Start Preamble
AGENCY:
Coast Guard, DHS.
ACTION:
Notice of temporary deviation from regulations.
SUMMARY:
The Commander, Eighth Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the Burlington Northern Railway Vertical Lift Span Railroad Bridge across Berwick Bay, mile 17.5 [Gulf Intracoastal Waterway (Morgan City to Port Allen Alternate Route), mile 0.4], at Morgan City, St. Mary Parish, Louisiana. This deviation provides for two (2) four-hour bridge closures to conduct scheduled maintenance to the railroad on the drawbridge.
DATES:
This deviation is effective from 8 a.m. on Tuesday, November 29, 2005 until noon on Wednesday, November 30, 2005.
ADDRESSES:
Materials referred to in this document are available for inspection or copying at the office of the Eighth Coast Guard District, Bridge Administration Branch, Hale Boggs Federal Building, room 1313, 500 Poydras Street, New Orleans, Louisiana 70130-3310 between Start Printed Page 694407 a.m. and 3 p.m., Monday through Friday, except Federal holidays. The telephone number is (504) 589-2965. The Bridge Administration Branch of the Eighth Coast Guard District maintains the public docket for this temporary deviation.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
David Frank, Bridge Administration Branch, telephone (504) 589-2965.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
The Burlington Northern Railway Company has requested a temporary deviation in order to repair and replace broken bolts on the lift span of the bridge across Berwick Bay, mile 17.5, at Morgan City, St. Mary Parish, Louisiana. This maintenance is essential for the continued safe operation of the railroad bridge. This temporary deviation will allow the bridge to remain in the closed-to-navigation position from 8 a.m. until noon on Tuesday, November 29, 2005 and Wednesday, November 30, 2005.
The vertical lift span bridge has a vertical clearance of 4 feet above National Geodetic Vertical Datum (NGVD) in the closed-to-navigation position and 73 feet above NGVD in the open-to-navigation position. Navigation at the site of the bridge consists of tugs with tows transporting petroleum products, chemicals and construction equipment, commercial fishing vessels, oil industry related work boats and crew boats and some recreational craft. Since the lift span of the bridge will only be closed to navigation four hours per day for two days, ample time will be allowed for commercial and recreational vessels to schedule transits. Accordingly, it has been determined that this closure will not have a significant effect on vessel traffic. The bridge normally remains in the open-to-navigation position until a train enters the signal block, requiring it to close. An average number of openings for the passage of vessels is, therefore, not available. During the repair period, the bridge may open for emergencies; however, delays should be expected to remove all equipment from the bridge. The Intracoastal Waterway—Morgan City to Port Allen Landside Route is an alternate route for vessels with less than a 12-foot draft.
In accordance with 33 CFR 117.35(c), this work will be performed with all due speed in order to return the bridge to normal operation as soon as possible. This deviation from the operating regulations is authorized under 33 CFR 117.35.
Start SignatureDated: November 7, 2005.
Marcus Redford,
Bridge Administrator.
[FR Doc. 05-22646 Filed 11-15-05; 8:45 am]
BILLING CODE 4910-15-P
Document Information
- Effective Date:
- 11/29/2005
- Published:
- 11/16/2005
- Department:
- Coast Guard
- Entry Type:
- Rule
- Action:
- Notice of temporary deviation from regulations.
- Document Number:
- 05-22646
- Dates:
- This deviation is effective from 8 a.m. on Tuesday, November 29, 2005 until noon on Wednesday, November 30, 2005.
- Pages:
- 69439-69440 (2 pages)
- Docket Numbers:
- CGD08-05-052
- PDF File:
- 05-22646.pdf
- CFR: (1)
- 33 CFR 117