95-1628. Drawbridge Operation Regulations; Superior Oil Canal, LA  

  • [Federal Register Volume 60, Number 15 (Tuesday, January 24, 1995)]
    [Rules and Regulations]
    [Pages 4560-4561]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-1628]
    
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    DEPARTMENT OF TRANSPORTATION
    
    Coast Guard
    
    33 CFR Part 117
    
    [CGD08-94-029]
    RIN 2115-AE47
    
    
    Drawbridge Operation Regulations; Superior Oil Canal, LA
    
    AGENCY: Coast Guard, DOT.
    
    ACTION: Final rule.
    
    -----------------------------------------------------------------------
    
    SUMMARY: At the request of the Louisiana Department of Transportation 
    and Development (LDOTD), the Coast Guard is changing the regulation 
    governing the operation of the swing span bridge on State Route 82, 
    across Superior Oil Canal, mile 6.3, between Grand Chenier and Pecan 
    Island, Cameron Parish, Louisiana, by permitting the draw to remain 
    closed to navigation unless 8 hours, notice is given for an opening of 
    the draw. Presently, the draw is required to open on signal from 6 a.m. 
    to 6 p.m. and from 6 p.m. to 6 a.m. the bridge opens on 4 hours, 
    notice. This action will provide relief to the bridge owner, thereby 
    creating a savings to the taxpayer, and still provide for the 
    reasonable needs of navigation.
    
    EFFECTIVE DATE: This regulation becomes effective on February 23, 1995.
    
    ADDRESSES: Unless otherwise indicated, documents referred to in this 
    preamble are available for inspection or copying at the office of the 
    Commander (ob), Eighth Coast Guard District, 501 Magazine Street, Room 
    1313, New Orleans, Louisiana 70130-3396, between 8 a.m. and 3 p.m., 
    Monday through Friday, except Federal holidays. The telephone number is 
    (504) 589-6951.
    
    FOR FURTHER INFORMATION CONTACT:
    John Wachter, Bridge Administration Manager, (504) 589-2965.
    
    SUPPLEMENTARY INFORMATION: 
    
    Drafting Information
    
        The drafters of this regulation are Mr. John Wachter, project 
    officer, and LT Elisa Holland, project attorney.
    
    Regulatory History
    
        On October 4, 1994, the Coast Guard published a notice of proposed 
    rulemaking entitled Drawbridge Operation Regulation; Superior Oil 
    Canal, LA, in the Federal Register (59 FR 50530). The Coast Guard 
    received three letters commenting on the proposal. No public hearing 
    was requested, and none was held.
    
    Background and Purpose
    
        LDOTD requested the 8 hours, notice for an opening of the draw 
    versus on-signal opening between 6 a.m. and 6 p.m. and 4 hours, notice 
    from 6 p.m. to 6 a.m. because of a decline in vessel traffic that 
    passes the Superior Oil Canal bridge. This rule will eliminate the 
    requirement of having a person on duty from 6 a.m. to 6 p.m. at the 
    bridge site, creating a savings to the taxpayer while still serving the 
    reasonable needs of navigational interests.
    
    Discussion of Comments and Changes
    
        Three letters of comment were received in response to Public Notice 
    CGD08-94-029 issued on October 14, 1994. The Federal Emergency 
    Management Agency, the National Marine Fisheries Service and the 
    Louisiana Department of Wildlife & Fisheries offered no objection to 
    the rule change. Therefore, the Final Rule remains unchanged from the 
    Proposed Rule.
    
    Assessment
    
        This regulation is not a significant regulatory action under 
    Section 3(f) of Executive Order 12866 and does not require an 
    assessment of potential cost and benefits under Section 6a(3) of that 
    order. It has not been reviewed by the Office of Management and Budget 
    under that order. It is not significant under the regulatory policies 
    and procedures of the Department of Transportation (DOT) (44 FR 11040; 
    February 26, 1979).
    
    Small Entities
    
        The economic impact has been found to be so minimal that a full 
    regulatory evaluation is unnecessary. The basis for this conclusion is 
    the number of vessels which pass the bridge, (1.9 per 24 hour period). 
    The three comments received offered no objection to the proposed rule. 
    Therefore, the Coast Guard certifies under section 605(b) of the 
    Regulatory Flexibility Act (5 U.S.C. 601 et seq.) that this rule will 
    not have a significant economic impact on a substantial number of small 
    entities.
    
    Collection of Information
    
        This rule contains no collection-of-information requirements under 
    the Paperwork Reduction Act (44 U.S.C. 3501 et seq.).
    
    Federalism
    
        This action has been analyzed in accordance with the principles and 
    criteria contained in Executive Order 12612, and it has been determined 
    that the final rulemaking does not have sufficient federalism 
    implications to warrant the preparation of a Federalism Assessment.
    
    Environment
    
        This rulemaking has been thoroughly reviewed by the Coast Guard and 
    it has been determined to be categorically excluded from further 
    environmental documentation in accordance with section 2.B.2.g.5 of 
    Commandant Instruction M16475.1B. A Categorical Exclusion Determination 
    statement has been prepared and placed in the rulemaking docket.
    
    List of Subjects in 33 CFR Part 117
    
        Bridges.
    
    Regulations
    
        In consideration of the foregoing, Part 117 of Title 33, Code of 
    Federal Regulations, is amended as follows: [[Page 4561]] 
    
    PART 117--DRAWBRIDGE OPERATION REGULATIONS
    
        1. The authority citation for Part 117 continues to read as 
    follows:
    
        Authority: 33 U.S.C. 499; 49 CFR 1.46; 33 CFR 1.05-1(g).
    
        2. Section 117.495 is revised to read as follows:
    
    
    Sec. 117.495  Superior Oil Canal.
    
        The draw of the S82 bridge, mile 6.3, in Cameron Parish shall open 
    on signal if at least 8 hours notice is given. Public vessels of the 
    United States and vessels in distress shall be passed as soon as 
    possible.
    
        Dated: January 4, 1995.
    R.C. North,
    Rear Admiral, U.S. Coast Guard Commander, Eighth Coast Guard District.
    [FR Doc. 95-1628 Filed 1-23-95; 8:45 am]
    BILLING CODE 4910-14-M
    
    

Document Information

Effective Date:
2/23/1995
Published:
01/24/1995
Department:
Coast Guard
Entry Type:
Rule
Action:
Final rule.
Document Number:
95-1628
Dates:
This regulation becomes effective on February 23, 1995.
Pages:
4560-4561 (2 pages)
Docket Numbers:
CGD08-94-029
RINs:
2115-AE47: Drawbridge Regulations
RIN Links:
https://www.federalregister.gov/regulations/2115-AE47/drawbridge-regulations
PDF File:
95-1628.pdf
CFR: (1)
33 CFR 117.495