Start Preamble
Start Printed Page 45157
AGENCY:
Rural Utilities Service, USDA.
ACTION:
Final rule.
SUMMARY:
The Rural Utilities Service (RUS) hereby amends its existing environmental regulations, Environmental Policies and Procedures, which have served as RUS' implementation of the National Environmental Policy Act (NEPA) in compliance with the Council on Environmental Quality (CEQ) Regulations for Implementing the Procedural Provisions of the NEPA. Based on a greater use of small-scale and distributed generation and renewable resources, and the agency's experience and review of its existing procedures, RUS has determined that several changes are necessary for its environmental review process to operate in a more effective and efficient manner.
EFFECTIVE DATE:
August 1, 2003.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Lawrence R. Wolfe, Senior Environmental Protection Specialist, Engineering and Environmental Staff; Rural Utilities Service, Stop 1571, 1400 Independence Ave., SW., Washington, DC 20250-1571. Telephone (202) 720-1784. E-mail address: lwolfe@rus.usda.gov.
This rule and the guidance bulletin described in this rule are available on the Internet via the RUS home page at http://www.usda.gov/rus/.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
Executive Order 12866
This rule has been determined to be not significant for purposes of Executive Order 12866 and, therefore has not been reviewed by the Office of Management and Budget (OMB).
Executive Order 12372
This rule is excluded from the scope of Executive Order 12372, Intergovernmental Consultation, which requires consultation with State and local officials. See the final rule related notice titled “Department Programs and Activities Excluded from Executive Order 12372” (50 FR 47034) advising that RUS loans and loan guarantees were not covered by Executive Order 12372.
Executive Order 12988
This rule has been reviewed under Executive Order 12988, Civil Justice Reform. RUS has determined that this rule meets the applicable standards provided in section 3 of the Executive Order. In addition, all State and local laws and regulations that are in conflict with this rule will be preempted. No retroactive effect will be given to this rule, and, in accordance with section 212(e) of the Department of Agriculture Reorganization Act of 1994 (7 U.S.C. 6912(e)), administrative appeals procedures, if any are required, must be exhausted before an action against the Department or its agencies.
Regulatory Flexibility Act Certification
In accordance with the Regulatory Flexibility Act (5 U.S.C. 601 et seq.), the Administrator of RUS has determined that this rule, if adopted, would not have significant impact on a substantial number of small entities. The rule serves to clarify the existing regulation and to change the existing classification of selected minor actions to generally streamline the environmental review process for such actions. Most of the changes in the rule should result in modest cost savings and ease the regulatory compliance burden for affected applicants.
Information Collection and Recordkeeping Requirements
This rule contains no additional information collection or recordkeeping requirements under OMB control number 0572-0117 that would require approval under the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35).
Unfunded Mandates
This rule contains no Federal mandates (under the regulatory provision of title II of the Unfunded Mandates Reform Act) for State, local, and tribal governments of the private sector. Thus, this proposed rule is not subject to the requirements of section 202 and 205 of the Unfunded Mandates Reform Act.
National Environmental Policy Act Certification
RUS has determined that this rule will not significantly affect the quality of the human environment as defined by the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) Therefore, this action does not require an environmental impact statement or assessment.
Program Affected
The program described by this rule is listed in the Catalog of Federal Domestic Assistance programs under number 10.850, Rural Electrification Loans and Loan Guarantees. This catalog is available on a subscription basis from the Superintendent of Documents, the U.S. Government Printing Office, Washington, DC 20402-9325, telephone number (202) 512-1800.
Background
On December 11, 1998, the Rural Utilities Service (RUS) published 7 CFR part 1794, Environmental Policies and Procedures, as a final rule in the Federal Register (63 FR 68648) covering the actions of the electric, telecommunications, and water and waste programs. Based on a greater emphasis within the electric industry on the use of small-scale and distributed generation and renewable resources, and the agency's experience and review of its existing procedures, RUS determined that several changes were necessary for its environmental review process to operate in a more effective and efficient manner.
This rule contains a variety of changes from the provisions of the current rule. Most of these revisions are minor or merely intended to clarify existing RUS policy and procedure and to ensure that procedures are consistent among the three RUS programs. Other revisions expand upon the existing types of actions that are subject to environmental review or reclassify actions within Start Printed Page 45158categories. The more significant changes are discussed below.
Within subpart A, the term “distributed generation” has been added to the list of definitions and the term “Environmental Analysis (EVAL)” has been deleted from the list of definitions in § 1794.6. A bulletin was issued in early 2002 that provides guidance in preparing for and carrying out scoping for electric generation and transmission projects that require either an environmental assessment with scoping or an environmental impact statement. Further information on the RUS guidance bulletins is provided in § 1794.7.
Within subpart B, language clarifying RUS policy regarding the completion of RUS environmental review process for certain categories of actions has been added to § 1794.15(a).
Within subpart C, a number of additional listings to the existing classification and changes to selected listings within the existing classification have been made. These reclassifications involve minor actions proposed by applicants, which rarely, if ever, result in significant environmental impact or public interest. These changes will streamline environmental review of minor actions, and will allow the agency to focus its resources on larger projects. RUS believes that the changes and existing procedures will provide adequate safeguards to identify any unusual circumstances that may require additional agency scrutiny.
Within § 1794.21(b), RUS added separate categories for generating facilities of less than 100 kilowatts and the co-firing of bio-fuels and refuse derived fuels at existing fossil-fueled generating stations. Within § 1794.22(a), RUS modified the capacity thresholds for distributed generation facilities at existing sites. A new category involving adding combined cycle facilities at existing combustion turbine sites was added to § 1794.22(a).
In addition to including fuel cell and combined cycle generation in the same listings as combustion turbines, RUS added two new categories of proposals within § 1794.23. One new category covers the construction of a natural gas pipeline to serve an existing gas-fueled generating facility. The other new category involves a higher capacity threshold for adding combined cycle facilities at existing combustion turbine sites. Other capacity threshold changes within § 1794.23 reflect changes that were made in § 1794.22(a). Within §§ 1794.24 and 1794.25 the only change adds fuel cell and combined cycle generation in the same listing as combustion turbines.
RUS has modified its procedures in subpart E of this part. In §§ 1794.43 and 1794.44, RUS eliminated the requirement to publish in the Federal Register, a notice of Environmental Assessment (EA) and Finding of No Significant Impact (FONSI) availability for electric and telecommunications proposed actions described in § 1794.23. RUS has determined that no appreciable benefit has resulted from publishing a separate Federal Register notice for proposals in that category. By this change, the notice requirements for all three RUS programs would be consistent for all EA proposals described in § 1794.23. Electric proposals described in § 1794.24 would still be subject to this requirement.
In subpart G of this part, RUS has modified its policy regarding the use of a contractor prepared Environmental Impact Statement (EIS). Under the existing regulation, the EIS would either be developed by RUS from an applicant prepared Environmental Analysis (EVAL) or prepared with the assistance of a consultant selected by RUS. Based on its experience in recent years, RUS expects to utilize the services of a consultant selected by and working for RUS for all actions requiring the preparation of an EIS. RUS does not contemplate preparing a draft or final EIS relying on an applicant prepared EVAL, as currently stated in § 1794.61(b). Therefore, RUS has deleted § 1794.61(b). Also, the applicant submitted document for all proposals will be titled an Environmental Report (ER). Previously, the applicant supplied document for a § 1794.24 proposal was an EVAL. These changes affect §§ 1794.50, 1794.52 through 1794.54, and 1794.61.
Preparation of the Rulemaking
The proposed rule amending 7 CFR part 1794 was published in the Federal Register on January 15, 2003 (68 FR 1988). Public comment was invited for a 30-day period ending on February 14, 2003. The only public comments received were from a rural electric cooperative. Those comments supported the changes being proposed. Comments received from the President's Council on Environmental Quality (CEQ) have resulted in changes to two listings. Item § 1794.22(a) (13) “Construction of a natural gas pipeline (ten miles or less in length) to serve an existing gas-fueled generating station,” has been deleted. Listing § 1794.23(c) (13) has been modified by deleting the (more than 10 miles in length) threshold. As recommended by CEQ, § 1794.54 was expanded to better clarify the RUS policy of publishing notices in the Federal Register for proposals listed in § 1794.24.
Start List of SubjectsList of Subjects in 7 CFR Part 1794
- Environmental impact statements
- Reporting and recordkeeping requirements
Therefore RUS amends chapter XVII of title 7 of the Code of Federal Regulations as follows:
End Amendment Part Start PartPART 1794—ENVIRONMENTAL POLICIES AND PROCEDURES
End Part Start Amendment Part1. The authority citation for part 1794 continues to read as follows:
End Amendment Part Start Amendment Part2. Section 1794.6 is amended by:
End Amendment Part Start Amendment PartA. Removing the definition for “Environmental Analysis (EVAL)”;
End Amendment Part Start Amendment PartB. Adding the definition for “Distributed Generation”, and
End Amendment Part Start Amendment PartC. Amending the definition for “Environmental Report (ER) by revising the first sentence.
End Amendment PartThese amendments read as follows:
Definitions.* * * * *Distributed Generation. The generation of electricity by a sufficiently small electric generating system as to allow interconnection of the system near the point of service at distribution voltages or customer voltages. A distributed generating system may be fueled by any source, including but not limited to renewable energy sources.
* * * * *Environmental Report (ER). The environmental documentation normally submitted by applicants for proposed actions subject to compliance with §§ 1794.22 through 1794.24. * * *
* * * * *3. Section 1794.7(a) is revised to read as follows:
End Amendment PartGuidance.(a) Electric and Telecommunications Programs. For further guidance in the preparation of public notices and environmental documents, RUS has prepared a series of program specific guidance bulletins. RUS Bulletin 1794A-600 provides guidance in preparing the ER for proposed actions classified as categorical exclusions (CEs) (§ 1794.22(a)); RUS Bulletin 1794A-601 provides guidance in preparing the ER for proposed actions which require EAs (§ 1794.23(b) and (c)); and RUS Bulletin 1794A-603 provides guidance in conducting scoping for proposed actions classified as requiring an EA with scoping or an EIS. Copies of these bulletins are available upon request by Start Printed Page 45159contacting the Rural Utilities Service, Publications Office, Program Development and Regulatory Analysis, Stop 1522, 1400 Independence Avenue, SW., Washington, DC 20250-1522.
* * * * *4. Section 1794.15 is amended by:
End Amendment Part Start Amendment PartA. Adding a new sentence to the end of paragraph (a), and
End Amendment Part Start Amendment PartB. Adding new paragraphs (a)(1), (a)(2), and (a)(3).
End Amendment PartThese amendments read as follows:
Limitations on actions during the NEPA process.(a) * * * The RUS environmental review process is concluded when:
(1) A categorical exclusion determination has been made for proposals listed under §§ 1794.21 and 1794.22.
(2) Applicant notices announcing the RUS FONSI determination have been published for proposals listed under §§ 1794.23 and 1794.24.
(3) Applicant notices announcing the RUS Record of Decision have been published for proposals listed under § 1794.25.
* * * * *5. Section 1794.21 is amended by adding new paragraphs (b)(25) and (26) to read as follows:
End Amendment PartCategorically excluded proposals without an ER.* * * * *(b) * * *
(25) Electric generating facilities of less than 100 kilowatts at any one site for the purpose of providing service to customers or facilities such as stock tanks and irrigation pumps.
(26) New bulk commodity storage and associated handling facilities within existing fossil-fueled generating station boundaries for the purpose of co-firing bio-fuels and refuse derived fuels. A description of the facilities to be constructed shall be provided to RUS.
* * * * *6. Section 1794.22 is amended by revising paragraphs (a)(8) and (9) and by adding new paragraph (a)(12) to read as follows:
End Amendment Part(8) Construction of distributed generation totaling 10 MW or less at an existing utility, industrial, commercial or educational facility site. There is no capacity limit for a generating facility located at or adjacent to an existing landfill site that is powered by refuse derived fuel. All new associated facilities and related electric power lines shall be covered in the ER;
(9) Installation of new generating units or the replacement of existing generating units at a hydroelectric facility or dam which result in no change in the normal maximum surface area or normal maximum surface elevation of the existing impoundment. All new associated facilities and related electric power lines shall be covered in the ER;
* * * * *(12) Installing a heat recovery steam generator and steam turbine with a rating of 200 MW or less on an existing combustion turbine generation site for the purpose of combined cycle operation. All new associated facilities and related electric power lines shall be covered in the ER.
* * * * *Start Amendment Part7. Section 1794.23 is amended by:
End Amendment Part Start Amendment PartA. Revising paragraph (c)(1), (c)(2), and (c)(3), and
End Amendment Part Start Amendment PartB. Adding new paragraphs (c)(12) and (c)(13).
End Amendment PartThe revision and additions read as follows:
Proposals normally requiring an EA.* * * * *(c) * * *
(1) Construction of fuel cell, combustion turbine, combined cycle, or diesel generating facilities of 50 MW (nameplate rating) or less at a new site (no existing generating capacity) except for items covered by § 1794.22(a)(8). All new associated facilities and related electric power lines shall be covered in the EA;
(2) Construction of fuel cell, combustion turbine, combined cycle, or diesel generating facilities of 100 MW (nameplate rating) or less at an existing generating site, except for items covered by § 1794.22(a)(8). All new associated facilities and related electric power lines shall be covered in the EA;
(3) Construction of any other type of new electric generating facility of 20 MW (nameplate rating) or less, except for items covered by § 1794.22(a)(8). All new associated facilities and related electric power lines shall be covered in the EA;
* * * * *(12) Installing a heat recovery steam generator and steam turbine with a rating of more than 200 MW on an existing combustion turbine generation site for the purpose of combined cycle operation. All new associated facilities and related electric power lines shall be covered in the EA.
(13) Construction of a natural gas pipeline to serve an existing gas-fueled generating facility.
8. Section 1794.24(b)(2) is revised to read as follows:
End Amendment PartProposals normally requiring an EA with scoping.* * * * *(b) * * *
(2) Construction of fuel cell, combustion turbine, combined cycle, and diesel generating facilities of more than 50 MW at a new site or more than 100 MW at an existing site; and the construction of any other type of electric generating facility of more than 20 MW but not more than 50 MW (nameplate rating). All new associated facilities and related electric power lines shall be covered in any EA or EIS that is prepared.
* * * * *9. Section 1794.25(a)(1) is revised to read as follows:
End Amendment PartProposals normally requiring an EIS.* * * * *(a) * * *
(1) New electric generating facilities of more than 50 MW (nameplate rating) other than fuel cell, combustion turbine, combined cycle, or diesel generators. All new associated facilities and related electric power lines shall be covered in the EIS; and
* * * * *[Amended]10. Amend § 1794.43 by:
End Amendment Part Start Amendment PartA. Removing paragraph (b), and
End Amendment Part Start Amendment PartB. Amending paragraph (a) by removing the paragraph designation and the heading “General”.
End Amendment Part Start Amendment Part11. Section 1794.44 is revised to read as follows:
End Amendment PartTiming of agency action.RUS may take its final action on proposed actions requiring an EA (§ 1794.23) at any time after publication of applicant notices that a FONSI has been made and any required review period has expired. When substantive comments are received on the EA, RUS may provide an additional period (15 days) for public review following the publication of its FONSI determination. Final action shall not be taken until this review period has expired.
12. Section 1794.50 is revised to read as follows:
End Amendment PartNormal sequence.For proposed actions covered by § 1794.24 and other actions determined by the Administrator to require an EA with scoping, RUS and the applicant will follow the same procedures for scoping and the requirements for notices and documents as for proposed Start Printed Page 45160actions normally requiring an EIS through the point where project scoping has been completed. Following project scoping, RUS will make a judgment to have an EA prepared or contract for the preparation of an EIS.
13. Section 1794.51(a) is revised to read as follows:
End Amendment PartPreparation for scoping.(a) As soon as practicable after RUS and the applicant have developed a schedule for the environmental review process, RUS shall have its notice of intent to prepare an EA or EIS and schedule scoping meetings (§ 1794.13) published in the Federal Register (see 40 CFR 1508.22). The applicant shall have published, in a timely manner, a notice similar to RUS’ notice.
* * * * *14. Section 1794.52(d) is amended by removing the last sentence and adding two new sentences at the end of the paragraph to read as follows:
End Amendment PartScoping meetings.* * * * *(d) * * * The applicant or its consultant shall prepare a record of the scoping meeting. The record shall consist of a transcript when a traditional meeting format is used or a summary report when an open house format is used.
* * * * *15. Section 1794.53 is revised to read as follows:
End Amendment PartEnvironmental report.(a) After scoping procedures have been completed, RUS shall require the applicant to develop and submit an ER. The ER shall be prepared under the supervision and guidance of RUS staff and RUS shall evaluate and be responsible for the accuracy of all information contained therein.
(b) The applicant's ER will normally serve as the RUS EA. After RUS has reviewed and found the ER to be satisfactory, the applicant shall provide RUS with a sufficient number of copies of the ER to satisfy the RUS distribution plan.
(c) The ER shall include a summary of the construction and operation monitoring and mitigation measures for the proposed action. These measures may be revised as appropriate in response to comments and other information, and shall be incorporated by summary or reference into the FONSI.
16. Section 1794.54 is revised to read as follows:
End Amendment PartAgency determination.Following the scoping process and the development of a satisfactory ER by the applicant or its consultant that will serve as the agency's EA, RUS shall determine whether the proposed action is a major Federal action significantly affecting the quality of the human environment. If RUS determines the action is significant, RUS will continue with the procedures in subpart G of this part. If RUS determines the action is not significant, RUS will proceed in accordance with §§ 1794.42 through 1794.44. For proposals subject to the procedures of subpart F, RUS shall publish notices in the Federal Register that announce the availability of the EA and solicit public comments on the EA (refer to § 1794.42) and the RUS finding and the availability of the EA and FONSI (refer to § 1794.43).
[Amended]17. Section 1794.61 is amended by:
End Amendment Part Start Amendment PartA. Removing paragraph (b).
End Amendment Part Start Amendment PartB. Removing the heading General from paragraph (a); redesignating paragraph (a) as the introductory text; paragraph (a)(1) as (a); paragraph (a)(2) as (b); and paragraph (a)(3) as (c).
End Amendment Part Start SignatureDated: July 11, 2003.
Hilda Gay Legg,
Administrator, Rural Utilities Service.
[FR Doc. 03-19619 Filed 7-31-03; 8:45 am]
BILLING CODE 3410-15-P
Document Information
- Effective Date:
- 8/1/2003
- Published:
- 08/01/2003
- Department:
- Rural Utilities Service
- Entry Type:
- Rule
- Action:
- Final rule.
- Document Number:
- 03-19619
- Dates:
- August 1, 2003.
- Pages:
- 45157-45160 (4 pages)
- RINs:
- 0572-AB73: Environmental Policies and Procedures
- RIN Links:
- https://www.federalregister.gov/regulations/0572-AB73/environmental-policies-and-procedures
- Topics:
- Environmental impact statements, Reporting and recordkeeping requirements
- PDF File:
- 03-19619.pdf
- CFR: (16)
- 7 CFR 1794.6
- 7 CFR 1794.7
- 7 CFR 1794.15
- 7 CFR 1794.21
- 7 CFR 1794.22
- More ...