Plan for Sharing the Costs of Microwave Relocation
AGENCY: Federal Communications Commission.
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: By this Second Report and Order, the Commission amends certain
aspects of the microwave relocation rules, which were first established
in the Emerging Technologies proceeding and were modified and clarified
in the First Report and Order and Further Notice of Proposed Rule
Making in this docket. Specifically, the Commission adjusts the
relocation timetables for the broadband PCS C, D, E, and F blocks by
shortening the voluntary negotiation period applicable to each block
for non-public safety incumbents by one year. This change will
facilitate the relocation process for the most recently licensed PCS
blocks and will create incentives for all parties to enter into early
negotiations. The Commission does not alter the timetable for public
safety incumbents in the broadband PCS C, D, E, and F blocks. In
addition, the Commission permits microwave incumbents to participate in
the cost-sharing program adopted in the First Report and Order. The
cost-sharing program currently allows PCS licensees who relocate
microwave incumbents to obtain reimbursement rights and collect
reimbursement under the cost-sharing plan from later-entrant PCS
licensees that benefit from the relocation.
EFFECTIVE DATE: May 19, 1997.
FOR FURTHER INFORMATION CONTACT: Michael Hamra, Wireless
Telecommunications Bureau, (202) 418-0620.
SUPPLEMENTARY INFORMATION: This is a synopsis of the Second Report and
Order, adopted February 13, 1997 and released February 27, 1997. The
complete text of this Second Report and Order is available for
inspection and copying during normal business hours in the FCC
Reference Center, Room 230, 1919 M Street, NW., Washington, DC, and
also may be purchased from the Commission's copy contractor,
International Transcription Service, at (202) 857-3800, 2100 M Street,
NW., Suite 140, Washington, DC 20037.
I. Background
1. In the Emerging Technologies proceeding, ET Docket No. 92-9, 57
FR 49020 (October 29, 1992) the Commission reallocated the 1850-1990,
2110-2150, and 2160-2200 MHz bands from private and common carrier
fixed microwave services to emerging technology services. In that
proceeding the Commission established the procedures for relocating 2
GHz microwave incumbents to available frequencies in higher bands or to
other media. These procedures are intended to encourage incumbents to
negotiate relocation agreements with emerging technology licensees or
manufacturers of unlicensed devices to accelerate the deployment of
emerging technologies.
2. The relocation process established in that proceeding provided
two negotiation periods that must expire before an emerging technology
licensee may request involuntary relocation of the incumbent. The first
is a fixed two-year period for voluntary negotiations--three years for
public safety incumbents, e.g., police, fire, and emergency medical
licensees--commencing with the Commission's acceptance of long form
(Form 600) applications for emerging technology services. During that
time period, the emerging technology providers and microwave licensees
may negotiate any mutually acceptable relocation agreement. Such
negotiations are strictly voluntary. At any time following the
conclusion of the voluntary negotiation period, the emerging technology
licensee may initiate a one-year mandatory negotiation period--two
years for public safety licensees. During this period the parties are
required to negotiate in good faith. If the parties fail to reach an
agreement during these periods, the emerging technology provider may
request involuntary relocation of the existing facility. As a condition
of relocation, however, the emerging technology licensee is required to
pay the cost of relocating the incumbent to a comparable facility.
3. In the Commission's First Report and Order in WT Docket 95-157,
61 FR 29679 (June 12, 1996) the Commission adopted a cost-sharing
formula that allows a PCS licensee who relocates an incumbent microwave
system to obtain reimbursement rights and collect reimbursement from
later-entrant PCS licensees that benefit from the relocation under a
cost-sharing plan administered by the industry. The Commission also
addressed concerns
[[Page 12753]]
raised by PCS licensees that negotiations during the voluntary period
for the A and B blocks were not progressing as fast as they should and
were potentially delaying the deployment of PCS service to the public.
The Commission decided that altering the timetable for A and B block
negotiation periods at that time would not be in the public interest
because ongoing negotiations were likely to be interrupted, while
parties re-assessed their positions to the detriment of the process and
ultimately, the public interest. In the Further Notice of Proposed Rule
Making (Further NPRM) 61 FR 24470 (May 15, 1996) accompanying the First
Report and Order, however, the Commission sought comment on a proposal
to shorten the voluntary negotiation period and lengthen the mandatory
negotiation period for the D, E, and F blocks and on whether these same
changes should apply to the C block.
4. In the Further NPRM, the Commission also considered whether to
allow microwave incumbents who pay their own relocation expenses to
participate in the cost-sharing plan adopted in the First Report and
Order under certain conditions. To further expedite clearing of the
band, the Commission tentatively concluded that incumbents should be
permitted to relocate their own links and obtain reimbursement rights
pursuant to the cost-sharing plan.
II. Discussion
A. Voluntary and Mandatory Negotiation Periods for D, E, and F Blocks
5. The comments of both PCS licensees and microwave incumbents have
confirmed that most incumbents are willing to negotiate reasonable
relocation agreements during the voluntary negotiation period. As many
PCS licensees argue, however, the current length of the voluntary
period unnecessarily provides opportunities for some incumbents to
demand excessive premiums from PCS licensees after they have invested
substantial amounts at auction and face competitive pressure to
construct their systems and enter the market, particularly on 10 MHz
blocks where PCS licensees have limited flexibility to build around
incumbents. In addition, because of the staggered timing of PCS
licensing, D, E, and F block licensees who are unable to negotiate
voluntary agreements cannot initiate mandatory negotiations for more
than a year after their A and B block competitors have begun such
negotiations. Thus, the current rules give the A and B block licensees
a significant ``head start'' in the relocation process.
6. The Commission agrees that shortening the voluntary period for
non-public safety incumbents in the D, E, and F blocks by one year will
spur voluntary negotiations and speed the deployment of PCS services to
the public. This modification will also enhance competitive parity by
reducing the A and B block licensees' head start in the relocation
process. The voluntary period for the A and B block licensees expires
on April 5, 1997 (with respect to non-public safety incumbents), at
which point A and B block licensees may begin mandatory negotiations.
Shortening the voluntary period for D, E, and F blocks will help
licensees in those blocks to initiate mandatory negotiations a year
earlier than under the current rules, providing some compensation for
the fact that the D, E, and F block voluntary negotiation period
commenced approximately twenty-one months after the A and B block
voluntary negotiation period. The A and B block voluntary negotiation
period commenced April 5, 1995. The D, E, and F block voluntary
negotiation period will commence January 30, 1997, when long forms are
filed. The Commission therefore amends the rules and shortens the
voluntary negotiation period for the D, E, and F blocks by one year for
non-public safety incumbents.
7. The Commission concludes that shortening the voluntary
negotiation period for non-public safety incumbents in the D, E, and F
blocks at this juncture will not adversely affect such incumbents. The
Commission notes that microwave incumbents have been on notice since
October 1992 that they will be required to relocate to alternative
spectrum. Moreover, the Commission's experience with voluntary
negotiations in the A and B blocks indicates that most incumbents who
are motivated to enter into voluntary agreements are willing to do so
early in the voluntary period and do not require prolonged negotiations
to reach an agreement. Under the timetables adopted here, D, E, and F
block incumbents will continue to have a reasonable window for
voluntary negotiations and may continue to negotiate in the mandatory
negotiation period. Moreover, if parties are successfully negotiating
an agreement during the voluntary negotiation period and believe that
more time is needed, they may agree to postpone commencement of the
mandatory period. Finally, shortening of the voluntary period does not
alter the Commission's fundamental policy that incumbents must be made
whole for the reasonable expense of being relocated to comparable
facilities, regardless of whether relocation occurs in the voluntary
period, the mandatory period, or as a result of involuntary relocation.
8. While the Commission adopts it's proposal to shorten the
voluntary negotiation period for non-public safety incumbents in the D,
E, and F blocks, the Commission concludes it is unnecessary to lengthen
the one-year mandatory negotiation period. Because the D, E, and F
blocks are 10 MHz blocks, there are fewer links to relocate than in the
30 MHz A, B, and C blocks. In addition, no additional time should be
required for mandatory negotiation in the D, E, and F blocks because
many of the links will have been relocated by A, B, and C block
licensees by the time the D, E, and F block licensees commence
negotiations. The Commission is encouraged, from our discussions with
industry, by the speed with which relocation agreements are being
negotiated and believe that a total of two years, (one year voluntary
and one year mandatory) is sufficient to accommodate negotiations
between non-public safety incumbents and D, E, and F block licensees.
Lengthening the mandatory negotiation period by one year, on the other
hand, will do little to accomplish the Commission's objective of
speeding the deployment of PCS services to the public. The Commission
also do not believe that non-public safety incumbents will be harmed by
a shorter combined negotiation period because in conjunction with these
changes, the Commission is providing microwave incumbents more
flexibility to self-relocate by permitting them to participate in the
Commission's cost-sharing plan (see, infra, para. 22). Consequently,
the Commission declines to increase the amount of time in the mandatory
period needed to complete the relocation process for these blocks.
9. The Commission declines to alter the voluntary or mandatory
negotiation periods for public safety incumbents in the D, E, and F
blocks. Under the Commission's current rules, public safety incumbents
in the 2 GHz band are distinguished from non-public safety 2 GHz
incumbents in that they have a three-year voluntary and a two-year
mandatory negotiation period. The Commission has given public safety
incumbents more time to negotiate and relocate because of the
importance of ensuring a seamless transition for facilities that
support vital emergency services such as police, fire, and emergency
medical treatment. In addition, the longer negotiation timetable
reflects the fact that public safety agencies typically operate under
[[Page 12754]]
greater budgetary constraints and longer planning cycles than non-
public safety entities. For example, the LA Sheriff's Department notes
that replacing its 2 GHz simulcast mobile network entails a lengthy
review and approval process in which numerous county personnel must
participate at all stages. APCO contends that for public safety
agencies, the relocation process requires significant commitment of
scarce agency time and resources to ensure that vital emergency
communications will not be compromised or disrupted. The Commission
agrees that these continue to be significant concerns that distinguish
public safety incumbents from other incumbents. The Commission further
concludes that there is insufficient support in the record for
modifying the negotiation timetable for public safety incumbents at
this time. Even prior to the commencement of negotiations, many public
safety agencies have begun to plan for relocation in reliance on the
existing rules. Because changing the rules could disrupt this process,
and because of the vital importance of providing the public with
reliable emergency communications, the Commission concludes that the
current relocation timetable for public safety agencies in the D, E,
and F blocks should be retained.
10. The Commission does not believe that retaining the current
relocation rules for public safety incumbents will adversely affect PCS
licensees in the D, E, and F blocks. Because public safety incumbents
account for fewer than 20 percent of the microwave facilities in all
PCS blocks, PCS licensees will be able to clear most of their spectrum
under the shorter timetable applicable to non-public safety licensees.
In addition, the Commission's experience after twenty-one months of
voluntary negotiations in the A and B blocks indicates that most public
safety incumbents in those blocks have entered into voluntary
negotiations with PCS licensees and are cooperating in the relocation
process. Based on this experience, the Commission anticipates that
public safety agencies in the D, E, and F blocks will not wait until
the conclusion of the voluntary period to begin negotiations requested
by D, E, and F block licensees and will make good-faith efforts to
complete the relocation process in a reasonable time. Because the
Commission believes that the current rules fairly balance the interests
of PCS licensees and public safety incumbents, the Commission concludes
that further alteration to the voluntary or mandatory negotiation
periods for public safety incumbents is unnecessary.
B. Voluntary and Mandatory Negotiation Periods for C Block
11. The C block winners are potentially at a greater disadvantage
compared to A and B block winners under the current voluntary
negotiation timetable. Currently the voluntary negotiation period for
non-public safety incumbents and A and B block licensees will expire
April 5, 1997, whereas the equivalent voluntary negotiation period for
C block will expire May 22, 1998. The C block winners are small
businesses that do not have financial resources similar to their A and
B block competitors. The C block is an entrepreneurs block that
restricted eligibility to applicants with gross revenues of less than
$125 million in each of the last two years and total assets of less
than $500 million at the time the applicants' short-form application
(Form 175) was filed. It is not as feasible for a small business to pay
premiums to accelerate negotiations. The purpose of the special C block
bidding rules is to encourage small business participation in PCS. The
Commission believes an extended voluntary negotiation period could
hinder or deter small businesses from effectively participating in the
PCS business because it increases the likelihood that they will incur
start-up business expenses such as relocation premiums and related
costs due to extended negotiations. The Communications Act requires the
Commission to eliminate market entry barriers for entrepreneurs and
small businesses. The Commission believes that modifying the
negotiation periods will eliminate market entry barriers pursuant to
Section 257 of the Communications Act and will assist small businesses
in C block to deploy service to the consumer faster. The Commission
concludes that these factors are sufficiently compelling to justify
modification of the voluntary negotiation period for non-public safety
incumbents, even though negotiations have commenced. The Commission
therefore shortens the voluntary negotiation period for C block to one
year for non-public safety incumbents, which will cause it to terminate
on May 22, 1997.
12. Similar to the Commission's decision not to extend the
mandatory negotiation period in the D, E, and F blocks, the Commission
also conclude that it is unnecessary to extend the mandatory
negotiation period for non-public safety incumbents in the C block. As
in the case of the D, E, and F blocks, the Commission believe that no
additional time is required for mandatory negotiations in the C block
because many C block links will have been relocated by A and B block
licensees by the time C block licensees commence mandatory
negotiations. The Commission also believes that a combined two-year
negotiation period will be sufficient for negotiations between C block
licensees and non-public safety incumbents, whereas lengthening the
mandatory period by one year could delay the deployment of PCS services
to the public. Also, microwave incumbents will have greater flexibility
in the relocation process because the Commission is permitting them to
participate in the Commission's cost-sharing plan (see, infra, para.
22). In addition, by retaining the one-year mandatory negotiation
period for C block, the Commission achieves greater symmetry with the
negotiations period for A and B blocks: the earliest that the mandatory
negotiation period for C block will expire is now May 22, 1998 for non-
public safety incumbents--approximately the same time as the A and B
block mandatory negotiation periods, which in most cases should expire
April 5, 1998. This will create greater parity between C block
entrepreneurs and their A and B block competitors in terms of clearing
the band and offering service to the public.
13. The Commission declines to alter the voluntary or mandatory
negotiation periods for public safety incumbents in the C block for the
same reasons the Commission has articulated for the D, E, and F blocks.
As modified, the voluntary negotiation period for the C block will
expire on May 22, 1997 for non-public safety incumbents--approximately
the same time as the A and B block voluntary negotiation periods, which
end April 5, 1997. The voluntary negotiation period for public safety
incumbents in the C block will remain unchanged and will end May 22,
1999--approximately one year after the voluntary negotiation period for
public safety incumbents in the A and B block voluntary negotiation
periods end, which is April 5, 1998.
C. Microwave Incumbent Participation in Cost-Sharing Plan
14. The Commission adopts it's tentative conclusion from the
Further Notice of Proposed Rule Making, to permit microwave incumbents
that relocate themselves to obtain reimbursement rights and collect
reimbursement under the Commission's cost-sharing plan from subsequent
PCS licensees that would have interfered with the relocated link had it
not been
[[Page 12755]]
moved. The Commission agrees with PCS licensees and microwave
incumbents who argue that incumbent participation will accelerate the
relocation process by promoting system-wide relocations. Incumbent
participation will also give microwave incumbents the option of
avoiding time-consuming negotiations, allowing for faster clearing of
the 2 GHz band in some instances. The Commission believes that
promoting system-wide relocation in this way may even reduce the
overall cost of clearing the 2 GHz band.
15. In concluding that microwave incumbents should be allowed to
participate in cost-sharing, the Commission agrees with commenters that
some safeguards are needed to ensure that voluntarily relocating
microwave incumbents do not seek reimbursement for unreasonable
expenses. The Commission therefore will impose the same restrictions on
reimbursement of incumbents that apply to PCS licensees. These include
the limitations under the cost-sharing plan on links for which
reimbursement may be sought, and the monetary cap on the amount a
relocator may be reimbursed for the relocation of each individual
microwave link.
16. The Commission also concludes that the cost-sharing formula,
when applied to microwave incumbents, should include depreciation.
First, a microwave incumbent who voluntarily relocates itself may
obtain benefits it would not realize if it waited to be relocated by a
PCS licensee. Early relocation by the incumbent on a voluntary basis
provides more options for obtaining alternative spectrum, more control
over the relocation process, and reduces uncertainty about further
operations. Depreciation ensures that the self-relocation pays for
these benefits rather than passing them on to a PCS licensee who
otherwise would not have relocated the incumbent until later. Second,
the Commission observed in the First Report and Order that depreciation
creates an incentive for the relocator to minimize costs because its
own share of the cost is not depreciated. The Commission concludes that
this element of the cost-sharing plan applies equally to microwave
incumbents who relocate themselves. Therefore, the Commission retains
depreciation as an incentive for microwave incumbents who relocate
themselves to minimize their relocation costs.
17. Finally, the Commission concludes that microwave incumbents who
self-relocate should be required to provide independent verification of
their relocation costs. Although the cost-sharing plan already requires
all relocators to keep documents of all expenses, the Commission
believe this additional safeguard is appropriate in the case of
incumbents seeking reimbursement. In the case of an incumbent who self-
relocates, it may be difficult for subsequent PCS licensees to verify
the incumbent's costs to determine whether they are compensable under
the cost-sharing plan. Therefore, any incumbent seeking reimbursement
under the cost-sharing plan must submit to the clearinghouse an
independent third party appraisal of its compensable relocation costs.
The appraisal should be based on the actual cost of replacing the
incumbent's system with comparable facilities, and should exclude the
cost of any equipment upgrades that would not be reimbursable under the
cost-sharing plan.
III. Conclusion
18.The changes the Commission makes to the timetables for the
voluntary and mandatory negotiation periods for the broadband PCS C, D,
E, and F blocks will facilitate negotiations between microwave
incumbents and PCS licensees. Allowing microwave incumbents to
participate in the cost-sharing plan will also encourage more rapid
system relocation and will reduce relocation costs. As a result of
these changes, PCS licensees will be able to speed their deployment of
service to the public.
IV. Procedural Matters
A. Regulatory Flexibility Act
As required by Section 603 of the Regulatory Flexibility Act, 5
U.S.C. 603 (RFA), an Initial Regulatory Flexibility Analysis (IRFA) was
incorporated in the Notice of Proposed Rule Making in WT Docket No. 95-
157. The Commission sought written comments on the proposals in the
NPRM, including the IRFA. The Commission's Final Regulatory Flexibility
Analysis (FRFA) in this Order conforms to the RFA, as amended by the
Contract With America Advancement Act of 1996.
Need for and Purpose of the Action: This Second Report and Order
(i) shortens the voluntary negotiation period for all non-public safety
microwave incumbents in the C, D, E, and F blocks by one year, (ii)
allows the microwave incumbents who self-relocate to obtain
reimbursement rights and collect reimbursement under the cost-sharing
formula. The changes adopted herein will facilitate the rapid
relocation of microwave facilities in the 2 GHz band and will
accelerate the deployment of PCS services to the public.
Summary of Significant Issues Raised by the Public Comments in
Response to the Initial Regulatory Flexibility Analysis: No comments
were submitted in response to the IRFA. However, two commenters to the
Further Notice of Proposed Rule Making, raised an issue that might
affect small business entities. The commenters, American Petroleum
Institute (API) and the American Public Power Association (APPA) argued
that shortening the voluntary negotiation periods would disrupt and
impose a significant burden on microwave incumbent businesses by
forcing them to negotiate an agreement during a shorter voluntary
negotiation period. Both commenters believe that without a two-year
voluntary negotiation period, incumbents will be forced to negotiate
during the mandatory negotiation period. The Commission does not
believe that successful negotiations will be forced into the mandatory
negotiation period. If successful negotiations are occurring, parties
may agree not to commence with the mandatory negotiation period and may
continue to negotiate successfully throughout a voluntary negotiation
period.
Description and Estimate of the Number of Small Entities To Which
Rule Will Apply: For purposes of this Order, the Small Business
Administration (SBA) has defined a small business for Standard
Industrial Classification (SIC) category 4813 (Telephone Communications
Except Radiotelephone) to be a small entity when it has fewer than
1,500 employees.
Estimates for Broadband PCS Services: The broadband PCS spectrum is
divided into six frequency blocks designated A through F. As set forth
in 47 CFR 24.720(b), the Commission has defined small businesses in the
C and F block auctions to mean a firm that had average gross revenues
of less than $40 million in the three previous calendar years. The
Commission's definition of a small business has been approved by the
SBA.
The Commission has auctioned broadband PCS licenses in the A, B, C,
D, E, and F blocks. The Commission does not have sufficient data to
determine how many small businesses bid successfully for licenses in
the A and B blocks. There are 81 non-defaulting winning bidders that
qualify as small entities in the C block PCS auctions. Based on this
information, the Commission conclude that the number of broadband PCS
licensees affected by the decisions in this Order includes, at
[[Page 12756]]
a minimum, the 81 non-defaulting winning bidders that qualified as
small entities in the C block broadband PCS auction.
The D, E, and F block auction closed January 14, 1997, but
presently there have been no licenses awarded for the D, E, and F block
auctions. Therefore, there are no small businesses providing these
services. However, there were 125 winning bidders and the Commission
anticipates a total of 1,479 licenses will be awarded in the D, E, and
F blocks. Participation in the F block was limited to entrepreneurs
with under $125 million in average gross revenues over the past three
years. More than 40 percent of the licenses in the D, E, and F blocks
were won by 93 small businesses. The Commission estimate that most, if
not all, of the small businesses will be awarded licenses.
Estimates for Microwave Services: Due to the nature of this private
service, the Commission does not have a definition for small business
with respect to microwave services. Therefore, the Commission will
utilize the SBA's definition applicable to radiotelephone companies--
i.e. an entity with less than 1,500 persons. The Census Bureau reports
that there were 1,176 such companies in operation for at least one year
at the end of 1992. Also, the Federal Communication Commission's Office
of Engineering and Technology developed a study in 1992 that provides
statistical data for all microwave incumbents in 1850 MHz to 1990 MHz
bands. Specifically, the study finds that in the 1850 MHz to 1990 MHz,
local governments, including public safety entities have 168 licensees;
petroleum companies have 67 licenses; power companies have 164
licenses; railroad companies have 18 licenses; and all other microwave
incumbents in this band have 143 licenses. However, the Commission does
not have specific statistics that determine how many of these companies
are small businesses. In addition, this Second Report and Order only
affects microwave incumbents in PCS blocks C, D, E, and F. Therefore,
this Second Report and Order does not affect all microwave incumbents
in the 1850 MHz to 1990 MHz band.
However, the Commission recognizes that a number of microwave
incumbents have already relocated due to the current negotiations of A,
B, and C block PCS licensees. The Commission cannot determine at this
time how many licensees have moved. The Commission therefore is unable
to estimate the number of microwave service providers that qualify
under the SBA's definition.
Description, Projected Reporting, Record keeping and Other
Compliance Requirements: In this Second Report and Order the Commission
allows microwave incumbents who voluntarily relocate their links to
obtain reimbursement from subsequent PCS licensees under the cost-
sharing plan. Microwave incumbents that participate in the cost-sharing
plan will be required to submit documentation itemizing the amount
spent for the actual cost of relocating the links. The voluntarily
relocating microwave incumbent will also be required to submit an
independent third party appraisal of its compensable costs. See, supra,
IV., C, paragraph 27.
Significant Alternatives and Steps Taken By Agency to Minimize
Significant Economic Impact on a Substantial Number of Small Entities
Consistent with Stated Objectives: In the Further Notice of Proposed
Rule Making the Commission sought comment on adjusting the negotiation
periods for the D, E, and F blocks by shortening the voluntary
negotiation period and lengthening the mandatory negotiation period by
the corresponding amount. The Commission also sought comment on whether
the same adjustments should be made in the C block. This Second Report
and Order shortens the voluntary negotiation period for the C, D, E,
and F blocks by one year and lengthens the mandatory negotiation period
for C block by one year. The Commission did not lengthen the mandatory
negotiation period for the D, E, and F blocks because these are 10 MHz
blocks and have fewer links to relocate than in the 30 MHz blocks that
C block has. These alterations were made to diminish the opportunity of
a few incumbents that were delaying negotiations by demanding excessive
premiums from PCS licensees during the voluntary negotiation periods.
Commenters to the Further NPRM generally indicated that microwave
incumbents were negotiating successfully during the voluntary
negotiation period and did not require prolonged negotiations to reach
agreement. The Commission believes that these changes do not affect an
incumbent's ability to negotiate an agreement during the voluntary
negotiation period. If parties are successfully negotiating an
agreement during the voluntary negotiation period, they may agree that
more time is needed, thereby agreeing to postpone the commencement of
the mandatory negotiation period. See, supra, IV., A, paragraph 13.
These alterations will accelerate the deployment of PCS services to
the consumer and still guarantee microwave incumbents full compensation
for relocating.
Report to Congress: The Commission shall send a copy of this Final
Regulatory Flexibility Analysis with this Second Report and Order in a
report to Congress pursuant to Section 251 of the Small Business
Regulatory Enforcement Fairness Act of 1996, 5 U.S.C. 801(a)(1)(A). A
copy of this Regulatory Flexibility Analysis will also be published in
the Federal Register.
B. Authority
Authority for issuance of this Second Report and Order is contained
in the Communications Act, Sections 4(i), 7, 303(c), 303(f), 303(g),
303(r), and 332, 47 U.S.C. 154(i), 157, 303(c), 303(f), 303(g), 303(r),
332, as amended.
C. Ordering Clauses
Accordingly, it is ordered That Parts 24 and 101 of the
Commission's rules are amended as set forth below and will become
effective May 19, 1997.
It is further ordered That the Regulatory Flexibility Analysis, as
required by Section 604 of the Regulatory Flexibility Act, and as set
forth herein is Adopted.
It is further ordered That the Secretary shall send a copy of this
Second Report and Order to the Chief Counsel for Advocacy of the Small
Business Administration.
D. Further Information
For further information concerning this proceeding, contact Michael
Hamra, Wireless Telecommunications Bureau, Commercial Wireless Division
at (202) 418-0620.
List of Subjects
47 CFR Part 24
Personal communications services, Radio.
47 CFR Part 101
Fixed microwave services, Radio.
Federal Communications Commission
William F. Caton,
Acting Secretary.
Rule Changes
Parts 24 and 101 of Chapter I of Title 47 of the Code of Federal
Regulations are amended as follows:
Part 24 of Chapter 1 of Title 47 of the Code of Federal Regulations
is amended as follows:
PART 24--PERSONAL COMMUNICATIONS SERVICES
1. The authority citation for Part 24 continues to read as follows:
[[Page 12757]]
Authority: 47 U.S.C. 154, 301, 302, 303, 309 and 332, unless
otherwise noted.
2. Section 24.5 is amended by adding the definition for
``Voluntarily Relocating Microwave Incumbent'' in alphabetical order to
read as follows:
Sec. 24.5 Terms and definitions.
* * * * *
Voluntarily Relocating Microwave Incumbent. A microwave incumbent
that voluntarily relocates its licensed facilities to other media or
fixed channels.
3. Section 24.239 is revised to read as follows:
Sec. 24.239 Cost-sharing requirements for broadband PCS.
Frequencies in the 1850-1990 MHz band listed in Sec. 101.147(c) of
this chapter have been allocated for use by PCS. In accordance with
procedures specified in Secs. 101.69 through 101.81 of this chapter,
PCS entities (both licensed and unlicensed) are required to relocate
the existing Fixed Microwave Services (FMS) licensees in these bands if
interference to the existing FMS operations would occur. All PCS
entities who benefit from spectrum clearance by other PCS entities or a
voluntarily relocating microwave incumbent, must contribute to such
relocation costs. PCS entities may satisfy this requirement by entering
into private cost-sharing agreements or agreeing to terms other than
those specified in Sec. 24.243. However, PCS entities are required to
reimburse other PCS entities or voluntarily relocating microwave
incumbents that incur relocation costs and are not parties to the
alternative agreement. In addition, parties to a private cost-sharing
agreement may seek reimbursement through the clearinghouse (as
discussed in Sec. 24.241) from PCS entities that are not parties to the
agreement. The cost-sharing plan is in effect during all phases of
microwave relocation specified in Sec. 101.69 of this chapter.
4. Section 24.243 is revised to read as follows:
Sec. 24.243 The cost-sharing formula.
A PCS relocator who relocates an interfering microwave link, i.e.
one that is in all or part of its market area and in all or part of its
frequency band or a voluntarily relocating microwave incumbent, is
entitled to pro rata reimbursement based on the following formula:
[GRAPHIC] [TIFF OMITTED] TR18MR97.001
(a) RN equals the amount of reimbursement.
(b) C equals the actual cost of relocating the link. Actual
relocation costs include, but are not limited to, such items as: Radio
terminal equipment (TX and/or RX--antenna, necessary feed lines, MUX/
Modems); towers and/or modifications; back-up power equipment;
monitoring or control equipment; engineering costs (design/path
survey); installation; systems testing; FCC filing costs; site
acquisition and civil works; zoning costs; training; disposal of old
equipment; test equipment (vendor required); spare equipment; project
management; prior coordination notification under Sec. 101.103(d) of
this chapter; site lease renegotiation; required antenna upgrades for
interference control; power plant upgrade (if required); electrical
grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if
required); alternate transport equipment; and leased facilities. C also
includes voluntarily relocating microwave incumbent's independent third
party appraisal of its compensable relocation costs and incumbent
transaction expenses that are directly attributable to the relocation,
subject to a cap of two percent of the ``hard'' costs involved. C may
not exceed $250,000 per link, with an additional $150,000 permitted if
a new or modified tower is required.
(c) N equals the number of PCS entities that would have interfered
with the link. For the PCS relocator, N = 1. For the next PCS entity
that would have interfered with the link, N=2, and so on.
(d) Tm equals the number of months that have elapsed between the
month the PCS relocator obtains reimbursement rights and the month that
the clearinghouse notifies a later-entrant of its reimbursement
obligation. A PCS relocator obtains reimbursement rights on the date
that it signs a relocation agreement with a microwave incumbent.
5. Section 24.245 is amended by revising paragraphs (a) and (b) to
read as follows:
Sec. 24.245 Reimbursement under the cost-sharing plan.
(a) Registration of reimbursement rights. (1) To obtain
reimbursement, a PCS relocator must submit documentation of the
relocation agreement to the clearinghouse within ten business days of
the date a relocation agreement is signed with an incumbent.
(2) To obtain reimbursement, a voluntarily relocating microwave
incumbent must submit documentation of the relocation to the
clearinghouse within ten business days of the date that relocation
occurs.
(b) Documentation of expenses. Once relocation occurs, the PCS
relocator or the voluntarily relocating microwave incumbent, must
submit documentation itemizing the amount spent for items listed in
Sec. 24.243(b). The voluntarily relocating microwave incumbent, must
also submit an independent third party appraisal of its compensable
relocation costs. The appraisal should be based on the actual cost of
replacing the incumbent's system with comparable facilities and should
exclude the cost of any equipment upgrades or items outside the scope
of Sec. 24.243(b). The PCS relocator or the voluntarily relocating
microwave incumbent, must identify the particular link associated with
appropriate expenses (i.e., costs may not be averaged over numerous
links). If a PCS relocator pays a microwave incumbent a monetary sum to
relocate its own facilities, the PCS relocator must estimate the costs
associated with relocating the incumbent by itemizing the anticipated
cost for items listed in Sec. 24.243(b). If the sum paid to the
incumbent cannot be accounted for, the remaining amount is not eligible
for reimbursement. A PCS relocator may submit receipts or other
documentation to the clearinghouse for all relocation expenses incurred
since April 5, 1995.
* * * * *
6. Section 24.247 is amended by revising the introductory text of
paragraph (a) to read as follow:
Sec. 24.247 Triggering a reimbursement obligation.
(a) Licensed PCS. The clearinghouse will apply the following test
to determine if a PCS entity preparing to initiate operations must pay
a PCS relocator or a voluntarily relocating microwave incumbent in
accordance with the formula detailed in Sec. 24.243:
* * * * *
7. Section 24.249 is amended by revising paragraph (a) to read as
follows:
Sec. 24.249 Payment issues.
(a) Timing. On the day that a PCS entity files its prior
coordination notice (PCN) in accordance with Sec. 101.103(d) of this
chapter, it must file a copy of the PCN with the clearinghouse. The
clearinghouse will determine if any reimbursement obligation exists and
notify the PCS entity in writing of its repayment obligation, if any.
When the PCS entity receives a written copy of such obligation, it must
pay directly to the PCS relocator or the voluntarily relocating
microwave incumbent the
[[Page 12758]]
amount owed within thirty days, with the exception of those businesses
that qualify for installment payments. A business that qualifies for an
installment payment plan must make its first installment payment within
thirty days of notice from the clearinghouse. UTAM's first payment will
be due thirty days after its reimbursement obligation is triggered as
described in Sec. 24.247(b).
* * * * *
PART 101--FIXED MICROWAVE SERVICES
8. The authority citation for Part 101 continues to read as
follows:
Authority: 47 U.S.C. Secs. 154, 303, unless otherwise noted.
9. Section 101.69 is revised to read as follows:
Sec. 101.69 Transition of the 1850-1990 MHz, 2110-2150 MHz, and 2160-
2200 MHz bands from the fixed microwave services to personal
communications services and emerging technologies.
Fixed Microwave Services (FMS) frequencies in the 1850-1990 MHz,
2110-2150 MHz, and 2160-2200 MHz bands listed in Secs. 101.147(c), (d)
and (e) have been allocated for use by emerging technology (ET)
services, including Personal Communications Services (PCS). The rules
in this section provide for a transition period during which ET
licensees may relocate existing FMS licensees using these frequencies
to other media or other fixed channels, including those in other
microwave bands.
(a) ET licensees may negotiate with FMS licensees authorized to use
frequencies in the 1850-1990 MHz, 2110-2150 MHz, and 2160-2200 MHz
bands, for the purpose of agreeing to terms under which the FMS
licensees would:
(1) Relocate their operations to other fixed microwave bands or
other media; or alternatively
(2) Accept a sharing arrangement with the ET licensee that may
result in an otherwise impermissible level of interference to the FMS
operations.
(b) Except as provided in paragraph (c) of this section, FMS
operations in the 1850-1990 MHz, 2110-2150 MHz, and 2160-2200 MHz
bands, with the exception of public safety facilities defined in
Sec. 101.77, will continue to be co-primary with other users of this
spectrum until two years after the FCC commences acceptance of
applications for ET services (voluntary negotiation period), and until
one year after an ET licensee initiates negotiations for relocation of
the fixed microwave licensee's operations (mandatory negotiation
period). In the 1910-1930 MHz band allocated for unlicensed PCS, FMS
operations will continue to be co-primary until one year after UTAM,
Inc. initiates negotiations for relocation of the fixed microwave
licensee's operations. Except as provided in paragraph (c) of this
section, public safety facilities defined in Sec. 101.77 will continue
to be co-primary in these bands until three years after the Commission
commences acceptance of applications for an emerging technology service
(voluntary negotiation period), and until two years after an emerging
technology service licensee or an emerging technology unlicensed
equipment supplier or representative initiates negotiations for
relocation of the fixed microwave licensee's operations (mandatory
negotiation period). If no agreement is reached during either the
voluntary or mandatory negotiation periods, an ET licensee may initiate
involuntary relocation procedures. Under involuntary relocation, the
incumbent is required to relocate, provided that the ET licensee meets
the conditions of Sec. 101.75.
(c) Voluntary and mandatory negotiation periods for PCS C, D, E,
and F blocks are defined as follows:
(1) Non-public safety incumbents will have a one-year voluntary
negotiation period and a one-year mandatory negotiation period; and
(2) Public safety incumbents will have a three-year voluntary
negotiation period and a two-year mandatory negotiation period.
10. Section 101.71 is revised to read as follows:
Sec. 101.71 Voluntary negotiations.
During the voluntary negotiation period, negotiations are strictly
voluntary and are not defined by any parameters. However, if the
parties have not reached an agreement within one year after the
commencement of the voluntary period for non-public safety entities, or
within three years after the commencement of the voluntary period for
public safety entities, the FMS licensee must allow the ET licensee if
it so chooses to gain access to the existing facilities to be relocated
so that an independent third party can examine the FMS licensee's 2 GHz
system and prepare an estimate of the cost and the time needed to
relocate the FMS licensee to comparable facilities. The ET licensee
must pay for any such estimate.
11. Section 101.73 is amended by revising paragraph (a) to read as
follows:
Sec. 101.73 Mandatory negotiations.
(a) If a relocation agreement is not reached during the voluntary
period, the ET licensee may initiate a mandatory negotiation period.
This mandatory period is triggered at the option of the ET licensee,
but ET licensees may not invoke their right to mandatory negotiation
until the voluntary negotiation period has expired.
* * * * *
12. Section 101.77 is amended by revising the section heading and
paragraph (a) to read as follows:
Sec. 101.77 Public safety licensees in the 1850-1990 MHz, 2110-2150
MHz, and 2160-2200 MHz bands.
(a) Public safety facilities are subject to the three-year
voluntary and two-year mandatory negotiation period, except as
otherwise defined in paragraph 101.69(c). In order for public safety
licensees to qualify for extended negotiation periods, the department
head responsible for system oversight must certify to the ET licensee
requesting relocation that:
(1) The agency is a licensee in the Police Radio, Fire Radio,
Emergency Medical, Special Emergency Radio Services, or that it is a
licensee of other part 101 facilities licensed on a primary basis under
the eligibility requirements of part 90, subparts B and C; and
(2) The majority of communications carried on the facilities at
issue involve safety of life and property.
* * * * *
13. Section 101.79 is amended by revising the section heading and
paragraph (a) to read as follows:
Sec. 101.79 Sunset provisions for licensees in the 1850-1990 MHz,
2110-2150 MHz, and 2150-2160 MHz bands.
(a) FMS licensees will maintain primary status in the 1850-1990
MHz, 2110-2150 MHz, and 2160-2200 MHz bands unless and until an ET
licensee requires use of the spectrum. ET licensees are not required to
pay relocation costs after the relocation rules sunset (i.e. ten years
after the voluntary period begins for the first ET licensees in the
service). Once the relocation rules sunset, an ET licensee may require
the incumbent to cease operations, provided that the ET licensee
intends to turn on a system within interference range of the incumbent,
as determined by TIA Bulletin 10-F of any standard successor. ET
licensee notification to the affected FMS licensee must be in writing
and must provide the incumbent with no less than six months to vacate
the spectrum. After the six-month notice period has expired, the FMS
licensee must turn its license back into the
[[Page 12759]]
Commission, unless the parties have entered into an agreement which
allows the FMS licensee to continue to operate on a mutually agreed
upon basis.
* * * * *
14. Section 101.81 is amended by revising the section heading and
the introductory paragraph to read as follows:
Sec. 101.81 Future licensing in the 1850-1990 MHz, 2110-2150 MHz, and
2160-2200 MHz bands.
After April 25, 1996, all major modifications and extensions to
existing FMS systems in the 1850-1990 MHz, 2110-2150 MHz, and 2160-2200
MHz bands will be authorized on a secondary basis to ET systems. All
other modifications will render the modified FMS license secondary to
ET operations, unless the incumbent affirmatively justifies primary
status and the incumbent FMS licensee establishes that the modification
would add to the relocation costs of ET licensees. Incumbent FMS
licensees will maintain primary status for the following technical
changes:
* * * * *
[FR Doc. 97-6751 Filed 3-17-97; 8:45 am]
BILLING CODE 6712-01-P