[Federal Register Volume 62, Number 35 (Friday, February 21, 1997)]
[Rules and Regulations]
[Pages 7921-7922]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 97-4334]
========================================================================
Rules and Regulations
Federal Register
________________________________________________________________________
This section of the FEDERAL REGISTER contains regulatory documents
having general applicability and legal effect, most of which are keyed
to and codified in the Code of Federal Regulations, which is published
under 50 titles pursuant to 44 U.S.C. 1510.
The Code of Federal Regulations is sold by the Superintendent of Documents.
Prices of new books are listed in the first FEDERAL REGISTER issue of each
week.
========================================================================
Federal Register / Vol. 62, No. 35 / Friday, February 21, 1997 /
Rules and Regulations
[[Page 7921]]
DEPARTMENT OF AGRICULTURE
Rural Utilities Service
7 CFR Part 1710
Temporary Loan Processing Procedures for Insured Electric Loans
AGENCY: Rural Utilities Service, USDA.
ACTION: Interim final rule with request for comments.
-----------------------------------------------------------------------
SUMMARY: The Rural Utilities Service (RUS) is amending its rule to
allow RUS to process loans with a loan period of more than 2 years in
two parts when applications substantially exceed available funds. RUS
amended its rules in 1995 to lengthen the allowable loan period for
insured electric loans from 2 years to 4 years. Since borrowers may now
apply for loans to cover construction financing needs for a longer
period of time, the average loan has become larger. At the same time,
loan authority for FY 1997 is less than for 1996. This situation has
produced long delays between the time applications are submitted and
the time loans can be approved. RUS believes that this is a temporary
situation that will disappear as more and more borrowers get on a
longer loan application cycle. The rule is intended to reduce
processing delays.
DATES: This rule is effective February 21, 1997. Written comments must
be received by RUS or bear a postmark or equivalent not later than May
22, 1997.
ADDRESSES: Submit written comments to Sue Arnold, Financial Analyst,
U.S. Department of Agriculture, Rural Utilities Service, Room 4032-S,
1400 Independence Avenue, SW, STOP 1522, Washington, DC 20250-1500. RUS
requires, in hard copy, a signed original and 3 copies of all comments
(7 CFR 1700.30(e)). Comments will be available for public inspection
during regular business hours (7 CFR 1.27(b)).
FOR FURTHER INFORMATION CONTACT: Sue Arnold, Financial Analyst, U.S.
Department of Agriculture, Rural Utilities Service, Room 4032-S, 1400
Independence Avenue, SW., STOP 1522, Washington, DC 20250-1522.
Telephone: 202-720-0736. FAX: 202-720-4120. E-mail:
sarnold@rus.usda.gov.
SUPPLEMENTARY INFORMATION: This regulatory action has been determined
to be not significant for the purposes of Executive Order 12866,
Regulatory Planning and Review, and, therefore has not been reviewed by
the Office of Management and Budget (OMB). The Administrator of RUS has
determined that a rule relating to the RUS electric loan program is not
a rule as defined in the Regulatory Flexibility Act (5 U.S.C. 601 et
seq.) for which RUS published a general notice of proposed rulemaking
pursuant to 5 U.S.C. 553(b), or any other law. Therefore, the
Regulatory Flexibility Act does not apply to this rule. The
Administrator of RUS has determined that this rule will not
significantly affect the quality of the human environment as defined by
the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
Therefore, this action does not require an environmental impact
statement or assessment. This rule is excluded from the scope of
Executive Order 12372, Intergovernmental Consultation, which may
require consultation with State and local officials. A Notice of Final
Rule titled Department Programs and Activities Excluded from Executive
Order 12372 (50 FR 47034) exempts RUS electric loans and loan
guarantees from coverage under this Order. This rule has been reviewed
under Executive Order 12988, Civil Justice Reform. RUS has determined
that this rule meets the applicable standards provided in Sec. 3 of the
Executive Order.
The program described by this rule is listed in the Catalog of
Federal Domestic Assistance Programs under number 10.850 Rural
Electrification Loans and Loan Guarantees. This catalog is available on
a subscription basis from the Superintendent of Documents, the United
States Government Printing Office, Washington, DC 20402-9325.
Information Collection and Recordkeeping Requirements
The recordkeeping and reporting burdens contained in this rule were
approved by the Office of Management and Budget (OMB) pursuant to the
Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35, as amended)
under control number 0572-0032.
Background
On January 21, 1995, at 60 FR 3726, RUS amended its rules to
lengthen the maximum allowable loan period from 2 years to 4 years for
most insured loans. The loan period, sometimes referred to as the
financing period, means the period of time during which the facilities
listed in a loan application will be constructed. The loan period was
lengthened in order to reduce administrative costs to borrowers,
supplemental lenders, and RUS of submitting and processing multiple
applications.
Since borrowers may now apply for loans covering financing needs
for a longer period of time, the average loan size has become larger.
At the same time, budget authority for FY 1997 is less than for FY
1996. In FY 1996, RUS used all its budget authority for municipal rate
loans and hardship rate loans, approving 97 municipal rate loans (a
total of $544,616,858) and 23 hardship rate loans ($90,577,664). On
September 30, 1996, the end of the FY, RUS had a backlog of 106
applications for municipal rate loans ($709.0 million) and 28
applications for hardship rate loans ($119.9 million). Additional
applications have been received during FY 97. Total budget authority
for FY 1997 for municipal rate and hardship rate loans is only
$455,564,561 and $68,785,578, respectively.
The large difference between loan funds requested for eligible
purposes, and loan funds available for lending has caused long delays
between the time a loan application is submitted and the time RUS can
act on the application. Currently the queue for municipal rate loans is
about a year, and the queue for hardship rate loans is approaching 16
months.
In spite of the smaller budget authority, RUS believes that the
loan queue will be significantly shortened as more and more borrowers
get used to a longer loan application cycle. However, in those years
when there is a significant shortfall in available funding, the agency
must have the flexibility to manage the limited resources. This interim
final rule will give RUS such flexibility, and will
[[Page 7922]]
provide borrowers with a degree of financial certainty.
The rule will allow RUS to process applications for loans with a
loan period of more than 2 years in two parts during a fiscal year when
applications substantially exceed available funds. RUS will notify all
electric borrowers in writing before invoking these procedures.
RUS recognizes that the success of the electric program in
maintaining high quality electric service at reasonable rates in rural
areas depends on the ability of electric borrowers to maintain and
improve their electric systems. The temporary procedures in this rule
will assist borrowers in the essential task of planning and managing
their cash flows.
Concurrent with the publication of this rule, RUS is issuing
Bulletin 1710C-1, Temporary Processing Procedures for Insured Electric
Loans, a compliance guide to assist borrowers, supplemental lenders,
and other interested parties. RUS is mailing the rule and the bulletin
to all electric borrowers and to supplemental lenders. RUS believes
that the procedures in the bulletin will allow all borrowers to share
the limited loan appropriations on a fair and equitable basis.
Because of: (1) The exceptionally large backlog of applications for
municipal rate and hardship rate loans, and (2) The urgent need for
processing procedures that will allow RUS to advance loan funds during
the spring construction season, RUS is putting these procedures into
effect immediately for FY 1997. RUS requests comments and suggestions,
especially on alternate methods of allocating the limited amount of
loan funds.
List of Subjects in 7 CFR Part 1710
Electric power, Electric utilities, Loan programs--energy,
Reporting and recordkeeping requirements, Rural areas.
For the reasons set out in the preamble, and under the authority of
7 U.S.C. 901 et seq., RUS amends 7 CFR Part 1710 as follows:
PART 1710--GENERAL AND PRE-LOAN POLICIES AND PROCEDURES COMMON TO
INSURED AND GUARANTEED ELECTRIC LOANS
1. The authority citation for part 1710 continues to read as
follows:
Authority: 7 U.S.C. 901-950(b); Pub. L. 99-591, 100 Stat. 3341;
Pub. L. 103-354, 108 Stat. 3178 (7 U.S.C. 6941 et seq.).
2. Section 1710.106 is amended by revising paragraph (e) to read as
follows:
Sec. 1710.106 Uses of loan funds.
* * * * *
(e)(1) If, in the sole discretion of the Administrator, the amount
authorized for lending for municipal rate loans, hardship rate loans,
and loan guarantees in a fiscal year is substantially less than the
total amount eligible for RUS financing, RUS may limit the size of all
loans of that type approved during the fiscal year. Depending on the
amount of the shortfall between the amount authorized for lending and
the loan application inventory on hand for each type of loan, RUS may
either reduce the amount on an equal proportion basis for all
applicants for that type of loan based on the amount of funds for which
the applicant is eligible, or may shorten the loan period for which
funding will be approved to less than the maximum of 4 years. All
applications for the same type of loan approved during a fiscal year
will be treated in the same manner, except that RUS will not limit
funding to any borrower requesting an RUS loan or loan guarantee of $1
million or less.
(2) If RUS limits the amount of loan funds approved for borrowers,
the Administrator shall notify all electric borrowers early in the
fiscal year of the manner in which funding will be limited. The portion
of the loan application that is not funded during that fiscal year may,
at the borrower's option, be treated as a second loan application
received by RUS at a later date. This date will be determined by RUS in
the same manner for all affected loans and will be based on the
availability of loan funds. The second loan application shall be
considered complete except that the borrower must submit a
certification from a duly authorized corporate official stating that
funds are still needed for loan purposes specified in the original
application and must notify RUS of any changes in its circumstances
that materially affects the information contained in the original loan
application or the primary support documents. See 7 CFR 1710.401(f).
* * * * *
Dated: February 13, 1997.
Jill Long Thompson,
Under Secretary, Rural Development.
[FR Doc. 97-4334 Filed 2-20-97; 8:45 am]
BILLING CODE 3410-15-P