98-2898. Pipeline Safety: Periodic Updates to Pipeline Safety Regulations (1997)  

  • [Federal Register Volume 63, Number 31 (Tuesday, February 17, 1998)]
    [Rules and Regulations]
    [Pages 7721-7724]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-2898]
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    DEPARTMENT OF TRANSPORTATION
    
    Research and Special Programs Administration
    
    49 CFR Parts 190, 191, 192, 193, 195, and 199
    
    [Docket No. RSPA-97-2251; Amdt Nos. 190-7; 191-13; 192-83; 193-15; 194-
    2; 195-61; 198-3; 199-17.]
    RIN 2137-AD03
    
    
    Pipeline Safety: Periodic Updates to Pipeline Safety Regulations 
    (1997)
    
    AGENCY: Research and Special Programs Administration (RSPA), DOT.
    
    ACTION: Direct final rule.
    
    -----------------------------------------------------------------------
    
    SUMMARY: This final rule is part of an annual effort by OPS to improve 
    safety by clarifying and updating the pipeline safety regulations. 
    Revisions include updated references to voluntary specifications and 
    standards incorporated by reference, and various clarifications and 
    grammatical corrections. These updates reflect the most recent editions 
    of each specification and standard incorporated by reference to enable 
    pipeline operators to utilize current technology, materials, and 
    practices. In addition, certain gender-specific terms have been 
    replaced with gender-neutral terms. Consistent with the President's 
    goals of regulatory reinvention and improvement of customer service, 
    this final rule updates the pipeline safety regulations for 1997, 
    thereby reducing costs and enhancing economic growth.
    
    EFFECTIVE DATES: This direct final rule takes effect May 4, 1998. The 
    incorporation by reference of certain publications listed in the rule 
    is approved by the Director of the Federal Register as of May 4, 1998. 
    If RSPA does not receive any adverse comment or notice of intent to 
    file an adverse comment by March 19, 1998 the rule will become 
    effective on the date specified. RSPA will issue a subsequent notice in 
    the Federal Register by April 20, 1998 after the close of the comment 
    period to confirm that fact and reiterate the effective date. If an 
    adverse comment or notice of intent to file an adverse comment is 
    received, RSPA will issue a timely notice in the Federal Register to 
    confirm that fact and RSPA would withdraw the direct final rule in 
    whole or in part. RSPA may then incorporate the adverse comment into a 
    subsequent direct final rule or may publish a notice of proposed 
    rulemaking.
    
    ADDRESSES: Comments should be sent to the Dockets Facility, U.S. 
    Department of Transportation, Plaza 401, 400 Seventh Street, SW, 
    Washington, DC 20590-0001. Comments should identify the docket number 
    (RSPA-97-2251). Persons should submit the original document and one (1) 
    copy. Persons wishing to receive confirmation of receipt of their 
    comments must include a self-addressed, stamped postcard. The Dockets 
    Facility is located on the plaza level of the Nassif Building in Room 
    Number 401, 400 Seventh Street, SW, Washington, DC. The Dockets 
    Facility is open from 10:00 a.m. to 5:00 p.m., Monday through Friday, 
    except on Federal holidays when the facility is closed.
    
    FOR FURTHER INFORMATION CONTACT: Eben M. Wyman, (202) 366-0918, or by 
    e-mail (eben.wyman@rspa.dot.gov), regarding the subject matter of this 
    Notice; or the Dockets Unit, (202) 366-4453, for copies of this final 
    rule or other material in the docket. Further information can be 
    obtained by accessing OPS' Internet Home Page at: ops.dot.gov.
    
    SUPPLEMENTARY INFORMATION:
    
    Background
    
        In a March 1995 memorandum, President Clinton directed Federal 
    regulatory agencies to, among other things, conduct a page-by-page 
    review of all agency regulations, cutting or revising those that were 
    obsolete, intrusive, or better handled by parties other than the 
    Federal government (i.e., private business, State, or local 
    government).
        In response to the President's directive, RSPA issued a final rule 
    on May 24, 1996 (61 FR 26121) that updated references to voluntary 
    specifications and standards. This rulemaking is the second annual 
    update of the pipeline safety regulations to reduce unnecessary burdens 
    on the regulated community and to ensure that the pipeline safety 
    regulations incorporate the most current technical standards and 
    specifications.
    
    Incorporation by Reference
    
        RSPA is incorporating by reference all or portions of nine updated 
    documents containing practices, codes, standards, and specifications 
    developed and published by technical organizations, including the 
    American Society of Mechanical Engineers, American Society for Testing 
    and Materials, Manufacturers Standardization Society of the Valve and 
    Fittings Industry, and National Fire Protection Association. The 
    updated standards incorporate the latest technology and engineering 
    practice. Adoption of these updated documents assures that pipeline 
    operators will not be unnecessarily burdened with outdated materials, 
    design, and construction requirements.
        These documents can be obtained by contacting the following 
    organizations:
        1. American Society for Testing and Materials (ASTM), 100 Barr 
    Harbor Drive, West Conshohocken, PA 19428.
        2. The American Society of Mechanical Engineers (ASME), United 
    Engineering Center, 345 East 47th Street, New York, NY 10017.
        3. Manufacturers Standardization Society of the Valve and Fittings 
    Industry, Inc. (MSS), 127 Park Street, NW, Vienna, VA 22180.
        4. National Fire Protection Association (NFPA), 1 Batterymarch 
    Park, P.O. Box 9101, Quincy, MA 02269-9101.
        These documents are available for inspection at the following 
    locations:
        1. Office of Pipeline Safety, room 2335, U.S. Department of 
    Transportation, 400 7th Street, SW, Washington, DC 20590.
        2. Office of the Federal Register, 800 N. Capitol Street, NW, Suite 
    700, Washington, DC 20408.
    
    Other revisions
    
    Clarifications
    
        This document amends the following pipeline safety regulations to 
    clarify their meaning:
        1. Section 192.16(b)(5) states that ``The operator (if applicable), 
    plumbers,
    
    [[Page 7722]]
    
    and heating contractors can assist in locating, inspecting, and 
    repairing the customer's buried piping.'' This final rule clarifies the 
    reference by deleting the term ``plumbers'' and inserting the phrase 
    ``plumbing contractors''.
        2. Section 192.614(b)(5) requires operators to ``Provide for 
    temporary marking of buried pipelines in the area of excavation 
    activity before, as far as practical, the activity begins.'' This 
    requirement can be confusing to the operator in terms of interpreting 
    the meaning of ``as far as practical.'' Therefore, this final rule 
    amends this paragraph to require temporary marking of buried pipelines 
    before excavation activities begin ``except in emergency situations.''
        3. Section 195.56(a) describes safety-related condition reports 
    ``under Sec. 191.55(a) . . .'', which is inaccurate. Safety-related 
    condition report requirements for Part 195 are contained in 
    Sec. 195.55(a). This final rule makes that clarification.
        4. The last line of Sec. 199.17(a) provides that ``samples may be 
    discarded following the end of the 365-period.'' This final rule 
    clarifies that samples may be discarded following the end of the ``365-
    day period.'' Also, this final rule revises the language containing the 
    term ``his representative,'' on line 8, to remove the specific 
    reference to gender.
    
    Grammatical Corrections
    
        In various sections of the pipeline safety regulations, minor 
    grammatical errors exist that need correction, and gender-specific 
    language that need revision. The following are the grammatical 
    corrections covered in this rulemaking:
        1. Sec. 190.7(a)--addition of a comma after the term ``RSPA'', on 
    line 5, and revision of the language containing the term ``him,'' on 
    line 8, to remove the specific reference to gender.
        2. Sec. 190.203(a)--addition of a comma after the term ``OPS'', on 
    line 3.
        3. Sec. 190.209--addition of a comma after the term ``violation'', 
    on line 2.
        4. Sec. 192.107(b)(2)--addition of a comma after the term 
    ``section'', on line 3.
        5. Sec. 193.2059(d)(1)(i)--deletion of the comma after the term 
    ``but'' and the addition of a comma after the term ``system'' on line 
    8.
    
    Updates
    
        In Sec. 191.21 of the pipeline safety regulations, an authorization 
    date follows the Office of Management and Budget (OMB) Control Number. 
    Although the OMB number is still current, this notice removes the 
    unnecessary authorization date. This section is amended to read as 
    follows:
        1. Sec. 191.21--the chart provided in this section is amended to 
    remove the reference to the March 31, 1986, as the final date of 
    approval for this OMB Control Number. This number is still current and 
    there is no date limiting its authority.
    
    Rulemaking Analyses and Notices
    
    Executive Order 12866 and DOT Regulatory Policies and Procedures
    
        This final rule is not a significant regulatory action under 
    section 3(f) of Executive Order 12866 (58 FR 51735) and, therefore, was 
    not reviewed by the Office of Management and Budget (OMB). The final 
    rule is not significant under the Regulatory Policies and Procedures of 
    the Department of Transportation (44 FR 11034).
    
    Executive Order 12612
    
        The final rule has been analyzed with the principles and criteria 
    in Executive Order 12612 (``Federalism'') (52 FR 41685), and does not 
    have sufficient federalism impacts to warrant the preparation of a 
    federalism assessment.
    
    Regulatory Flexibility Act
    
        Based on the facts available, I certify that this final rule will 
    not have a significant economic impact on a substantial number of small 
    entities.
    
    Paperwork Reduction Act
    
        There are no new information collection requirements in this final 
    rule.
    
    Unfunded Mandates Reform Act of 1995
    
        This rule does not impose unfunded mandates under the Unfunded 
    Mandates Reform Act of 1995. It does not result in costs of $100 
    million or more to either State, local, or tribal governments, in the 
    aggregate, or to the private sector, and is the least burdensome 
    alternative that achieves the objective of the rule.
    
    List of Subjects
    
    49 CFR Part 190
    
        Compliance, Pipeline safety, Reporting.
    
    49 CFR Part 191
    
        Annual reports, Incident reports, Pipeline safety.
    
    49 CFR Part 192
    
        Incorporation by reference, Natural gas, Pipeline safety.
    
    49 CFR Part 193
    
        Incorporation by reference, Liquefied natural gas (LNG), Pipeline 
    safety.
    
    49 CFR Part 195
    
        Anhydrous ammonia, Carbon dioxide, Incorporation by reference, 
    Petroleum, Pipeline safety.
    
    49 CFR Part 199
    
        Drug and alcohol testing, Pipeline safety.
    
        In consideration of the foregoing, RSPA amends 49 CFR Parts 190, 
    191, 192, 193, 195, and 199 as follows:
    
    PART 190--[AMENDED]
    
        1. The authority citation for Part 190 continues to read as 
    follows:
    
        Authority: 33 U.S.C. 1321; 49 U.S.C. 5101-5127, 60101 et seq.; 
    and 49 CFR 1.53.
    
        2. Paragraph (a) of Sec. 190.7 is revised to read as follows:
    
    
    Sec. 190.7  Subpoenas; witness fees.
    
        (a) The Administrator, RSPA, the Chief Counsel, RSPA, or the 
    official designated by the Administrator, RSPA, to preside over a 
    hearing convened in accordance with this part, may sign and issue 
    subpoenas individually on their own initiative or, upon request and 
    adequate showing by any person participating in the proceeding that the 
    information sought will materially advance the proceeding.
    * * * * *
        3. Paragraph (a) of Sec. 190.203 is revised to read as follows:
    
    
    Sec. 190.203  Inspections.
    
        (a) Officers, employees, or agents authorized by the Associate 
    Administrator for Pipeline Safety, RSPA, upon presenting appropriate 
    credentials, are authorized to enter upon, inspect, and examine, at 
    reasonable times and in a reasonable manner, the records and properties 
    of persons to the extent such records and properties are relevant to 
    determining the compliance of such persons with the requirements of 49 
    U.S.C. 60101 et seq., or regulations or orders issued thereunder.
    * * * * *
        4. The introductory text of Sec. 190.209 is revised to read as 
    follows:
    
    
    Sec. 190.209  Response options.
    
        Within 30 days of receipt of a notice of probable violation, the 
    respondent shall respond to the Regional Director who issued the notice 
    in the following way:
    * * * * *
    
    PART 191--[AMENDED]
    
        1. The authority citation for Part 191 continues to read as 
    follows:
    
    
    [[Page 7723]]
    
    
        Authority: 49 U.S.C. 5121, 60102, 60103, 60104, 60108, 60117, 
    60118, and 60124; and 49 CFR 1.53.
    
    
    Sec. 191.21  [Amended]
    
        2. The heading of the chart in Sec. 191.21 is amended to remove the 
    phrase ``APPROVED THROUGH MARCH 31, 1986.''
    
    PART 192--[AMENDED]
    
        1. The authority citation for Part 192 continues to read as 
    follows:
    
        Authority: 49 U.S.C. 5103, 60102, 60104, 60108, 60109, 60110, 
    60113, 60118; and 49 CFR 1.53.
    
        2. Paragraph (b)(5) of Sec. 192.16 is revised to read as follows:
    
    
    Sec. 192.16  Customer notification.
    
    * * * * *
        (b) * * *
        (5) The operator (if applicable), plumbing contractors, and heating 
    contractors can assist in locating, inspecting, and repairing the 
    customer's buried piping.
    * * * * *
        3. Paragraph (b)(2) of Sec. 192.107 is revised to read as follows:
    
    
    Sec. 192.107  Yield strength (S) for steel pipe.
    
    * * * * *
        (b) * * *
        (2) If the pipe is not tensile tested as provided in paragraph 
    (b)(1) of this section, 24,000 p.s.i.
        4. Paragraph (c)(5) of Sec. 192.614 is revised to read as follows:
    
    
    Sec. 192.614  Damage prevention program.
    
    * * * * *
        (c) * * *
        (5) Provide for temporary marking of buried pipelines in the area 
    of excavation activity before the activity begins, except in emergency 
    situations.
    * * * * *
        5. Appendix A of part 192 is amended by revising paragraphs II. C 
    (1), (2), (9) and (10), II. E (1) and II. F (1) to read as follows:
    
    Appendix A To Part 192--Incorporated by Reference
    
        II. Documents incorporated by reference. (Numbers in parentheses 
    indicate applicable editions.)
    * * * * *
        C. * * *
        (1) ASTM Designation: A 53 ``Standard Specification for Pipe, 
    Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless'' 
    (A53-96).
        (2) ASTM Designation A 106 ``Standard Specification for Seamless 
    Carbon Steel Pipe for High-Temperature Service'' (A106-95).
    * * * * *
        (9) ASTM Designation D638 ``Standard Test Method for Tensile 
    Properties of Plastics'' (D638-96).
        (10) ASTM Designation D2513 ``Standard Specification for 
    Thermoplastic Gas Pressure Pipe, Tubing and Fittings'' (D2513-96a).
    * * * * *
        E. * * *
        (1) MSS SP44-96 ``Steel Pipe Line Flanges'' (includes 1996 
    errata) (1996).
    * * * * *
        F. * * *
        (1) NFPA 30 ``Flammable and Combustible Liquids Code'' (1996).
    * * * * *
    
    PART 193--[AMENDED]
    
        1. The authority citation for Part 193 continues to read as 
    follows:
    
        Authority: 49 U.S.C. 5103, 60102, 60103, 60104, 60108, 60109, 
    60110, 60113, 60118; and 49 CFR 1.53
    
        2. Paragraph (d)(1)(i) of Sec. 193.2059 is revised to read as 
    follows:
    
    
    Sec. 193.2059  Flammable vapor-gas dispersion protection.
    
    * * * * *
        (d) * * *
        (1) * * *
        (i) The rate of vaporization is not less than the sum of flash 
    vaporization and vaporization from boiling by heat transfer from 
    contact surfaces during the time necessary for spill detection, 
    instrument response, and automatic shutdown by the emergency shutdown 
    system, but not less than 10 minutes, plus, in the case of impounding 
    systems for LNG storage tanks with side or bottom penetrations, the 
    time necessary for the liquid level in the tank to reach the level of 
    the penetration or equilibrate with the liquid impounded assuming 
    failure of the internal shutoff valve.
    * * * * *
        3. Appendix A to Part 193 is amended by revising paragraphs 
    II.E(1), II.G(1), to read as follows:
    
    Appendix A To Part 193--Incorporation By Reference
    
    * * * * *
        II. Documents Incorporated by Reference. (Numbers in Parentheses 
    Indicate Applicable Editions.)
    * * * * *
        E. * * *
        1. ASME/ANSI B31.3 ``Process Piping'' (1996)--Includes 1996 
    Addenda.
    * * * * *
        G. * * *
        1. NFPA 30 ``Flammable and Combustible Liquids Code'' (1996)
    * * * * *
    
    PART 195--[AMENDED]
    
        1. The authority citation for Part 195 continues to read as 
    follows:
    
        Authority: 49 U.S.C. 5103, 60102, 60104, 60108, 60109, 60118; 
    and 49 CFR 1.53.
    
        2. Section 195.3 is amended by revising paragraph (c)(5) (i) and 
    (ii) to read as follows:
    
    
    Sec. 195.3  Matter incorporated by reference.
    
    * * * * *
        (c) * * *
        (5) * * *
        (i) ASTM Designation A 53 ``Standard specification for Pipe, Steel, 
    Black and Hot-Dipped, Zinc-Coated Welded and Seamless'' (A 53-96).
        (ii) ASTM Designation: A 106 ``Standard Specification for Seamless 
    Carbon Steel Pipe for High-Temperature Service'' (A 106-95).
    * * * * *
        3. Paragraph (a) of Sec. 195.56 is revised to read as follows:
    
    
    Sec. 195.56  Filing safety-related condition reports.
    
        (a) Each report of a safety-related condition under Sec. 195.55(a) 
    must be filed (received by the Administrator) in writing within 5 
    working days (not including Saturdays, Sundays, or Federal holidays) 
    after the day a representative of the operator first determines that 
    the condition exists, but not later than 10 working days after the day 
    a representative of the operator discovers the condition. Separate 
    conditions may be described in a single report if they are closely 
    related. To file a report by facsimile (fax), dial (202) 366-7128.
    * * * * *
    
    PART 199--[AMENDED]
    
        1. The authority citation for Part 199 continues to read as 
    follows:
    
        Authority: 46 U.S.C. 5103, 60102, 60103, 60104, 60108, 60109, 
    60118; and 49 CFR 1.53.
    
        2. Paragraph (a) of Sec. 199.17 is revised to read as follows:
    
    
    Sec. 199.17  Retention of samples and retesting.
    
        (a) Samples that yield positive results on confirmation must be 
    retained by the laboratory in properly secured, long-term, frozen 
    storage for at least 365 days as required by the DOT Procedures. Within 
    this 365-day period, the employee or the employee's representative, the 
    operator, the Administrator, or, if the operator is subject to the 
    jurisdiction of a state agency, the state agency may request that the 
    laboratory retain the sample for
    
    [[Page 7724]]
    
    an additional period. If, within the 365-day period, the laboratory has 
    not received a proper written request to retain the sample for a 
    further reasonable period specified in the request, the sample may be 
    discarded following the end of the 365-day period.
    * * * * *
        Issued in Washington, DC on January 27, 1998.
    Kelley S. Coyner,
    Acting Administrator.
    [FR Doc. 98-2898 Filed 2-13-98; 8:45 am]
    BILLING CODE 4910-60-P
    
    
    

Document Information

Effective Date:
5/4/1998
Published:
02/17/1998
Department:
Research and Special Programs Administration
Entry Type:
Rule
Action:
Direct final rule.
Document Number:
98-2898
Dates:
This direct final rule takes effect May 4, 1998. The incorporation by reference of certain publications listed in the rule is approved by the Director of the Federal Register as of May 4, 1998. If RSPA does not receive any adverse comment or notice of intent to file an adverse comment by March 19, 1998 the rule will become effective on the date specified. RSPA will issue a subsequent notice in the Federal Register by April 20, 1998 after the close of the comment period to confirm that fact and ...
Pages:
7721-7724 (4 pages)
Docket Numbers:
Docket No. RSPA-97-2251, Amdt Nos. 190-7, 191-13, 192-83, 193-15, 194- 2, 195-61, 198-3, 199-17.
RINs:
2137-AD03: Pipeline Safety: Periodic Updates to Pipeline Safety Regulations (1997)
RIN Links:
https://www.federalregister.gov/regulations/2137-AD03/pipeline-safety-periodic-updates-to-pipeline-safety-regulations-1997-
PDF File:
98-2898.pdf
CFR: (11)
49 CFR 190.7
49 CFR 190.203
49 CFR 190.209
49 CFR 191.21
49 CFR 192.16
More ...