------------------------------------------------------
    High level gas concentration: ______ ppm/% (circle one)
    Zero level gas concentration: ______ ppm/% (circle one)
    Analyzer span setting: ______ ppm/% (circle one)
    Upscale:
        Stable starting monitor value: ______ ppm/% (circle one)
        Stable ending monitor reading: ______ ppm/% (circle one)
        Elapsed time: ______ seconds
    Downscale:
        Stable starting monitor value: ______ ppm/% (circle one) 
    [[Page 26571]] 
        Stable ending monitor value: ______ ppm/% (circle one)
        Elapsed time: ______ seconds
    Component cycle time= ______ seconds
    System cycle time= ______ seconds
    * * * * *
        18. Appendix B to part 75 is amended by adding a sentence to the 
    end of section 2.1 and by adding section 2.1.7 to read as follows:
    
    Appendix B--Quality Assurance and Quality Control Procedures
    
    * * * * *
    
    2. Frequency of Testing
    
        2.1 * * * The provisions in this section 2.1 are suspended from 
    July 17, 1995 through December 31, 1996.
    * * * * *
    
    2.1.7  Daily Assessments
    
        For each monitor or continuous emission monitoring system, 
    perform the following assessments during each day in which the unit 
    combusts any fuel (hereafter referred to as a ``unit operating 
    day''), or for a monitor on a bypass stack/duct, during each day 
    that emissions pass through the by-pass stack or duct. If the unit 
    discontinues operation or if use of the by-pass stack or duct is 
    discontinued prior to performance of the calibration error test, 
    data from the monitor or continuous emission monitoring system may 
    be considered quality assured prospectively for 24 consecutive clock 
    hours from the time of successful completion of the previous daily 
    test performed while the unit is operating. These requirements are 
    effective as of the date when the monitor or continuous emission 
    monitoring system completes certification testing.
    * * * * *
    
    Appendix F to Part 75--Conversion Procedures
    
        19. Appendix F is amended by adding section 7 to read as follows:
    * * * * *
    
    7. Procedures for SO2 Mass Emissions at Units With SO2 
    Continuous Emission Monitoring Systems During the Combustion of Gaseous 
    Fuel
    
        Use the following equation to calculate hourly SO2 mass 
    emissions as allowed for units with SO2 continuous emission 
    monitoring systems during the combustion of pipeline natural gas 
    under Sec. 75.11(e). These procedures are optional prior to January 
    1, 1997 and are required on or after January 1, 1997.
    
    Eh=(0.0006) HI    (Eq. F-23)
    
    where,
    
    Eh=Hourly SO2 mass emissions, lb/hr.
    0.0006=Default SO2 emission rate for pipeline natural gas, lb/
    mmBtu.
    HI=Hourly heat input, as determined using the procedures of section 
    5.2 of this appendix.
    
    [FR Doc. 95-11497 Filed 5-10-95; 3:42 pm]
    BILLING CODE 6560-50-P
    
    

Document Information

Published:
05/17/1995
Department:
Environmental Protection Agency
Entry Type:
Rule
Action:
Interim final rule and request for comments.
Document Number:
95-11497
Dates:
Effective Dates. This interim final rule shall become effective on July 17, 1995. The provisions of Secs. 75.11(a), 75.21(a), and 75.32(a)(3); sections 6.3.1, 6.3.2 and 6.4 of appendix A of part 75; and section 2.1 of appendix B of part 75 are suspended temporarily from July 17, 1995 through December 31, 1996. Sections 75.11 (e) and (g), 75.21(f), 75.30 (d) and (e), 75.32(a)(4), 75.55(e), and 75.56(a)(6); Figure 5 and sections 6.3.3, 6.3.4 and 6.4.1 of appendix A of part 75; section 2.1.7 of ...
Pages:
26560-26571 (12 pages)
Docket Numbers:
FRL-5203-2
PDF File:
95-11497.pdf
Supporting Documents:
» Acid Rain Program: Continuous Emissions Monitoring
» List of Questions froni January 6 Washington Implementation Conference and List of questions from ARD Implementation Conference in Chicago, IL, January 1993 [A-94-16 II-D-6]
» Interim Final Rule: CEM Rule Technical Revisions (Attachment B) [A-94-16 II-F-5]
» American Gas Association (AGA) Report No. 3 (ANSI/API 2530-92), Orifice Metering of Natural Gas and Other Related Hydrocarbon Fluids [A-94-16 II-A-11]
» Direct Final Rule: CEM Rule Technical Revisions (Attachment A) [A-94-16 II-F-4]
» Letter from Cheryl Newton, EPA, to William H. Sheppard, Electric Energy, Inc. 9/13/93 [A-94-16 II-D-24]
» Letter from C. Greenwood, ESC, to L. Kertcher, EPA/ARD 3/10/93 [A-94-16 II-D-10]
» Discussion Issues for TU Electric and EPA 12/4/92 [A-94-16 II-D-3]
» Letter from David Rengert, Niagara Mohawk Power Corporation to Ann Zownir, USEPA, May 21, 1993 [A-94-16 II-D-16]
» Questions from Illinois Power [A-94-16 II-D-73]
CFR: (15)
40 CFR 75.34(a)
40 CFR 75.34(a)(1)
40 CFR 75.64(c)
40 CFR 75.30(d)
40 CFR 75.11(e)
More ...