96-32289. NorAm Gas Transmission Company; Notice of Request Under Blanket Authorization
[Federal Register Volume 61, Number 246 (Friday, December 20, 1996)]
[Notices]
[Page 67327]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-32289]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. CP97-150-000]
NorAm Gas Transmission Company; Notice of Request Under Blanket
Authorization
December 16, 1996.
Take notice that on December 12, 1996, Norm Gas Transmission
Company (NGT), 1600 Smith Street, Houston, Texas 77002, filed a request
with the Commission in Docket No. CP97-150-000, pursuant to Sections
157.205, and 157.211 of the Commission's Regulations under the Natural
Gas Act (NGA) for authorization to construct and operate a meter
station authorized in blanket certificate issued in Docket No. CP82-
384-000, all as more fully set forth in the request on file with the
Commission and open to public inspection.
NGT proposes to construct and operate a 2-inch U-Shape meter
station on NGT's Line 23-2 for delivery of natural gas to Peoples
Natural Gas (Peoples). The meter station will be located in Section 17,
Township 34 South, Range 3 East, Cowley County, Kansas and will be
constructed and installed by NGT at an estimated cost of $9,000. All
construction will be above-ground with no ground disturbance. The
estimated volumes to be delivered through this tap are approximately
25,000 MMBtu annually and 160 MMBtu on a peak day. Peoples has agreed
to reimburse NGT for the construction costs.
Any person or the Commission's staff may, within 45 days after the
Commission has issued this notice, file pursuant to Rule 214 of the
Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or
notice of intervention and pursuant to Section 157.205 of the
Regulations under the NGA (18 CFR 157.205) a protest to the request. If
no protest is filed within the allowed time, the proposed activity
shall be deemed to be authorized effective the day after the time
allowed for filing a protest. If a protest is filed and not withdrawn
within 30 days after the time allowed for filing a protest, the instant
request shall be treated as an application for authorization pursuant
to Section 7 of the NGA.
Lois D. Cashell,
Secretary.
[FR Doc. 96-32289 Filed 12-19-96; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 12/20/1996
- Department:
- Energy Department
- Entry Type:
- Notice
- Document Number:
- 96-32289
- Pages:
- 67327-67327 (1 pages)
- Docket Numbers:
- Docket No. CP97-150-000
- PDF File:
-
96-32289.pdf