99-12502. Request for Proposals; Contract Administrators for Project-Based Section 8 Housing Assistance Payments (HAP) Contracts  

  • [Federal Register Volume 64, Number 96 (Wednesday, May 19, 1999)]
    [Notices]
    [Pages 27358-27388]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 99-12502]
    
    
    
    [[Page 27357]]
    
    _______________________________________________________________________
    
    Part II
    
    
    
    
    
    Department of Housing and Urban Development
    
    
    
    
    
    _______________________________________________________________________
    
    
    
    Request for Proposals; Contract Administrators for Project-Based 
    Section 8 Housing Assistance Payments (HAP) Contracts; Notice
    
    Federal Register / Vol. 64, No. 96 / Wednesday, May 19, 1999 / 
    Notices
    
    [[Page 27358]]
    
    
    
    DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT
    
    [Docket No. FR-4511-N-01]
    
    
    Request for Proposals; Contract Administrators for Project-Based 
    Section 8 Housing Assistance Payments (HAP) Contracts
    
    AGENCY: Office of the Assistant Secretary for Housing, HUD.
    
    ACTION: Notice of Request for Proposals.
    
    -----------------------------------------------------------------------
    
    SUMMARY: The Request for Proposals (RFP) provided in this notice was 
    issued by HUD on May 3, 1999, and is also published in the Federal 
    Register to ensure a wider dissemination. Through this RFP, HUD is 
    seeking sources interested in providing contract administration 
    services for project-based Housing Assistance Payment Contracts under 
    Section 8. This solicitation is not a formal procurement within the 
    meaning of the Federal Acquisition Regulations (FAR) but will follow 
    many of those principles. The Request for Proposals follows this 
    Summary.
    
        Dated: May 11, 1999.
    William C. Apgar,
    Assistant Secretary for Housing-Federal Housing Commissioner.
    
    Request for Proposals; Contract Administrators for Project-Based 
    Section 8 Housing Assistance Payments (HAP) Contracts
    
    Contents
    
    1. Introduction
    2. Overview of Contract Administrator's Responsibilities
        2.1  Eligibility for Participation
        2.2  Definition of a Public Housing Agency
        2.3  Instrumentality Entity Eligibility
    3. Statement of Work
        3.1  Overview
        3.1.1  Performance based contracting
        3.1.2  Elements of Core Tasks Descriptions
        3.1.3  HUD Regulations and Requirements
        3.1.4  Core Tasks
        3.2  Management and Occupancy Reviews
        3.3  Rental Adjustments
        3.4  Opt-Out and Contract Termination
        3.5  Monthly Vouchers
        3.6  Health and Safety Issues and Community/Resident Concerns
        3.7  Section 8 Budgets, Requisitions, Revisions and Year-end 
    Statements
        3.8  Contract Administrator's Audit
        3.9  Deficient Annual Financial Statements (AFS)
        3.10  Renewals of Expiring Section 8 Contracts
        3.11  General Reporting Requirements
        3.12  Physical Inspection
    4. Contract Administrator Fee
        4.1  Terms
        4.2  Evaluation of CA Performance
        4.3  Basic Fee
        4.4  Incentive Fee
        4.5  Fee Payment
        4.5.1  Payment of basic fee
        4.5.2  Payment of incentive fee
        4.6  Availability of Funds
        4.7  Use of Fee Income
        4.8  Performance Requirements Summary
    5. Guidance for Submitting Proposals
        5.1  Service Area Designation
        5.2  Proposal Organization
        5.3  Proposal Due Date
        5.4  Offeror Questions/Pre-Proposal Conference
        5.5  Amendments and Additional Guidance
        5.6  Contract Term
    6. Equal Employment Opportunity Compliance
    7. Factors for Award
        7.1  Understanding and Technical Approach--50 Points
        7.1.1  Data systems
        7.2  Management Capacity and Quality Control Plan--50 Points
        7.3  Past Performance--30 Points
    8. Proposal Evaluation
    
    Attachments
    
    Attachment I  Voucher and Recertification Review
    Attachment II  Proposal Submission Form
    Attachment III  Annual Contributions Contract
    
    1. Introduction
    
        This is the Department of Housing and Urban Development's (HUD) 
    Request For Proposals (RFP) to provide contract administration services 
    for project-based Housing Assistance Payments (HAP) Contracts under 
    Section 8 of the United States Housing Act of 1937 (42 U.S.C. 1437f) 
    (Section 8). Of the approximately 24,200 project-based Section 8 HAP 
    Contracts in effect, Public Housing Agencies (PHAs) currently 
    administer approximately 4,200. These PHAs will generally continue to 
    administer these HAP Contracts until expiration. HUD administers the 
    balance of approximately 20,000. This RFP covers contract 
    administration for most of these HUD administered contracts.
        When HUD renews the expired project-based HAP Contracts that PHAs 
    currently administer, HUD generally expects to transfer contract 
    administration of the renewed HAP Contracts to the Contract 
    Administrator (CA) it selects through this RFP for the service area 
    where the property is located. This RFP does not apply to contract 
    administration of Section 8 projects assisted under the Section 8 
    moderate rehabilitation program (including the Section 8 moderate 
    rehabilitation single room occupancy program) or the Section 8 project-
    based certificate program, or to contract administration of Section 9 
    projects to be assisted under the Section 8 project-based voucher 
    program.
        The successful offerors under this RFP will oversee HAP Contracts, 
    in accordance with HUD regulations and requirements. The CAs 
    responsibilities will be governed by an Annual Contributions Contract 
    (ACC) entered into with HUD (Attachment III). After execution of the 
    ACC, the CA will subsequently assume or enter into HAP Contracts with 
    the owners of the Section 8 properties. The Contract Administrator will 
    monitor and enforce the compliance of each property owner with the 
    terms of the HAP Contract and HUD regulations and requirements.
        Proposals in response to this RFP may cover an area no smaller than 
    an individual State (or U.S. Territory). Proposals may cover one or 
    more HUD Multifamily Hubs or one or more States (or U.S. Territory). 
    Geographic Service Area Jurisdiction (Attachment II) describes the 
    jurisdictions of the Multifamily Hubs. HUD encourages proposals through 
    joint ventures and other public/private partnerships between public 
    housing agencies and other private or non-profit entities.
        Under the approximately 20,000 Section 8 HAP Contracts this RFP 
    covers, HUD pays billions of dollars annually to owners on behalf of 
    eligible property residents. HUD seeks to improve its performance of 
    the management and operations of this function through this RFP.
        Specifically, HUD seeks through this solicitation to achieve three 
    programmatic and three administrative objectives.
    
    Programmatic Objectives
    
         Calculate and pay Section 8 rental subsidies correctly.
         Administer project-based Section 8 HAP Contracts 
    consistently.
         Enforce owner obligations to provide decent housing for 
    eligible families.
    
    Administrative Objectives
    
         Execute ACCs only with entities that have the 
    qualifications and expertise necessary to oversee and manage affordable 
    housing and that have the capacity to perform the required services 
    with requisite personnel and other resources.
         Get the best value for dollars spent for CA services.
         Encourage the development of joint ventures and/or 
    partnerships for contract administration services to obtain the benefit 
    of the best practices of both public and private sectors.
    
    [[Page 27359]]
    
    2. Overview of Contract Administrator's Responsibilities
    
        Contract Administrators must administer Section 8 HAP Contracts in 
    accordance with the ACC, Federal law, and HUD regulations and 
    requirements, both current and as amended in the future. The ACC with 
    the CA will specify the area where the CA is required to provide 
    contract administration services (service area). The ACC will specify 
    the Section 8 assisted units under HAP Contracts that HUD assigns to 
    the Contract Administrator for servicing (covered units). From time to 
    time during the term of the ACC, HUD may add or delete covered units 
    for contract administration under the ACC. Some units may be assigned 
    to Participating Administrative Entities (PAE) by the Office of 
    Multifamily Housing Assistance Restructuring (OMHAR) for contract 
    administration. On an annual basis, the CA will request funds from the 
    HUD Financial Management Center (FMC) to cover the Section 8 funds to 
    be disbursed to owners for eligible units under the HAP Contract.
        Under this RFP, the offerors will competitively bid to perform 
    contract administration services for properties with project-based 
    Section 8 HAP Contracts. A list of the projects which may be assigned 
    under this RFP is located at www.hud.gov/fha/mfh/rfp/sec8rfp.html.
        The Statement of Work details core functions (tasks) that the 
    Contract Administrator must perform.
        The major tasks of the Contract Administrator under the ACC and 
    this RFP include, but are not limited to:
         Monitor project owners' compliance with their obligation 
    to provide decent, safe, and sanitary housing to assisted residents.
         Pay property owners accurately and timely.
         Submit required documents accurately and timely to HUD (or 
    a HUD designated agent).
         Comply with HUD regulations and requirements, both current 
    and as amended in the future, governing administration of Section 8 HAP 
    contracts.
    
    2.1  Eligibility for Participation
    
        By law, HUD may only enter into an ACC with a legal entity that 
    qualifies as a ``public housing agency'' (PHA) as defined in the United 
    States Housing Act of 1937 (42 U.S.C. 1437 et seq.). However, that does 
    not preclude joint ventures or other partnerships between a PHA and 
    other public or private entities to carry out the PHA's contract 
    administration responsibilities under the ACC between the PHA and HUD.
        Under the law, a public housing agency is defined as a:
    
        ``* * * State, county, municipality, or other governmental 
    entity or public body (or agency or instrumentality thereof) which 
    is authorized to engage in or assist in the development or operation 
    of low-income housing.'' (42 U.S.C. 1437a(b)(6)).
    
    2.2  Definition of a Public Housing Agency
    
        To qualify as a PHA that may enter into a Section 8 ACC with HUD, 
    the legal entity must be one of the following:
        A general or special purpose governmental entity: Such governmental 
    entities include a State, municipality, housing authority, or 
    governmental public benefit corporation.
        A multi-state, interstate or regional governmental entity.
        An instrumentality entity: Such instrumentality entity must act as 
    an instrumentality of a parent governmental entity, or multiple parent 
    governmental entities. The instrumentality entity may be a for-profit 
    or not-for-profit entity.
        HUD may require the submission of legal opinions and organizational 
    documents needed to determine whether an entity qualifies as a PHA.
        In addition, the PHA and any related entity must obtain clearance 
    under HUD Previous Participation procedures (see Form HUD-2530) prior 
    to execution of the ACC.
    
    2.3  Instrumentality Entity Eligibility
    
        An instrumentality entity may be an entity that already exists when 
    the offeror submits a proposal to HUD under this RFP, or a legal entity 
    specially formed subsequent to proposal submission, and prior to 
    execution of the ACC between the entity and HUD, to carry out contract 
    administration under the ACC.
        To qualify as an ``instrumentality entity'', the relationship 
    between an instrumentality entity and a governmental entity (``parent 
    entity'') must include all of the following characteristics:
         The parent entity must have the right to approve the 
    corporate charter or other organic documents of the instrumentality 
    entity, including the right to approve any amendments.
         The parent entity must have the right to control, direct 
    and authorize the execution of the ACC between HUD and the 
    instrumentality entity.
         The parent entity must have the right to directly or 
    indirectly control operation of the instrumentality entity.
         The parent entity must have the right that upon 
    dissolution or termination of the instrumentality entity, title to all 
    real or personal property held by the instrumentality entity must be 
    transferred to the parent entity or an entity designated by the parent 
    entity.
        Before execution of the ACC with an instrumentality entity, HUD 
    will, upon submission of appropriate documentation as required by HUD, 
    determine whether the private instrumentality entity has been properly 
    established, possesses the required power and jurisdiction to carry out 
    contract administration in the service area, and qualifies as an 
    instrumentality entity as described above.
        The charter or other organic documents of the instrumentality 
    entity (e.g., certificate of incorporation, partnership agreement or 
    certificate) must provide that the instrumentality entity is authorized 
    to ``engage in or assist in the development or operation of low-income 
    housing.''
        Governmental parent entities may partner with private for-profit or 
    non-profit entities that hold an interest, directly or indirectly, in 
    an instrumentality entity so long as such instrumentality entity is 
    otherwise in compliance with the above stated requirements for 
    eligibility of an instrumentality entity. Private entities may contract 
    directly with an instrumentality entity.
        As stated in the evaluation criteria, a proposal for contract 
    administration by an instrumentality entity under ACC between HUD and 
    such entity shall specify any services or functions to be provided or 
    performed by the parent entity, or by any other entity which holds a 
    direct or indirect interest in such instrumentality, to carry out or 
    support Section 8 contract administration in accordance with the ACC 
    and this RFP. If the proposal is accepted, such parent or other entity 
    shall enter into a contract with the instrumentality entity, prior to 
    execution of the ACC, that specifies all such services or functions, 
    and the contract shall obligate the parent entity to provide such 
    services or functions. Such contract shall specify that HUD is a third-
    party beneficiary of such contract and shall be executed by the parent 
    and instrumentality entities and be in the form and substance approved 
    by HUD.
    
    [[Page 27360]]
    
    3. Statement of Work
    
    3.1  Overview
    
    3.1.1  Performance Based Contracting
        For work performed under ACCs awarded in response to this RFP, HUD 
    will use Performance-Based Service Contracting (PBSC). PBSC is based on 
    the development of a performance work statement, which defines the work 
    in measurable, mission-related terms with established performance 
    standards and review methods to ensure quality assurance. PBSC assigns 
    incentives to reward performance that exceeds the minimally acceptable 
    and assesses penalties for unsatisfactory performance.
        The CA must complete all tasks described in this section of the 
    RFP, including both ``Requirements'' and ``Incentive Based Performance 
    Standards.'' Failure to complete the tasks will result in default of 
    the terms and conditions of the ACC. HUD may terminate the ACC at any 
    time in whole or in part if HUD determines that the CA has committed 
    any default under the ACC.
        The specified tasks outlined will provide the offeror with the 
    necessary information to complete the Submission of Proposal Form 
    (Attachment II).
    3.1.2  Elements of Core Tasks Descriptions
        The description of each core task contains the following elements:
        Outcome: The required result of the task.
        Requirements: A general description of specific tasks the CA must 
    perform.
    
        Note: CAs must perform each task in accordance with all relevant 
    HUD regulations and requirements in effect during the term of the 
    ACC. The RFP does not set forth the details of such regulations and 
    requirements.
    
        Reference: Current HUD regulations and other HUD requirements 
    related to each task.
        Incentive Based Performance Standards: A description of specific 
    elements of each core task. HUD will measure the CA's performance of 
    each such element as the performance standard to determine the CA's 
    earned Administrative and Incentive Fees.
        Quality Assurance: A listing of the methods and resources HUD will 
    use to verify the accuracy of CA's reported performance and 
    accomplishments. HUD may use other methods that it deems appropriate to 
    assure quality.
    3.1.3  HUD Regulations and Requirements
        All references mentioned in the tasks may be obtained through HUD's 
    website (http://www.hudclips.org/cgi/index.cgi.) from which interested 
    parties may obtain HUD handbooks and other directives or through the 
    HUD Multifamily Clearinghouse at 1-800-685-8470. It should be noted 
    that the regulations and directives listed are the current instructions 
    and requirements and may be updated from time to time.
        HUD does not represent that the references listed in the RFP or on 
    the HUD website are a complete listing of current relevant HUD 
    regulations and requirements. In addition, HUD regulations and other 
    requirements may change from time to time during the term of the ACC.
        HUD's codified regulations are issued as Title 24 of the Code of 
    Federal Regulations (CFR). Revisions or additions to HUD regulations 
    are initially published in the Federal Register. HUD may also publish 
    Federal Register notices. In addition to publication in the Federal 
    Register and the CFR, HUD issues additional program requirements as HUD 
    ``directives'', including HUD notices, handbooks and forms.
        The CA will be required to carry out the tasks described in this 
    Section, as well as other responsibilities related to contract 
    administration under the ACC, in accordance with all HUD regulations 
    and requirements in effect from time to time, as well as other 
    responsibilities related to contract administration under the ACC.
    3.1.4  Core Tasks
        The RFP describes eleven core tasks that the CA must perform:
        1. Conduct management and occupancy reviews.
        2. Adjust contract rents.
        3. Process HAP contract terminations or expirations.
        4. Pay monthly vouchers from Section 8 owners.
        5. Respond to health and safety issues.
        6. Submit Section 8 budgets, requisitions, revisions and year-end 
    statements.
        7. Submit audits of the CA's financial condition.
        8. Monitor owners progress in addressing Annual Financial Statement 
    deficiencies.
        9. Renew HAP contracts.
        10. Report on CA operating plans and progress.
        11. Follow up on results of physical inspections of Section 8 
    projects.
    3.2  Management and Occupancy Reviews
        The CA must conduct an on-site management and occupancy review of 
    each Section 8 property, no less than annually. (Some properties may 
    have multiple HAP contracts.) The review must be a comprehensive 
    assessment of the owner's procedures for directing and overseeing 
    project operations, and the adequacy of the procedures for carrying out 
    day to day, front line activities. Some examples of the areas that the 
    CA must audit are: maintenance, security, leasing, occupancy, 
    certification and recertification of family income, and determination 
    of the family payments, financial management, Management Improvement 
    and Operating (MIO) Plans, and general maintenance practices. The 
    results of the on-site review must provide adequate documentation to 
    support any enforcement actions proposed against the owner by the CA or 
    HUD.
        Outcome: Identify and resolve areas of noncompliance with HUD 
    regulations and other requirements.
    
    Requirements
    
         Schedule and conduct annual reviews of each property, 
    using form HUD-9834 or other appropriate documentation.
         Evaluate the owner's operating policies and procedures 
    following guidance in the appropriate HUD directives.
         Verify compliance with HUD regulations and requirements 
    regarding occupancy issues (e.g., resident eligibility and selection, 
    examination and reexamination of family income and assets, household 
    characteristics) and verify that correct documentation is contained in 
    each resident file to support claims for payment under the HAP 
    contract. Use the following resident file random sampling:
    
    ------------------------------------------------------------------------
                Number of units                    Minimum file sample
    ------------------------------------------------------------------------
    100 or fewer...........................  5 files plus 1 for each 10
                                              units over 50.
    101-600................................  10 files plus 1 for each 50
                                              units or part of 50 over 100.
    601-2000...............................  20 files plus 1 for each 100
                                              units or part of 100 over 600.
    Over 2,000.............................  34 files plus 1 for each 200
                                              units or part of 200 over
                                              2,200.
    ------------------------------------------------------------------------
    
         If the CA's review of the sample indicates a problem, the 
    CA must require the owner/agent to conduct a 100% review of the files 
    and report the results of the review to the CA. The CA will test the 
    review done by the owner/agent to determine its reliability and 
    accuracy.
         Verify owner compliance with civil rights regulations, 
    including Title VI, Title VIII, the Americans with Disabilities Act, 
    and Section 504 of the Rehabilitation Act of 1973.
    
    [[Page 27361]]
    
         Notify the jurisdictional HUD office by close of next 
    business day of any potential fraud or potential violations of law 
    identified during the reviews.
         Prepare and submit to the owner/agent and jurisdictional 
    HUD office a written report, on form HUD-9834, or other appropriate 
    HUD-required documents, within 30 days of review, outlining any 
    findings and recommendations for corrective action.
         Monitor implementation of corrective action. Notify 
    jurisdictional HUD office within one business day when enforcement 
    action is required.
         Enter required information into HUD data systems.
    
    References
    
    HUD Handbook 4350.1
    HUD Handbook 4350.3
    
    Incentive Based Performance Standards
    
        1. The CA must conduct annual Management and Occupancy Reviews in 
    accordance with the CA submitted and HUD approved workplan according to 
    HUD requirements, document corrective actions taken against Section 8 
    owners or families, and monitor implementation of necessary corrective 
    action.
        2. CA's review must document on the appropriate form Section 8 
    owner compliance with civil rights regulations, including Title VI, 
    Title VIII, the Americans with Disabilities Act, and Section 504 of the 
    Rehabilitation Act of 1973 and forward to the owner and the appropriate 
    jurisdictional HUD office within 30 days.
    
    Quality Assurance
    
    On-Site Reviews
    Data Systems Reports
    3.3  Rental Adjustments
        Contract rent under each Section 8 HAP contract must be adjusted 
    during the HAP contract term in accordance with the HAP contract and 
    HUD requirements.
        The CA must process rent adjustments correctly.
        Outcome: Contract rent adjustments are timely and correct.
        Requirements:
    
    A. Budget Based Adjustments
    
        Where applicable, the budget based rent adjustment method requires 
    owners to submit an operating budget and supporting documentation for 
    CA review.
        The CA will determine budget based adjustments for contract rent by 
    performing the following tasks:
         Analyze the property's operating budget and supporting 
    documentation for a rent adjustment to determine reasonableness 
    according to guidance in HUD Handbook 4350.1.
         Document rent increases on a Rent Schedule (Form HUD-
    92458)
         Analyze adjustments of the owner utility allowance 
    schedule if applicable.
         Analyze adjustment to the monthly Reserve for Replacement 
    deposit as required and recommend action to HUD.
         Approve/disapprove rent adjustment and provide owners 
    written notification.
         Verify accurate, timely completion and submission of 
    adjusted rent schedule by owners.
         Enter data into the appropriate HUD data system within 
    five business days from completion of action.
    
    B. Annual Adjustment Factor (AAF)/Operating Cost Adjustment Factor 
    (OCAF)
    
        This rent adjustment method requires the CA to apply the AAF/OCAF 
    to current contract rents to determine which rents are eligible for an 
    adjustment. AAF's are published annually in the Federal Register and 
    OCAF's are published annually in a Housing Notice. Refer to the current 
    Notice on the HUD Homepage.
        The CA will perform the following tasks:
         Determine the amount annual adjustments in accordance with 
    HUD requirements.
         Analyze adjustments of the owner utility allowance 
    schedule if applicable.
         Analyze adjustment to the monthly Reserve for Replacement 
    Account, if applicable pursuant to the HAP contract and recommend 
    action to HUD.
         Approve/disapprove the amount of rent adjustment and 
    provide owners written notification.
         Validate comparability study if submitted by owners to 
    support rent adjustment request.
         Verify accurate, timely completion and submission of 
    adjusted rent schedule by owners.
         Enter data into the appropriate HUD system within five 
    business days from completion of action.
    
    C. Special Adjustments
    
        For those HAP Contracts with AAF adjusted rents, owners may request 
    special increases in costs for generally applicable increases items 
    such as insurance, taxes and utilities. The appropriate jurisdictional 
    HUD office must approve or deny all special adjustments within 30 days 
    of receipt of properly documented request from CA.
        The CA will process the owner's request for a special rent 
    adjustments to determine if the special adjustment should be granted. 
    To accomplish this the CA will perform the following tasks:
         Analyze owners' requests.
         Recommend action to the appropriate jurisdictional HUD 
    office.
         Based on notification from HUD, notify the owner of rent 
    adjustment approval or disapproval.
         Verify accurate, timely completion and submission of 
    adjusted rent schedule by owners.
         Enter data into the appropriate HUD data system within 5 
    business days from completion of action.
    
    D. Rent Appeals
    
        Owners may appeal rent adjustment decisions. The first level of 
    appeal is to the CA; the second level of appeal is to the appropriate 
    jurisdictional HUD office. CA will review appeals.
        The CA will perform the following tasks:
    
    First Level Appeal
    
         Analyze owner's rent appeal requests.
         Provide owner with written notification of decision and 
    justification within 30 days of receipt.
        If appeal is approved:
         Verify accurate, timely completion and submission of 
    adjusted rent schedule by owners.
         Enter data into the appropriate HUD data system within 5 
    business days from completion of action.
        If appeal is denied:
         Notify owner of Second Appeal rights within 30 days of 
    receipt.
    
    Second Level Appeal
    
        If appeal is approved by HUD:
         Receive approval from jurisdictional HUD office within 30 
    days after request for second level appeal.
         Verify accurate, timely completion and submission of 
    adjusted rent schedule by owners.
         Enter data into the appropriate HUD data system.
    
    References
    
        HUD Handbook 4350.1
        Notice: H-98-34
        Notice: H-98-3
        Notice: H-98-27
    
    Incentive Based Performance Standards
    
        3. CA completes processing of owner's request for rent adjustments 
    and all CA approved rent adjustments are executed and finalized within 
    30 days of receipt of owner's request for a budget-based rent 
    adjustment or on the anniversary date of the HAP contract for an AAF-
    based rent adjustment.
    
    Quality Assurance
    
    On-Site Reviews
    
    [[Page 27362]]
    
    Data Systems Reports
    3.4  Opt-Out and Contract Termination
        Section 8 Contracts may terminate because:
         An owner may choose not to renew an expiring Section 8 
    contract (opt-out); and
         The contract may be terminated by the CA ( with HUD 
    approval).
        When Section 8 contracts will be terminated, the CA must work with 
    HUD to obtain tenant-based rental assistance for eligible residents by 
    notifying the appropriate HUD contact. The CA will coordinate efforts 
    with the jurisdictional HUD office to identify a PHA to administer the 
    tenant-based assistance.
        Outcome: Provide ongoing rental assistance to eligible residents in 
    occupancy at the time of the opt-out
    
    Requirements
    
    A. Notification Requirements
    
         Inform jurisdictional HUD office by close of next business 
    day of notice by owner, that the owner has elected to opt-out of the 
    program.
         Inform jurisdictional HUD office of recommendation to 
    terminate contracts for cause/default under HAP Contract provisions by 
    the close of the next business day.
         Verify owner has complied with HAP and current law on Opt-
    outs.
    
    B. CA Must Take the Following Actions When Contracts are Terminated
    
         Obtain resident payment/unit size data from owners of 
    properties.
         Provide resident/unit data to jurisdictional HUD office 
    within 3 business days of receipt from the owner for purpose of 
    obtaining Section 8 vouchers for residents.
         Coordinate efforts with the jurisdictional HUD to identify 
    a local PHA to administer tenant-based assistance and reserve funds to 
    cover such vouchers.
         Assist residents who must be relocated.
    
    References
    
    Notice: H-98-34
    
    Incentive Based Performance Standards
    
        4. CA notifies jurisdictional HUD office, by close of next business 
    day of notice by owner, that the owner has elected to opt-out.
        5. CA provides complete resident data to jurisdictional HUD office 
    90 days prior to contract expiration.
    
    Quality Assurance
    
    On-Site Reviews
    Data Systems Reports
    3.5  Monthly Vouchers
        In Section 108 of 24 CFR, Part 208-Electronic Transmission of 
    Required Data for Certification and Recertification and Subsidy Billing 
    Procedures for Multifamily Subsidized Projects (a/k/a the Automation 
    Rule) requires property owners to request HAP payments monthly through 
    the Tenant Rental Assistance Certification System (TRACS). Vouchers are 
    due the 10th day of the month preceding the month for which the owner 
    is requesting payment. CAs may not pay owners until vouchers are 
    received and reviewed for accuracy. The Voucher and Recertification 
    Review (Attachment 1) lists the tasks and tools associated with review 
    of vouchers and certifications/ recertifications.
        Outcome: Payments of Section 8 vouchers and claims are only 
    authorized on eligible units. Payments are made to owners by the first 
    day of every month.
        Requirements:
    
    A. Verify accuracy of monthly Section 8 vouchers (forms HUD-52670 & 
    HUD-52670-A)
    
        The CA must verify and provide written documentation of the 
    accuracy of payment requests by the last day of each month before the 
    CA issues payments for the verified request. To accomplish this task, 
    the CA must:
         Monitor owners follow-up efforts on discrepancies 
    identified as a result of any income matching initiatives. HUD will 
    provide discrepancy reports to the CAs.
         Monitor owner's compliance with entry of all resident 
    certification and recertification data in TRACS.
         Verify voucher submissions by owner through TRACS system 
    by the 10th day of the month preceding the month for which the owner is 
    requesting payment.
         Verify through TRACS that the amount of HAP paid on behalf 
    of each resident is accurate.
         Verify that all recertifications are completed by the 
    owner agent in a timely manner and entered into TRACS.
         Verify that payment request does not include any units 
    where Section 8 assistance has been abated.
         Analyze adjustments required to prior month's vouchers to 
    determine accuracy and validity.
         Determine if authorized rent or utility allowance 
    adjustments have been implemented timely and accurately.
         Verify pre-approval of Section 8 Special Claims (see item 
    B).
         Notify the owner, in writing, of any corrections required 
    and track corrections.
         Verify that project owners are complying with current HUD 
    rules and regulations.
    
    B. Verify and Authorize Payment Only on Valid Section 8 Special Claims 
    for Unpaid Rent, Resident Damages and Vacancy Loss
    
        Property owners may claim reimbursement from the CA for unpaid 
    rent, resident damages, and vacancy losses on eligible units. The 
    claims must be pre-approved by the CA before being submitted with the 
    monthly voucher.
         Analyze, verify and approve/disapprove claims using 
    information in handbooks, regulations, Notices, TRACS and information 
    provided by the owner.
         Enter data into monitoring program using a HUD compatible 
    spreadsheet program.
         Approve/disapprove claims, execute forms and return to 
    owner for their submission with next voucher.
    
    C. Disbursement of Section 8 Funds to Owners
    
        Disburse payments to owners through electronic fund transfer (EFT) 
    transaction no earlier than the first of the month or no later than the 
    first business day of the month after approval of Section 8 voucher 
    (see item A)
        Reference:
    
    HUD Handbook 4350.3
    
    Incentive Based Performance Standards
    
        6. CA must promptly review each monthly voucher submitted by an 
    owner, and agree with or modify it, so the monthly payment to the owner 
    is sent no earlier than the first of the month or no later than the 
    first business day of the month.
        7. On a monthly basis CAs will provide written formal notification 
    of corrective actions including income verification that results in 
    overpayment to owners within 10 days of CA's verifying and certifying 
    of the vouchers, discrepancies to owners and monitor for adequate 
    resolution. Resolution must be completed within 30 days.
    
    Quality Assurance
    
    On-Site Reviews
    Data Systems Reports
    3.6 Health and Safety Issues and Community/Resident Concerns
        CA must accept resident complaints and follow-up with owners to 
    ensure that owners take appropriate action.
        Outcome: Resolved health and safety issues and positive outgoing 
    community/resident relations and communications.
        Requirements:
    
    [[Page 27363]]
    
    A. Respond to Life Threatening Health and Safety Issues
    
         Respond to all life threatening health and safety issues 
    immediately.
         Maintain tracking system for inquiries, responses and 
    corrective actions and submit log to jurisdictional HUD office with 
    monthly invoices.
         Notify owner of all concerns and determine appropriate 
    corrective action.
         Monitor owner's response to concerns and implementation of 
    corrective actions.
    
    B. Respond to All Non-Life Threatening Health and Safety and Community/
    Resident Concerns
    
         Respond to all non-life threatening health and safety 
    issues within 2 business days of notification during normal business 
    hours.
         Maintain tracking system for community/resident inquiries, 
    responses and corrective actions and submit log to jurisdictional HUD 
    office with monthly invoices.
         Notify owner of all concerns and determine appropriate 
    corrective action.
         Monitor owner's response to concerns and implementation of 
    corrective actions.
        References:
    
    HUD Handbook 4381.5 REV-2
    
    Incentive Based Performance Standards
    
        8. Respond, document and notify owner of life-threatening health 
    and safety issues, inquiries/complaints immediately within an hour or 
    prior to close of business day (whichever is sooner).
        9. CA documents their initiatives and actions taken to notify the 
    owner of non-life threatening health and safety issues inquiries/
    complaints and responds to residents within two business days of 
    notification. CA continues to provide follow-up to residents on actions 
    taken every two weeks until final resolution is reached. Documentation 
    of all action is recorded.
    
    Quality Assurance
    
    On-Site Reviews
    Monthly Invoice
    3.7 Section 8 Budgets, Requisitions, Revisions and Year-end Statements
        To receive monthly ACC payments, Section 8 budgets and requisitions 
    (and revisions as required) must be submitted for each HAP contract at 
    least 90 days before the beginning of the fiscal year. Also to receive 
    monthly ACC payments, Year-end settlement statements must be prepared 
    and submitted at least 45 days prior to the beginning of the CA fiscal 
    year.
        Outcome: CA submits financial documents to HUD accurately and 
    timely.
        Requirements:
         Prepare and submit annually to HUD (FMC) Section 8 budget 
    (HUD Forms 52672 and 52673) at least 90 days prior to the beginning of 
    the CA fiscal year.
         Prepare and submit annually to HUD (FMC) Annual 
    Requisition for Partial Payment of Annual Contributions (HUD Form 
    52663) 90 days prior to the beginning of the CA fiscal year.
         Perform monthly comparison of HAP payments to owners and 
    monthly ACC partial payments from HUD.
         Prepare and submit to HUD (FMC) revised Budget and 
    Requisition (HUD Form 52663) when/if monthly comparison indicates ACC 
    payments will exceed HAP payments by more than 5%. CAs must complete 
    submissions by their Fiscal Year End date.
         Prepare and submit to the FMC Year-end Settlement 
    Statement (HUD Form 52681) within 45 days of the year end.
        Reference:
    
    HUD Handbook 7420.7, Chapter 8
    
    Incentive Based Performance Standards
    
        10. CAs must submit to the FMC, acceptable and accurate Budget and 
    Annual Requisition for each HAP contract 90 days prior to the beginning 
    of CA's FY. Where monthly reviews of HAP payments to owners and ACC 
    payments received from HUD indicate that the CA will be overpaid by 
    more than 5%, the CA must submit a revised Budget and Annual 
    Requisitions to reduce future payments accordingly. The Revisions 
    (revised Budget and Requisition) must be submitted no later than the 
    1st day of the month following identification of overpayment.
        11. CAs must submit to the FMC, the year-end statement within 45 
    days of the end of the CA's fiscal year.
    
    Quality Assurance
    
    Monthly Invoice
    FMC Status Report
    3.8  Contract Administrator's Audit
        CA is required to maintain complete and accurate financial records 
    covering the CA's contract administration of covered units under the 
    ACC.
        Outcome: Contract Administrator's records are complete and 
    accurate.
        Requirements:
         Records concerning contract administration under the ACC 
    must be distinct and separate from all other business of the CA.
         Maintain complete and accurate records regarding 
    activities relating to each HAP contract for covered units.
         CAs required to submit separate audited financial 
    statements under OMB's Circular A-133 shall:
         Provide the FMC with annual financial audit of the CA's 
    activities the earlier of 30 days after receipt of the auditors report 
    or 9 months after the CA's fiscal year end (FYE) (in accordance with 
    OMB Circular A-133). This audit must be performed by an independent 
    public accountant (IPA).
         The Contract Administrator shall submit audited annual 
    financial statements that fully comply with the requirements of OMB 
    Circular A-133 within the earlier of 30 days after receipt of the 
    auditor's report(s) or nine months after the end of the audit period. 
    However, in cases where a Contract Administrator submits its audited 
    financial statements more than 60 days after the end of its fiscal 
    year, the CA shall submit all financial reports required by the HUD in 
    unaudited form within 60 days after the end of its fiscal year.
         Submission of financial information shall also be in 
    accordance with the requirements of HUD's Uniform Financial Reporting 
    Standards (24 CFR, Part 5, Subpart H). The audit shall be performed by 
    an independent auditor, procured using the standards set forth in 
    Circular A-133 and other referenced documents in Circular A-133.
         In accordance with the ACC, CAs not required to submit 
    separate audited financial statements under OMB's Circular A-133 shall: 
    Submit annual unaudited financial statements within 60 days of the end 
    of the CA's fiscal year. For-Profit instrumentality entities shall 
    submit audited financial statements within 60 days of the end of the 
    CAs fiscal year.
         In the event of audit findings that require corrective 
    actions, the CA shall provide HUD with a proposed plan of corrective 
    actions as part of the audit submission package. By the first day of 
    each month, the CA shall provide HUD with a status report of corrective 
    actions being implemented until all actions are completed. Corrective 
    actions must proceed as rapidly as possible. Failure to provide the 
    required audited financial information and/or timely implementation of 
    corrective actions may result in default of the terms and conditions of 
    the ACC.
        Reference:
    
    ACC contract
    HUD Handbook 7420.7
    OMB Circular A-133
    
    [[Page 27364]]
    
    Incentive Based Performance Standards
    
        12. The CAs that are required to comply with OMB's Circular A-133 
    will provide HUD with unaudited financial statements, including 
    supplemental data, within 60 days after the CA's FYE and audited 
    financial statements no later than 9 months after the CA's FYE. CAs 
    that are not required to comply with OMB's Circular A-133 will submit 
    annual unaudited financial statements to HUD within 60 days of the end 
    of the CA's fiscal year. For-Profit instrumentality entities shall 
    submit audited financial statements to HUD within 60 days of the end of 
    the CAs fiscal year.
    
    Quality Assurance
    
    100% Review of the Audit
    3.9  Deficient Annual Financial Statements (AFS)
        HUD regulations require owners of properties with project-based 
    Section 8 contracts to submit Annual Financial Statements to the Real 
    Estate Assessment Center (REAC) when required by the HAP contract.
        Outcome: Financial condition of projects is verified.
        Requirements: Where REAC's assessment of AFS reflects unacceptable 
    performance and compliance indicators, owners must develop a plan 
    outlining specific actions to correct deficiencies.
        CAs must:
         Track the owners' deficiencies and their progress along 
    their plan until resolved.
         Submit monthly reports by the first day of each month that 
    indicate the owners' progress and activities in the previous month.
         Submit a final report to HUD within 30 days of owners' 
    resolution of deficiencies.
    
    Reference
    
    HUD Handbook 2000.04 REV-1
    OMB Circular A-133
    Federal Register, September 1, 1998
    
    Incentive Based Performance Standards
    
        13. CA provides HUD with documentation by the first day of each 
    month that indicates the owners' progress and activities in the 
    previous month.
        14. CA monitors the unacceptable performance and compliance 
    indicators. CA provides documentation to HUD within 30 days of 
    resolution.
    
    Quality Assurance
    
    On-Site Reviews
    Data Systems Reviews
    3.10  Renewals of Expiring Section 8 Contracts
        As HAP contracts come to an end, owners must apply for contract 
    renewals to have units remain with Section 8 project-based assistance. 
    CAs must ensure that owners fulfill their obligations to residents and 
    HUD that are commensurate with owner renewal decisions.
        Outcome: Expiring Section 8 contracts are renewed
        Requirements:
         Verify that owners provide the required one-year notice to 
    residents of properties with expiring Section 8 contracts.
         Monitor owner actions with regard to providing a minimum 
    of 90 days notice to CA of intent to renew or not renew the expiring 
    contract, according to current Housing Notices.
         If the owner opts not to renew, take the actions described 
    in Task 3.4.
         Maintain copies of owner's notification to residents of 
    expiring contracts.
         If the owner chooses to renew, determine which option 
    (form of renewal) the owner wishes to use and notify the jurisdictional 
    HUD office.
         Prepare HAP renewal contracts.
         After receipt of confirmation of funding for renewal from 
    HUD, ensure the HAP contract is executed (signed) by the owner and the 
    CA.
         Execute and distribute copies of the HAP within one 
    business week to the owner, jurisdictional HUD office, and CA files.
    
    Reference
    
    Notice: H-98-34
    
    Incentive Based Performance Standards
    
        15. Monitor, process and execute HAP contract documents.
    
    Quality Assurance
    
    On-Site Reviews
    Data Systems Reports
    Monthly Invoice
    3.11  General Reporting Requirements
        To track the performance of the Section 8 program, monitor and 
    evaluate CA performance, and identify technical assistance needs, HUD 
    requires the CA to regularly report its activities. Consequently, the 
    CA shall provide to jurisdictional HUD offices Monthly, Quarterly, and 
    Annual reports.
        Outcome: HUD can monitor and evaluate program and CA performance 
    from CAs accurate, timely reports.
    
    A. Monthly Reports
    
        CAs must submit reports and an invoice to the Government Technical 
    Representative, or Monitor (GTR/GTM) by the 10th business day of each 
    month for the previous month's activities.
         Hot topics--Projects that required special attention due 
    to such matters as, abatement actions, excessive resident complaints, 
    inquiries from governmental officials or general public.
         Work Plan Status Report that details:
        Number of areas reviewed and services performed, including date of 
    review and services; name/s of CA staff performing the review and 
    performing the services.
         Any significant administrative actions that could affect 
    the contract.
         Quality control activities and results
         Major accomplishments, success stories, etc.
         Noteworthy meetings
         Pending issues
    
    B. Quarterly Reports
    
        CAs must submit Work Plan (updated) and status reports to the 
    designated GTR/GTM.
    
    C. Annual Reports
    
        By the close of each contract year, CAs must submit to HUD a report 
    that details its progress against the Work Plan for that year. The 
    report should detail all of the CA actions and services with dates, 
    locations, and employee name for that calendar year. Also at the close 
    of the contract year, CAs must submit a Work Plan for the following 
    year that details its plan to satisfy the ACC's servicing requirements.
    
    Incentive Based Performance Standards
    
        16. HUD receives CA's (a) Monthly Reports by the 10th business day 
    following the end of the month; (b) Quarterly reports by the 10th 
    business day following the end of the quarter; (c) Annual reports by 
    the 20th business day following the end of the CA's contract year.
    
    Quality Assurance
    
    On-Site Reviews
    Data Systems Reports
    Review of submitted reports
    3.12  Physical Inspection
        The Department is conducting a baseline physical inspection for 
    every Section 8 property with a HUD-administered HAP contract. The Real 
    Estate Assessment Center's (``REAC'') physical inspection software and 
    protocol is being used for all inspections (See http://www.hud.gov/
    reac/reaphyin.html). Once this baseline is completed, HUD will 
    determine frequency of future inspections. HUD
    
    [[Page 27365]]
    
    may issue a task order under the ACC to have the CA perform physical 
    inspections. If such a task order is issued, HUD will negotiate with 
    the CA a fixed-price fee for such services at that time.
        Outcome: Verify completion of corrective actions based upon the 
    analysis of the results of the physical inspections conducted on 
    properties included in the ACC. Take legal actions as directed by HUD 
    for enforcement of the HAP contract.
        Requirements:
    
    Post Inspection Activities
    
         Provide follow-up with owner on violations and corrective 
    actions needed.
         Provide owner with time-frame to correct violations.
         Work with owner to eliminate the deficiencies.
         Abate payments when owner fails to correct violations 
    within designated time period.
         Notify jurisdictional HUD office of abatement of payments 
    and specific reasons for the action.
         Notify jurisdictional HUD office of the completion of 
    required actions.
         Take legal action as directed by HUD for enforcement of 
    the HAP contract.
    
    Reference
    
    HUD Handbook 4350.1
    Federal Register, September 1, 1998
    
    Incentive Based Performance Standards
    
        17. CA monitors the unacceptable performance and compliance 
    indicators. CA continues to provide follow-up to HUD on actions taken 
    every 30 days until final resolution is reached.
    
    4. Contract Administrator Fee
    
    4.1  Terms
        Administrative fee. The monthly fee HUD pays the PHA for each 
    covered unit under HAP contract on the first day of the month. The 
    administrative fee is the total of the basic fee plus the incentive 
    fee. The fee amount is detailed in the ACC.
        Basic fee. The basic fee is the agreed fee per unit per month. HUD 
    pays the basic fee to the CA for each covered unit under HAP contract 
    as of the first day of the month during the ACC term. There is a 
    separate basic fee amount for each FMR area in the CA service area. The 
    ACC will state the agreed basic fee amount for each FMR area.
        HUD pays the basic fee for performance of tasks described in the 
    Statement of Work and in accordance with the CA's annual workplan. Such 
    performance is indicated by monthly invoices (and validated through 
    HUD's quality assurance). The total amount of the basic fee will vary 
    each month depending on the total number of eligible units to which it 
    will be applied each month. Of that total, HUD has allocated each task 
    to be performed a certain percentage of the total fee available. The 
    Performance Requirements Summary (PRS) (see Section 4.8) states the 
    basic fee amounts for all portions of the CA service area.
        Incentive fee. An additional fee beyond the basic fee that the CA 
    may earn. As reflected in the PRS, HUD will pay an additional payment 
    to the CA for performance on specified Statement of Work tasks that 
    exceeds HUD acceptable quality level for the IBPS associated with that 
    task (see PRS, Section 4.8). HUD will pay up to a maximum 25% of the 
    total incentive fee pool at the end of each quarter. Each task which 
    has an incentive applied to it also identified the percentage of the 
    incentive fee pool that applies to that task. The amount of the 
    incentive fee payable to the CA is determined by HUD, based on HUD's 
    evaluation of the CA's performance in administration of covered units. 
    The amount of the incentive fee per unit per month may not exceed the 
    maximum incentive fee stated in the ACC.
        Disincentive. Deductions levied against the basic fee for 
    performance that falls below the acceptable quality level. The ACC 
    states the disincentive for each Statement of Work task. The PRS 
    (Section 4.8) specifies the penalty for each IBPS task as a percentage 
    of the basic fee amount.
        Earned basic fee. The basic fee amount per unit per month for each 
    IBPS task minus all applicable disincentive fees for any such IBPS 
    task.
    4.2  Evaluation of CA Performance
        During the ACC term, HUD will conduct a monthly evaluation and 
    rating of the CA's performance in contract administration of the 
    covered units, and shall issue a performance rating based on such 
    performance. As described below, payment of the fees is based on the 
    HUD rating of the CA's performance.
        HUD determines the amount of the earned basic fee for each CA per 
    unit month by review of data submitted in the monthly invoice. HUD 
    determines the amount of the incentive fee earned by the CA per unit 
    per month by quarterly scoring of the CA's contract administration 
    performance during the ACC term. The monthly review and quarterly 
    scoring is based on the CA's performance of the task categories used as 
    incentive based performance standards (IBPS), as described in the 
    Statement of Work of this RFP. Monthly, HUD rates the CA's performance 
    in completion of the IBPS to determine the earned basic fee by 
    calculating a ``percentage completed'' for each IBPS task. In a similar 
    manner, quarterly HUD rates the CA's performance in completing IBPS 
    task to determine the earned incentive fee.
    4.3  Basic Fee
        In submitting their proposals, offerors are advised that, during 
    the term of the ACC, the basic fee per unit month for each FMR area in 
    the CA service area shall not exceed two (2) percent of the local two 
    bedroom existing HUD Fair Market Rents (FMR) published in the Federal 
    Register on October 1, 1998 (and effective the same date) and any 
    revisions to such FMRs published in the Federal Register prior to award 
    of the ACC. The entire national listing of the FMRs is located at 
    http://www.hud.gov/local/atl/atl42322.html.
        For your information, we have provided a table that lists by state, 
    the total number of units by applicable FMRs. You may find this table 
    with an explanation at http://www.hud.gov/fha/mfh/rfp/sec8rfp.html.
        In responding to the RFP, the offeror's proposal must specify the 
    proposed basic fee per unit per month (for the initial two year term 
    and for each of three one year renewal terms. See Proposal Submission 
    Form (Attachment II). If the offer is accepted, the ACC with the CA 
    will specify the agreed basic fee amount during the ACC term. The fee 
    will simply be stated as a percentage of the FMR as described above. 
    The amount of fee proposed will be included in the evaluations for 
    acceptability and to determine the price proposed reflects the proposed 
    technical approach. The CA shall also submit supporting cost data as 
    shown on the attachments.
        As an example, if the FMR for a covered unit was $400 and the CA 
    had proposed a price of 1.7%, then the basic fee for each covered unit 
    would be $6.80. If the CA had an inventory of 10,000 covered units as 
    of the 1st of the month, then the total basic fee available for that 
    month would be $68,000. Since the PRS indicates that 5% of the fee will 
    be applied to IPBS # 1, then $3,400 would be allocated to IPBS #1. The 
    CA's performance of IPBS # 1 is evaluated as described to determine if 
    the CA is due the full amount of the basic fee for the month.
    4.4  Incentive Fee
        In addition to the basic fee, the CA may earn an incentive fee 
    awarded by HUD for CA performance of the contract administration 
    services for designated
    
    [[Page 27366]]
    
    IBPS items that exceeds acceptable quality levels of performance. 
    Determination of the amount of the incentive fee payment is specified 
    in the PRS (Section 4.8).
        The maximum incentive fee per covered unit per month HUD will 
    evaluate the CA's performance in providing contract administration 
    services for all covered units under the ACC for earned incentive fee 
    quarterly. This evaluation will determine the portion of the incentive 
    fee that the CA has earned for that quarter. As an example, if the FMR 
    for a covered unit is $400, then 1% would be $4. If a CA had 10,000 
    covered units as of the 1st of the month, then the total incentive pool 
    would be $40,000 for that month. Due to changes in the number of 
    covered units, the subsequent two months may have provided $38,000 and 
    $41,000, which would result in a total of $119,000 for the quarterly 
    incentive pool. If one IPBS item was to cover 25% of the pool, then up 
    to $29,750 in incentive fees could be earned for that specific IBPS 
    factor.
        HUD may add or modify performance standards during the ACC term, 
    may add or modify the factors used to measure performance, and may 
    specify the amount of the incentive fee for a specified level of 
    performance. However, HUD must notify the CA of any such changes before 
    the rating period for which such changes are used to rate CA 
    performance.
    4.5  Fee Payment
        Each month, the CA shall determine the number of eligible units 
    that were being managed as of the 1st day of the month. The CA shall 
    then apply the accepted basic fee percentage to the covered number of 
    units to establish the total available basic fee and the 1% to 
    determine the amount of the incentive fee pool for that month.
    4.5.1  Payment of Basic Fee
        For tasks that are indicated as being paid annually, the CA shall 
    apply the percentage of the IPBS factor to that monthly payment and 
    deduct that from the total available fee. The CA shall then determine 
    their compliance with the acceptable quality levels established in the 
    ACC for tasks to be paid monthly and apply any appropriate reductions 
    to the available fee. The CA must invoice HUD by the 5th day of each 
    month for the amount of the basic fee earned for the month. For tasks 
    for which annual payments of ongoing basic fees apply, the monthly 
    amounts will be pooled into a total amount available for application of 
    the AQL and the CA must invoice HUD by the 5th day of the 12th month of 
    the ACC performance period. Each invoice shall be fully supported by 
    documentation of the CA's achievements relating to the required AQL of 
    each IPBS factor. In the event that subsequent HUD quality assurance 
    reviews determine the CA did not meet the AQL established, HUD may 
    adjust the payments of subsequent invoices to reflect the amounts that 
    should have been withheld.
        Notwithstanding the reductions in the fee for failing to meet the 
    AQL, failure to complete the tasks may result in default of the CA for 
    failing to comply with the terms and conditions of the ACC. HUD may 
    terminate the ACC at any time in whole or in part if HUD determines 
    that CA has committed any default under the ACC.
    4.5.2  Payment of Incentive Fee
        HUD will pay the incentive fee on a quarterly basis. HUD will base 
    the amount of the incentive fee on the CA's performance against the 
    Incentive Based Performance Standards listed in the Statement of Work.
        HUD will review the CA's performance relative to its annual work 
    plan and progress reported in the monthly invoices for the applicable 
    quarter. The HUD findings will be compared to the CA invoice for the 
    incentive fee and adjustments may be made to reflect the results of the 
    HUD findings.
    4.6  Availability of Funds
        The award of the ACC and subsequent performance periods as well as 
    all fee payments are subject to the availability of appropriated funds 
    on an annual basis.
    4.7  Use of Fee Income
        The CA may use or distribute payments for the monthly on-going 
    administrative fee that they earn under the ACC for any purpose apart 
    from the use of these fees to reimburse, compensate or transfer any 
    fees to the owners or management agents (or their affiliates) of the 
    projects being serviced by the CA. HUD may reduce or request 
    reimbursement of administrative fees paid if subsequent quality 
    assurance indicates the performance indicated by the CA was not 
    attained.
    4.8  Performance Requirements Summary
        Each task of the Statement of Work has at least one IBPS standard 
    associated with it. These IBPS are central to the determination of 
    earned basic and incentive fees.
        The table below details for each performance standard:
         The IBPS number.
         The task and SOW requirement to which the IBPS applies.
         The acceptable quality level.
         The percentage of the basic fee that applies to the 
    standard.
         Any applicable incentive fee and it method of calculation.
         Any applicable disincentive and its method of calculation.
         The method that HUD will use to assure the quality of the 
    CA's reported performance.
         The frequency of payments for the basic fee.
        The information in the table below will govern HUD's payment of CAs 
    for all work performed under the ACC.
    
    BILLING CODE 4210-27-P
    
    [[Page 27367]]
    
    [GRAPHIC] [TIFF OMITTED] TN19MY99.000
    
    
    
    [[Page 27368]]
    
    [GRAPHIC] [TIFF OMITTED] TN19MY99.001
    
    
    
    [[Page 27369]]
    
    [GRAPHIC] [TIFF OMITTED] TN19MY99.002
    
    
    
    BILLING CODE 4210-27-C
    
    [[Page 27370]]
    
    5. Guidance for Submitting Proposals
    
    5.1  Service Area Designation
        Proposals in response to this solicitation must clearly designate 
    the intended service area. Offerors must bid to provide contract 
    administration services for areas no smaller than an individual State 
    (or U.S. Territory). HUD will accept proposals covering the entire 
    nation, multiple Multifamily Hubs, individual Multifamily Hubs, or any 
    combination of states, but no smaller than an individual State (or U.S. 
    Territory). All multi-state proposals must provide a separate cost 
    proposal for each state within the proposed service area (see 
    Attachment II.B). HUD will evaluate proposals for areas larger than an 
    individual State on a state by state basis.
        The information in this section governs the procedures Offerors 
    must follow to submit proposals in response to this RFP. Failure to 
    comply with the guidance of this section will disqualify an Offeror's 
    proposal from consideration by HUD.
    5.2  Proposal Organization
        Offerors must submit one original and three (3) copies of their 
    proposals. All proposals must contain two volumes: a technical proposal 
    that explains the offeror's technical capacity to perform the tasks of 
    the RFP and a cost proposal that indicates the offeror's price and 
    supporting documents to provide CA services. Submit technical and cost 
    proposals as separately bound volumes. Offerors must divide and tab 
    technical proposal into three sections, limited by the specified number 
    of pages:
    
    1. Understanding and Technical Approach--20 pages
    2. Management Capacity and Quality Control--20 pages
    3. Past Performance--10 pages (Total)
        (a) Key Personnel--5 pages
        (b) Firm--5 pages
    
        Proposals exceeding the allowable page limits will only have the 
    number of pages specified evaluated (e.g. Factor 1 will only have the 
    first 20 pages evaluated; remaining pages will not be reviewed). Page 
    limits refer to one side of an 8\1/2\ x 11 piece of paper using 
    standard 10 pitch font.
        Offerors shall include with the technical proposal an appendix 
    which includes the following:
        (1) Resumes of the project team.
        (2) A statement of possible conflict of interest in the appendix. 
    This statement should identify properties in the proposed coverage area 
    of the offeror in which the offeror has a financial interest.
        (3) A copy of the offerors' (the PHA and all organizations that 
    form the instrumentality entity) most recent audit of the offeror's 
    financial records. The appendix does not count toward the page 
    limitation.
        Offerors are advised that different technical evaluation panel 
    teams will review proposals. The Technical proposal shall be divided 
    according to the stated evaluation factors and shall be submitted in 
    physically distinct sections by each evaluation factor. Individual 
    panel members may review only one evaluation factor; therefore, 
    offerors should be careful to fully respond to each factor separately, 
    and not rely on information in another factor to be a part of the 
    response. Pages with each factor shall be numbered consecutively, 
    including any appendixes.
        The cost proposal shall include the CA's proposed percentage of the 
    FMR for covered units on the sheet provided herein. The cost proposal 
    shall also provide supporting cost data to ensure the evaluation panel 
    can determine the prices proposed are reasonable for the technical 
    approach proposed. Failure to adequately explain the price proposed may 
    result in a determination the CA is unable to perform at the stated 
    price or that the price is unreasonable based upon the technical 
    approach described. Sample forms for providing cost data are attached 
    and should be supported by a narrative to the extent necessary. 
    Offerors are not required to follow the samples completely, but shall 
    provide the information requested to the extent possible.
    5.3  Proposal Due Date
        Offerors must submit proposals no later than 5:00 PM EDT, Friday, 
    July 15, 1999. Offerors must submit proposals to: U.S. Department of 
    Housing and Urban Development, 451 7th Street, SW, Office of the Deputy 
    Assistant Secretary for Multifamily Housing Programs, Room 6106, 
    Washington, DC 20410.
        Offerors must clearly mark packages containing proposals ``Proposal 
    for Section 8 Contract Administration Services.''
        The Department will not accept proposals that arrive after the 
    above date and time or at any other address. HUD will not be 
    responsible for proposals lost or misdirected due to improper labeling.
    5.4  Offeror Questions/Pre-Proposal Conference
        HUD will conduct a Pre-Proposal Conference to discuss this request 
    for proposals at length and answer questions. The agenda for the 
    conference will include time for those potential respondents' 
    interested in forming partnerships with other entities to meet.
        Date: June 3, 1999.
        Time: 9:30 a.m. to 3:00 p.m. EDT.
        Location: To Be Announced at http://www.hud.gov/fha/mfh/rfp/
    sec8rfp.html.
        HUD encourages potential Offerors who plan to attend the Pre-
    Proposal Conference to submit questions in advance, by sending an e-
    mail to ``Prebiddersconf__Sec8rfp@hud.gov''. All questions and the 
    responses will be posted at the RFP website, www.hud.gov/fha/mfh/rfp/
    sec8rfp.html. At the Pre-Proposal Conference HUD will be sure to 
    discuss the questions that have generated the most interest.
        If attendees raise additional questions as a result of the 
    discussion at the pre-proposal conference, HUD will respond to the 
    questions at the conference as time permits. However, if time has 
    expired and/or if HUD must obtain additional information to provide an 
    appropriate response, HUD will post a transcript of the conference and 
    the answers to any unanswered questions at the RFP website.
        In addition to a copy of the transcript, the RFP web site currently 
    contains a database of current properties with Section 8 assisted units 
    and a description of the Section 8 program. After the conference, the 
    RFP website will provide a tool for offerors to pose and for HUD to 
    answer any further questions.
    5.5  Amendments and Additional Guidance
        HUD may amend this RFP. All amendments or additional guidance will 
    be posted on the website. Offerors should check the website regularly 
    for any amendments to the RFP.
    5.6  Contract Term
        HUD will award an ACC pursuant to this RFP for an initial term of 
    two (2) years. The CA is reminded however, that continued performance 
    beyond the first year of the ACC is contingent upon the availability of 
    appropriated funds.
        HUD may unilaterally renew the ACC for up to three (3) additional 
    one-year terms. Each such renewal shall be at HUD's sole discretion. 
    The Department will use performance as a paramount factor in renewal 
    determinations.
    
    6. Equal Employment Opportunity Compliance
    
        The CA shall not discriminate against any employee or applicant for 
    employment because of race, color,
    
    [[Page 27371]]
    
    creed, religion, sex, handicap or national origin. The CA shall take 
    affirmative action to ensure that applicants and employees are treated 
    without regard to race, color, creed, religion, sex, handicap, or 
    national origin. Such action shall include, but not be limited to, the 
    following: employment, upgrading, demotion, or transfer; recruitment or 
    recruitment advertising; layoff or termination; rates of pay or other 
    forms of compensation; and selection for training, including 
    apprenticeship.
        The CA shall post in conspicuous places, available to employees and 
    applicants for employment, notices to be provided by HUD setting forth 
    the provisions of this nondiscrimination clause. The CA shall assure in 
    all solicitations or advertisements for employees placed by or on 
    behalf of the CA that all qualified applicants will receive 
    consideration for employment without regard to race, color, creed, 
    religion, sex, handicap or national origin. The CA will incorporate the 
    foregoing requirements of this paragraph in all of its contracts for 
    project work, except contracts for standard commercial supplies or raw 
    materials, and will require all of its contractors for such work to 
    incorporate such requirements in all subcontracts for project work.
    
    7. Factors for Award
    
        Proposals cannot merely offer to provide services in accordance 
    with the requirements of the RFP, rather, they must provide a detailed 
    and concrete description of how the offeror will perform these 
    requirements in operation under the ACC.
        HUD will evaluate proposals according to the following:
    7.1  Understanding and Technical Approach--50 Points
        Offeror's proposal must include a demonstrated understanding of the 
    role of the CA and the full range of the work to be performed. The 
    proposal also must describe the Offeror's plan and approach to perform 
    the tasks of the statement of work. The proposal shall specify any 
    services or functions to be provided or performed by the parent entity, 
    or by any other entity which holds a direct or indirect interest in 
    such instrumentality, to carry out or support Section 8 contract 
    administration in accordance with the ACC. The proposal should detail 
    the Offeror's automated systems that will support it in the performance 
    of SOW tasks (including information technology (IT) support, 
    accessibility, documentation, security, and flexibility). In addition, 
    the offeror must describe the automated system that it will use to 
    provide contract administration services for project-based HAP 
    contracts under Section 8.
        The proposal must provide a proposed plan for the transfer of 
    responsibility for contract administration from HUD to the CA that 
    includes, but need not be limited to, how the offeror will be prepared 
    to begin operations within 60 calendar days after award of the ACC.
    7.1.1  Data Systems
        Offerors must demonstrate their ability to comply with all 
    processing and reporting requirements applicable to CA functions 
    contained in this RFP, including requirements for contract 
    administrators outlined in Section 108 of 24 CFR, Part 208)--Electronic 
    Transmission of Required Data for Certification and Recertification and 
    Subsidy Billing Procedures for Multifamily Subsidized Projects (a/k/a 
    the Automation Rule). CAs are expected to have Internet Service 
    Provider access for communication with HUD. (At this time, HUD plans 
    for most data entry and data transfer with CAs to occur over the 
    Internet).
        CAs must be capable of implementing revisions in processing and 
    reporting, as specified by HUD, to conform to changes in present or 
    future policy and procedures pertaining to CA functions. With respect 
    to data systems and automated reporting requirements, HUD will provide 
    reasonable advance notice of the need for such change a minimum of 90 
    days before CA compliance will be required.
        CAs must provide HUD with data on HAP contracts, rent adjustments, 
    contract renewal processing, management and occupancy reviews, annual 
    financial statements and other documents and information relevant to 
    the tasks and responsibilities outlined in this RFP. Where automated 
    reporting tools do not already exist, HUD intends to develop 
    specifications for receiving a substantial portion of these data 
    electronically. CAs must have the capability to transmit such data to 
    HUD via the Internet as prescribed by HUD.
        Offerors must demonstrate that they have the facilities to receive 
    resident certification and recertification data (form HUD 50059) and 
    voucher data (form HUD 52670) electronically from the owners or 
    management agents in a form consistent with reporting requirements 
    specified by HUD for the HUD TRACS System. Offerors must also 
    demonstrate the ability to transmit HUD 50059 data to the HUD TRACS 
    Tenant System and HUD 52670 data to the HUD TRACS Voucher/Payment 
    System, and to receive the messages transmitted in return from TRACS. 
    As part of these requirements, the CA must have an ability, acceptable 
    to HUD, for communicating errors in HUD 50059 and HUD 52670 submissions 
    to the owners or management agents. CAs are expected to comply with 
    requirements applicable to contract administrators in the Automation 
    Rule (24 CFR 208).
        HUD currently receives data submissions to the TRACS Tenant System 
    and the TRACS Voucher/Payment System via SprintMail, but there are 
    plans to accept these transmissions via the Internet. Internet access 
    also provides the CA with the ability to review the resident and 
    voucher data it has transmitted to HUD to ensure that it is correct and 
    consistent with the data maintained in its own files.
        CAs will be required to accept and forward to the owners or 
    management agents the Benefit History Reports from HUD that provide 
    confirmation of Social Security and Supplemental Security Income. 
    Alternatively, the CAs may require the owners or management agents to 
    obtain Internet access to retrieve their own Benefit History Reports 
    from HUD.
        Resident reporting requirements specified for HUD's TRACS Tenant 
    System and voucher reporting requirements specified for the TRACS 
    Voucher/Payment System are published on the TRACS Documents Page on the 
    world wide web. The CAs are responsible for meeting the requirements 
    specified in these documents. Offerors can access the TRACS Documents 
    Page at http://www.hud.gov/fha/mfh/trx/html/trxdocs.html.
        Offerors must demonstrate that they have an account with a 
    federally insured financial institution capable of receiving and 
    sending electronic fund transfer (EFT) transactions.
        CAs must have facilities acceptable to HUD for making timely and 
    accurate HAP subsidy payments to project owners with HAP contracts 
    under an Annual Contributions Contract (ACC) contract. CAs also will be 
    required to transmit budget, requisition, and year-end settlement data 
    to HUD via the Internet, as specified by HUD.
    7.2  Management Capacity and Quality Control Plan--50 points
        The offeror shall fully demonstrate a superior detailed quality 
    control program to (1) ensure the contract performance requirements are 
    met, (2) provide specific internal control programs to provide 
    accountability and
    
    [[Page 27372]]
    
    separation of duties to detect and prevent potential fraud, waste, and 
    abuse of funds, and (3) identify processes/procedures to prevent, 
    detect, and resolve actual, or appearances of, conflicts of interest of 
    any staff working with the contract or associated with the entity. This 
    QC Plan must include, but not be limited to
        1. A Work Plan including all contract administrative services 
    breaking down each task/sub-task. The Work Plan shall:
    
    --Specify all areas and services that the CA will review.
    --Include a timeline (duration, start, finish) the CA will review 
    areas/services.
    --Depict the resource name/s and task usage for each task/s.
    --Include an example of the CA's Work Plan quarterly report Identify 
    the methodology CAs will use to conduct reviews.
    
        2. The name(s) and qualifications of the individual(s) responsible 
    for performing the quality control reviews and the specific areas/
    services these individuals will inspect.
        3. A method to identify performance deficiencies and to take 
    corrective action to ensure against unsatisfactory performance.
        4. A means to document all quality control reviews and any required 
    corrective action. The CA shall establish and maintain files for such 
    documentation through the term of this contract. The filing method 
    shall be such that all information relative to quality control 
    inspections is logically grouped together and readily accessible. The 
    files shall be the property of HUD and be made available to HUD upon 
    demand during the CA's regular business hours. The files shall be 
    turned over to HUD within 10 business days after completion or 
    termination of the ACC.
        5. Workflow and organizational charts that describe the processes 
    and controls that the offeror will to implement and operate its 
    technical approach and to execute the QC plan.
    7.3  Past Performance--30 Points
        Offerors' proposals must provide documented evidence that, during 
    the last two years immediately prior to the deadline for receipt of 
    proposals, the Offeror or related entity has successfully performed 
    duties substantially similar to the core functions that the CA will 
    perform under this RFP. Offerors should give special emphasis to past 
    performance with compliance with and reviews of Multifamily Housing's 
    occupancy requirements, reviews of property physical condition, and 
    problem resolution activities with property owners. (``Related entity'' 
    means any entity that will perform services or functions to carry out 
    or support Section 8 contract administration under the ACC, including 
    the PHA, a parent entity of the PHA, or partners who are affiliated 
    with the PHA.)
        HUD will give greater weight to proposals that cite recent 
    experience (the past two years) that is most similar to the 
    requirements of the RFP.
        The proposal must include sufficient information on the relevant 
    experience, special training and education of proposed personnel 
    related to the tasks of the SOW.
        HUD will allocate points based upon the demonstrated record. 
    References of successful past performance of the same or similar work 
    as described in the SOW and in the ACC shall confirm offerors' 
    demonstrated record. HUD will consider available information, such as 
    reviews of PHAs.
        Offerors' proposals must provide at least five references (not 
    letters of recommendations) that document past experience. These 
    references must include:
    
    Project name
    Period of performance
    Description of the work performed
    Contact person information:
    Name
    Title
    Address
    Telephone numbers
    The relationship of the contact person to the offeror.
    
        Only information that is submitted directly to HUD in the offeror's 
    proposal package will be considered unless HUD seeks additional 
    information during the evaluation process.
        HUD reserves the right to review and consider the past performance 
    the offeror may have had with the Department.
    
    8. Proposal Evaluation
    
        HUD will establish one or more panels to review the proposals 
    received. HUD will only evaluate, rate and rank complete proposals 
    submitted.
        HUD will evaluate each proposal based on the factors for award and 
    the proposed fees to determine which offerors represent the best 
    overall value, including administrative efficiency, to the Department. 
    While the cost or price factor has no numerical weight in the factors 
    for award, it is always a criterion in the overall evaluation of 
    proposals. HUD may ask any offeror considered to be among the highest 
    rated technically acceptable for additional information to assist HUD 
    in selecting among proposals submitted. HUD may also negotiate the fee 
    with the highest technically acceptable offerors, one or all, to obtain 
    high quality at a better value.
        HUD shall have discretion to determine the process for evaluation, 
    rating and ranking of proposals received and for selection of the 
    contract administrator pursuant to the RFP and for award of ACCs.
        Proposals to provide contract administration services for project-
    based HAP contracts will be accepted on an individual state, 
    combination of states, individual Hubs, multiple Multifamily Hubs, and 
    the entire nation, however, the Department will evaluate proposals 
    state by state. Therefore, the offeror must complete and submit the 
    ``Proposal Submission Form'' (Attachment II) for each state the CA is 
    offering a bid.
        If there are areas of the country for which HUD does not select a 
    CA during the above process, either because there were no proposals 
    covering that area, or none of the proposals were acceptable, HUD may 
    negotiate with one or more selected offerors to expand the service area 
    in which the selected offeror will provide contract administration 
    services.
        Before execution of the ACC, each selected PHA must submit a 
    Previous Participation Certification, Form HUD-2530 and any additional 
    documentation required by HUD within 10 calendar days of request by 
    HUD. The PHA and related parties must be cleared through HUD's previous 
    participation procedure.
    
    BILLING CODE 4210-27-P
    
    [[Page 27373]]
    
    [GRAPHIC] [TIFF OMITTED] TN19MY99.003
    
    
    
    [[Page 27374]]
    
    [GRAPHIC] [TIFF OMITTED] TN19MY99.004
    
    
    
    [[Page 27375]]
    
    [GRAPHIC] [TIFF OMITTED] TN19MY99.005
    
    
    
    [[Page 27376]]
    
    [GRAPHIC] [TIFF OMITTED] TN19MY99.006
    
    
    
    [[Page 27377]]
    
    [GRAPHIC] [TIFF OMITTED] TN19MY99.007
    
    
    
    [[Page 27378]]
    
    [GRAPHIC] [TIFF OMITTED] TN19MY99.008
    
    
    
    BILLING CODE 4210-27-C
    
    [[Page 27379]]
    
    Attachment III  Annual Contributions Contract
    
    Annual Contributions Contract
    
    Definitions
        ACC. Annual Contributions Contract. This contract between HUD and 
    the PHA.
        Administrative Fee. The monthly fee HUD pays the PHA for each 
    covered unit under HAP contract on the first day of the month. The fee 
    amount is determined in accordance with Exhibit E. The administrative 
    fee is the total of the basic fee plus the incentive fee.
        Basic Fee. The amount of the basic fee per unit per month as 
    specified in Exhibit E for each FMR area. HUD may reduce the basic fee 
    if HUD determines that the PHA performance of contract tasks is below 
    the minimum acceptable quality level. HUD determines the amount of such 
    reduction. Earned basic fees are paid monthly.
        Budget Authority. The maximum amount of funds available for payment 
    to the PHA for each HAP contract. Budget authority is authorized and 
    appropriated by the Congress. The amount of budget authority for each 
    HAP contract is listed on Exhibit C.
        Covered Units. Section 8 assisted units under HAP contracts 
    assigned to the PHA for contract administration under the ACC. Covered 
    units are listed on Exhibit B.
        Fiscal Year. The PHA fiscal year. Exhibit C states the last month 
    and day of the PHA fiscal year.
        Funding Increment. Each commitment of funding (budget authority) by 
    HUD to the PHA for a HAP contract under the ACC. The funding increments 
    are listed on Exhibit C.
        HAP Contract. A Section 8 Housing Assistance Payments Contract.
        HUD. The United States Department of Housing and Urban Development.
        Incentive Fee. A per unit per month administrative fee in addition 
    to the basic fee. The incentive fee is paid if HUD determines that PHA 
    performance of contract tasks is above the minimum acceptable quality 
    level. HUD determines the amount of the incentive fee. The maximum 
    incentive fee per unit per month is specified in Exhibit E for each FMR 
    area. Earned incentive fees are paid quarterly.
        PHA. Public Housing Agency.
        Portfolio Reengineering. FHA-insured multifamily housing mortgage 
    and housing assistance restructuring of an eligible multifamily 
    project.
        Program Expenditures. Amounts which may be charged against program 
    receipts in accordance with the ACC and HUD requirements.
        Program Property. Program receipts, including funds held by a 
    depository, and PHA rights or interests under a HAP contract for 
    covered units.
        Program Receipts. Amounts paid by HUD to the PHA under the ACC, and 
    any other amounts received by the PHA in connection with administration 
    of the Section 8 program under the ACC.
        Project Reserve. An unfunded account established by HUD for a HAP 
    contract from amounts by which the amount of budget authority available 
    for payment under the HAP contract during the owner's fiscal year 
    exceeds the amount actually approved and paid by HUD. HUD may use this 
    account as the source for additional payments under the program.
        Public Housing Agency. The agency that has entered the ACC with 
    HUD. Such agency is a ``public housing agency'' as defined in Section 3 
    of the United States Housing Act of 1937 (42 U.S.C. 1437a(b)(6)).
        Section 8. Section 8 of the United States Housing Act of 1937 (42 
    U.S.C. 1437f).
        Service Area. The area where the PHA provides contract 
    administration services under the ACC. The PHA service area is 
    described in Exhibit D of the ACC.
    
    ACC
    
    Purpose
        This ACC is a contract between the PHA and HUD. The ACC was awarded 
    by HUD pursuant to a proposal submitted in response to HUD's published 
    Request for Proposals for PHAs to provide contract administration 
    services for units receiving project-based Section 8 housing 
    assistance. (The Request for Proposals was published on May 19, 1999. 
    Under the ACC, the PHA will provide contract administration services 
    for dwelling units in the service area receiving project based 
    assistance under Section 8 of the United States Housing Act of 1937 (42 
    U.S.C. 1437f).
    
    Exhibits. This ACC Includes the Following Exhibits
    
        1. Exhibit A: Request for Proposal
        2. Exhibit B: Covered Units
        3. Exhibit C: Funding
        4. Exhibit D: Service Area
        5. Exhibit E: PHA Administrative Fees
        6. Exhibit F: ACC Contract Term
    
    HUD Revision of ACC Exhibits
    
        1. HUD may amend Exhibit B:
    
    --To add covered units.
    --To withdraw covered units for which the HAP contract has expired or 
    been terminated, or for which assistance payments are abated.
    --To withdraw covered units in connection with portfolio reengineering.
    
        2. HUD may amend Exhibit C:
    
    --To add a funding increment, or
    --To remove a funding increment for which the HAP contract has expired 
    or been terminated, or for which assistance payments are abated.
    --To remove a funding increment in connection with portfolio 
    reengineering.
    
        HUD may amend Exhibit B or Exhibit C of the ACC by giving the PHA 
    written notice of the revised exhibit. The HUD notice constitutes an 
    amendment of the ACC.
    ACC Term
        The ACC term is specified in Exhibit F of the ACC. The PHA shall 
    provide contract administration services for the covered units during 
    the ACC term.
    
    PHA Contract Administration Services
    
    Coverage
        1. The PHA shall enter into or assume HAP contracts with owners of 
    covered units to make assistance payments to the owners of such units 
    during the HAP contract term.
        2. During the ACC term, the PHA shall provide contract 
    administration services for covered units in the service area.
        3. HUD will assign to the PHA existing HAP contracts for covered 
    units. Upon such assignment, the PHA assumes all contractual rights and 
    responsibilities of HUD pursuant to such HAP contracts.
    PHA Services
        1. The PHA shall comply, and shall require owners of covered units 
    to comply, with the United States Housing Act of 1937, applicable 
    Federal statutes and all HUD regulations and other requirements, 
    including any amendments or changes in the law or HUD requirements.
        2. The PHA shall perform all the core tasks specified in the 
    Statement of Work contained in the Request for Proposals in accordance 
    with the law and HUD requirements.
        3. The PHA shall perform services under the ACC in accordance with 
    the HUD-approved proposal submitted in response to the HUD Request for 
    Proposals, and any HUD-approved modifications of the HUD-approved 
    proposal.
        4. The PHA shall require owners to comply with HUD requirements for 
    occupancy of covered units, including requirements governing 
    eligibility for assistance, resident contribution to rent,
    
    [[Page 27380]]
    
    and examinations and reexaminations of family income.
        5. The PHA shall determine the amount of housing assistance 
    payments to owners in accordance with the terms of the HAP contracts 
    and HUD requirements, and shall pay owners the amounts due under such 
    HAP contracts.
        6. The PHA shall require owners to comply with the terms of HAP 
    contracts for covered units, and shall take prompt and vigorous action 
    to enforce the terms of such contracts.
        7. The PHA shall take appropriate action, to HUD's satisfaction or 
    as required or directed by HUD, for enforcement of the PHA's rights 
    under a HAP contract. Such actions include requiring actions by the 
    owner to cure a default, termination, or abatement or other reduction 
    of housing assistance payments, termination of the HAP contract, or 
    recovery of overpayments.
    
    Fees and Payments
    
    HUD Payments
        1. HUD will make payments to the PHA for covered units in 
    accordance with HUD requirements.
        2. For each PHA fiscal year, HUD will pay the PHA the amount 
    approved by HUD to cover:
    
    --Housing assistance payments by the PHA for covered units.
    --PHA fees for contract administration of covered units.
        3. The amount approved for housing assistance payments shall be 
    sufficient to pay owners the amount of housing assistance payments due 
    to the owners under HAP contracts for covered units.
        4. The amount of the HUD payment may be reduced, as determined by 
    HUD, by the amount of program receipts (such as interest income) other 
    than the HUD payment.
    
    Fees
    
        1. HUD may approve administrative fees for either of the following 
    purposes:
    
    --Basic fees.
    --Incentive fees.
    
        2. The monthly administrative fee is composed of the basic fee and 
    the incentive fee. The administrative fee shall be paid (subject to 
    availability of appropriated funds) for each covered unit under HAP 
    contract on the first day of the month.
        3. The amount of the administrative fee shall be determined in 
    accordance with Exhibit E.
        4. For covered units in each FMR area, Exhibit E states the amount 
    of the basic fee and the amount of the maximum incentive fee. Basic 
    fees earned by the PHA shall be paid on the first day of each month. 
    Incentive fees earned by the PHA shall be paid at the end of each 
    quarter.
        5. If HUD determines that the PHA has performed above the minimum 
    acceptable quality level in a quarter, the PHA may award an incentive 
    fee per unit per month in addition to the basic fee. If HUD determines 
    that the PHA has performed below the minimum acceptable quality level 
    in any month, HUD may charge a penalty against the basic fee per unit 
    per month.
        6. HUD will not pay an administrative fee for any covered units for 
    which the HAP contract has expired or been terminated.
        7. If HUD determines that the PHA has failed to comply with any 
    obligations under the ACC, HUD may reduce the amount of any 
    administrative fee.
    
    Limit on Payments for Funding Increment
    
        The total amount of payments for any funding increment over the 
    increment term shall not exceed budget authority for the funding 
    increment.
    
    Reduction of Amount Payable by HUD
    
        1. If HUD determines that the PHA has failed to comply with any 
    obligations under the ACC, HUD may reduce to an amount determined by 
    HUD:
    
    --The amount of the HUD payment for any funding increment.
    --The contract authority or budget authority for any funding increment.
    
        2. HUD shall give the PHA written notice of the reduction.
        3. The HUD notice may include a revision of the funding exhibit 
    (Exhibit C) that reduces the amount of contract authority or budget 
    authority for a funding increment. The notice of a revised funding 
    exhibit, or of revisions to the funding exhibit constitutes an 
    amendment of the ACC.
    
    Project Reserve
    
        HUD may establish and maintain a project reserve account for a HAP 
    contract administered by the PHA under the ACC. The amount in the 
    project reserve is determined by HUD. The project reserve may be used 
    by HUD to pay any portion of the payment approved by HUD for a fiscal 
    year.
    
    Budget and Requisition for Payment
    
        1. For each fiscal year, the PHA shall submit to HUD an estimate of 
    the HUD payments for the program and any supporting data required by 
    HUD. The budget estimate and supporting data shall be submitted at such 
    time and in such form as HUD may require, and are subject to HUD 
    approval and revision.
        2. The PHA shall requisition periodic payments on account of each 
    annual HUD payment. Each requisition shall be in the form prescribed by 
    HUD. Each requisition shall include certification that:
    
    --Housing assistance payments have only been paid in accordance with 
    HAP contracts for covered units, and in accordance with HUD 
    requirements; and
    --Covered units have been inspected by the PHA in accordance with HUD 
    requirements.
    
        3. If HUD determines that payments by HUD to the PHA for a fiscal 
    year exceed the amount of the annual payment approved by HUD in the 
    budget for the fiscal year, the excess shall be applied as determined 
    by HUD. Such applications determined by HUD may include, but are not 
    limited to, application of the excess payment against the amount of the 
    annual payment for a subsequent fiscal year. The PHA shall take any 
    actions required by HUD respecting the excess payment, and shall, upon 
    demand by HUD, promptly remit the excess payment to HUD.
    
    Financial Management
    
    Use of Program Receipts
        1. The PHA shall use program receipts in compliance with the U.S. 
    Housing Act of 1937 and all HUD regulations and other requirements.
        2. Program receipts may only be used to pay program expenditures, 
    including administrative fees payable to the PHA, and housing 
    assistance payments for covered units. The PHA shall not make any 
    program expenditures, except in accordance with the HUD-approved budget 
    estimate and supporting data.
        3. The PHA may use or distribute any earned administrative fee 
    income, including basic fees and incentive fees, for any purpose. 
    However, the PHA may not use or distribute administrative fee income to 
    reimburse compensate or transfer any such income, directly or 
    indirectly, to the owner of covered units, agents or affiliates.
        4. If required by HUD, program receipts in excess of current needs 
    shall be promptly remitted to HUD or shall be invested in accordance 
    with HUD requirements.
        5. Interest on the investment of program receipts constitutes 
    program receipts.
    Depository
        1. Unless otherwise required or permitted by HUD, all program 
    receipts shall be promptly deposited with a financial institution 
    selected as
    
    [[Page 27381]]
    
    depository by the PHA in accordance with HUD requirements.
        2. The PHA shall enter an agreement with the depository institution 
    in the form required by HUD.
        3. The PHA may only withdraw deposited program receipts for use in 
    connection with the program in accordance with HUD requirements, 
    including payment of housing assistance payments to owners and payment 
    of ongoing administrative fees to the PHA.
        4. The agreement with the depository institution shall provide that 
    if required under a written notice from HUD to the depository:
    
    --The depository shall not permit any withdrawal of deposited funds by 
    the PHA unless withdrawals by the PHA are expressly authorized by 
    written notice from HUD to the depository.
    --The depository shall permit withdrawals of deposited funds by HUD.
    
        5. If approved by HUD, the PHA may deposit under the depository 
    agreement monies received or held by the PHA in connection with any 
    contract between the PHA and HUD.
    
    Fidelity Bond Coverage
    
        The PHA shall carry adequate fidelity bond coverage, as required by 
    HUD, to compensate the PHA and HUD for any theft, fraud or other loss 
    of program property resulting from action or non-action by PHA officers 
    or employees or other individuals with administrative functions or 
    responsibility for contract administration under the ACC.
    
    Management Requirements
    
        1. The PHA shall (without any compensation or reimbursement in 
    addition to ongoing administrative fees in accordance with Sec. IV.B of 
    the ACC) perform all PHA obligations under the ACC, and provide all 
    services, materials, equipment, supplies, facilities and professional 
    and technical personnel, needed to carry out all PHA obligations under 
    the ACC, in accordance with sound management practices, Federal 
    statutes, HUD regulations and requirements and the ACC.
        2. The PHA shall:
    
    --Maintain telephone service during normal and customary business 
    hours;
    --Design and implement procedures and systems sufficient to fulfill all 
    PHA obligations under the ACC.
    --Take necessary actions to maintain good relations with owners, 
    residents and their representatives, neighborhood groups, and local 
    government agencies.
    --Respond fully and promptly to inquiries from assisted residents, and 
    from Congress or other governmental entities.
    
    Program Records
    
        1. The PHA shall maintain complete and accurate accounts and other 
    records related to operations under the ACC. The records shall be 
    maintained in the form and manner required by HUD, including 
    requirements governing computerized or electronic forms of record-
    keeping. The accounts and records shall be maintained in a form and 
    manner that permits a speedy and effective audit.
        2. The PHA shall maintain complete and accurate accounts and 
    records for each HAP contract.
        3. The PHA shall furnish HUD such accounts, records, reports, 
    documents and information at such times, in such form and manner, and 
    accompanied by such supporting data, as required by HUD, including 
    electronic transmission of data as required by HUD.
        4. The PHA shall furnish HUD with such reports and information as 
    may be required by HUD to support HUD data systems.
        5. HUD and the Comptroller General of the United States, or their 
    duly authorized representatives, shall have full and free access to all 
    PHA offices and facilities, and to all accounts and other records of 
    the PHA that are relevant to PHA operations under the ACC, including 
    the right to examine or audit the records and to make copies. The PHA 
    shall provide any information or assistance needed to access the 
    records.
        6. The PHA shall keep accounts and other records for the period 
    required by HUD.
        7. The PHA shall comply with Federal audit requirements. The PHA 
    shall engage an independent public accountant to conduct audits that 
    are required by HUD. The PHA shall cooperate with HUD to promptly 
    resolve all audit findings, including audit findings by the HUD 
    Inspector General or the General Accounting Office.
    
    Default by PHA
    
        Occurrence of any of the following events will constitute a default 
    by the PHA in performance of its obligations under the ACC:
        1. The PHA has failed to comply with PHA obligations under the ACC, 
    or
        2. The PHA has failed to comply with PHA obligations under a HAP 
    contract with an owner, or
        3. The PHA has failed to take appropriate action, to HUD's 
    satisfaction or as required or directed by HUD, for enforcement of the 
    PHA's rights under a HAP contract, or
        4. The PHA has made any misrepresentation to HUD of any material 
    fact.
        5. HUD's exercise or non-exercise of any right or remedy for PHA 
    default under the ACC is not a waiver of HUD's right to exercise that 
    or any other right or remedy at any time.
        6. HUD may terminate the ACC at any time in whole or in part if HUD 
    determines that the PHA has committed any default under the ACC.
        7. HUD shall terminate the ACC by written notice to the PHA, which 
    shall state:
    
    --The reason for termination.
    --The date of termination.
    
        8. HUD may take title or possession to any or all program property:
    
    --Upon occurrence of a default by the PHA, or
    --Upon termination of the ACC in whole or in part, or
    --Upon expiration of the ACC term.
    
    Conflict of Interest
    
        1. Neither the PHA, nor any PHA contractor, subcontractor or agent 
    for operations under the ACC, nor any other entity or individual with 
    administrative functions or responsibility concerning contract 
    administration under the ACC, may enter into any contract, subcontract, 
    or other arrangement in connection with contract administration under 
    the ACC in which any covered individual or entity has any direct or 
    indirect interest (including the interest of any immediate family 
    member), while such person is a covered individual or entity or during 
    one year thereafter.
        2. ``Immediate family member'' means the spouse, parent, child, 
    grandparent, grandchild, sister, or brother of any covered individual.
        3. ``Covered individual or entity'' means an individual or entity 
    that is a member of any of the following classes:
    
    --A present or former member, officer or director of the PHA, or other 
    PHA official with administrative functions or responsibility concerning 
    contract administration under the ACC.
    --If the PHA is an instrumentality of a governmental body:
    --A present or former member, officer or director of such governmental 
    body.
    --A present or former member, officer or director of any entity that 
    holds a direct or indirect interest in the instrumentality entity.
    --An employee of the PHA.
    --A PHA contractor, subcontractor or agent with administrative 
    functions or
    
    [[Page 27382]]
    
    responsibility concerning contract administration under the ACC, or any 
    principal or other interested party of such contractor, subcontractor 
    or agent.
    --An individual who has administrative functions or responsibility 
    concerning contract administration under the ACC, including an employee 
    of a PHA contractor, subcontractor or agent.
    --A public official, member of a governing body, or State or local 
    legislator, who exercises functions or responsibilities concerning 
    contract administration under the ACC.
    
        4. The PHA shall require any covered individual or entity to 
    disclose his, her or its interest or prospective interest to the PHA 
    and HUD.
        5. During the term of the ACC, the PHA shall not own or otherwise 
    possess any direct or indirect interest in any covered unit (including 
    a unit owned or possessed, in whole or in part, by an entity 
    substantially controlled by the PHA), and shall not claim or receive 
    any administrative fee for contract administration of a unit in which 
    the PHA has any such interest.
        6. HUD may waive the conflict of interest requirements for good 
    cause. Any covered individual or entity for whom a waiver is granted 
    may not execute any contract administration functions or responsibility 
    concerning a HAP contract under which such individual is or may be 
    assisted, or with respect to a HAP contract in which such individual or 
    entity is a party or has any interest.
        7. No member of or delegate to the Congress of the United States of 
    America or resident commissioner shall be admitted to any share or part 
    of the ACC or to any benefits which may arise from it.
    
    Equal Opportunity
    
        1. The PHA shall comply with all equal opportunity requirements 
    imposed by Federal law, including applicable requirements under:
    
    --The Fair Housing Act, 42 U.S.C. 3610-3619 (implementing regulations 
    at 24 CFR parts 100 et seq.).
    --Title VI of the Civil rights Act of 1964, 42 U.S.C. 2000d 
    (implementing regulations at 24 CFR part 1).
    --The Age Discrimination Act of 1975, 42 U.S.C. 6101-6107 (implementing 
    regulations at 24 CFR part 146).
    --Executive Order 11063, Equal Opportunity in Housing (1962), as 
    amended, Executive Order 12259, 46 FR 1253 (1980), as amended, 
    Executive Order 12892, 59 FR 2939 (1994) (implementing regulations at 
    24 CFR part 107).
    --Section 504 of the Rehabilitation Act of 1973, 29 U.S.C. 794 
    (implementing regulations at 24 CFR part 8).
    --Title II of the Americans with Disabilities Act, 42 U.S.C. 12101 et 
    seq.
    
        2. The PHA must submit a signed certification to HUD of the PHA's 
    intention to comply with the Fair Housing Act, Title VI of the Civil 
    Rights Act of 1964, the Age Discrimination Act of 1975, Executive Order 
    11063, Section 504 of the Rehabilitation Act of 1973, and Title II of 
    the Americans with Disabilities Act.
        3. The PHA shall cooperate with HUD in the conducting of compliance 
    reviews and complaint investigations pursuant to applicable civil 
    rights statutes, Executive Orders, and related rules and regulations.
    
    Communication With HUD
    
        The CA shall communicate with HUD through the official or officials 
    designated by HUD.
    
    Exclusion of Third Party Rights
    
        1. A family that is eligible for housing assistance under the ACC 
    is not a party to or a third party beneficiary of the ACC.
        2. Nothing in the ACC shall be construed as creating any right of 
    any third party to enforce any provision of the ACC, or to assert any 
    claim against HUD or the PHA.
    
    Public Housing Agency
    
    ----------------------------------------------------------------------
    Signature of authorized representative
    
    ----------------------------------------------------------------------
    Name and official title (print)
    
    ----------------------------------------------------------------------
    Date
    ----------------------------------------------------------------------
    
    Secretary of Housing and Urban Development
    
    Signature of authorized representative
    
    ----------------------------------------------------------------------
    Name and official title (print)
    
    ----------------------------------------------------------------------
    Date
    
    BILLING CODE 4210-27-P
    
    [[Page 27383]]
    
    [GRAPHIC] [TIFF OMITTED] TN19MY99.009
    
    
    
    [[Page 27384]]
    
    [GRAPHIC] [TIFF OMITTED] TN19MY99.010
    
    
    
    [[Page 27385]]
    
    [GRAPHIC] [TIFF OMITTED] TN19MY99.011
    
    
    
    [[Page 27386]]
    
    [GRAPHIC] [TIFF OMITTED] TN19MY99.012
    
    
    
    [[Page 27387]]
    
    [GRAPHIC] [TIFF OMITTED] TN19MY99.013
    
    
    
    [[Page 27388]]
    
    [GRAPHIC] [TIFF OMITTED] TN19MY99.014
    
    
    [FR Doc. 99-12502 Filed 5-18-99; 8:45 am]
    BILLING CODE 4210-27-C
    
    
    

Document Information

Effective Date:
6/3/1999
Published:
05/19/1999
Department:
Housing and Urban Development Department
Entry Type:
Notice
Action:
Notice of Request for Proposals.
Document Number:
99-12502
Dates:
June 3, 1999.
Pages:
27358-27388 (31 pages)
Docket Numbers:
Docket No. FR-4511-N-01
PDF File:
99-12502.pdf