E7-9518. Approval and Promulgation of Air Quality Implementation Plans; Maryland; Update to Materials Incorporated by Reference  

  • Start Preamble

    AGENCY:

    Environmental Protection Agency (EPA).

    ACTION:

    Final rule; Notice of administrative change.

    SUMMARY:

    EPA is updating the materials submitted by Maryland that are incorporated by reference (IBR) into the State implementation plan (SIP). The regulations affected by this update have been previously submitted by the Maryland Department of the Environment (MDE) and approved by EPA. This update affects the SIP materials that are available for public inspection at the National Archives and Records Administration (NARA), the Air and Radiation Docket and Information Center located at EPA Headquarters in Washington, DC, and the Regional Office.

    EFFECTIVE DATE:

    This action is effective May 18, 2007.

    ADDRESSES:

    SIP materials which are incorporated by reference into 40 CFR part 52 are available for inspection at the following locations: Air Protection Division, U.S. Environmental Protection Agency, Region III, 1650 Arch Street, Philadelphia, Pennsylvania 19103; the Air and Radiation Docket and Information Center, EPA Headquarters Library, Room Number 3334, EPA West Building, 1301 Constitution Ave., NW., Washington, DC 20460, and the National Archives and Records Administration. If you wish to obtain materials from a docket in the EPA Headquarters Library, please call the Office of Air and Radiation (OAR) Docket/Telephone number: (202) 566-1742; or the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/​federal_​register/​code_​of_​federal_​regulations/​ibr_​locations.html.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Harold A. Frankford, (215) 814-2108 or by e-mail at frankford.harold@epa.gov.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    The SIP is a living document which the State revises as necessary to address the unique air pollution problems. Therefore, EPA from time to time must take action on SIP revisions containing new and/or revised regulations to make them part of the SIP. On May 22, 1997 (62 FR 27968), EPA revised the procedures for incorporating by reference Federally-approved SIPs, as a result of consultations between EPA and the Office of the Federal Register (OFR). The description of the revised SIP document, IBR procedures and “Identification of plan” format are discussed in further detail in the May 22, 1997 Federal Register document. On November 29, 2004 (69 FR 69304), EPA published a document in the Federal Register beginning the new IBR procedure for Maryland. On February 2, 2006 (72 FR 5607), EPA published an update to the IBR material for Maryland. In this document, EPA is doing the following:

    1. Announcing the update to the IBR material as of March 15, 2007.

    2. Making corrections to the following entries listed in the paragraph 52.1070(c) chart, as described below:

    a. COMAR 26.11.01.04—revising the text in the “Additional explanation/citation at 40 CFR § 52.1100” column by adding the SIP effective date.

    b. COMAR 26.11.09.01—revising the text in the “Additional explanation/citation at 40 CFR § 52.1100” column by correcting the COMAR citation.

    c. Technical Memorandum (TM) 91-01—This entry is revised to reflect EPA's approval of revisions to this TM Start Printed Page 27958document on September 7, 2001 (66 FR 46727).

    3. Making corrections to the following entries listed in the paragraph 52.1070(d) chart, as described below:

    a. Entry for Potomac Electric Power Company (PEPCO)—Chalk Point—amending the Federal Register citation for EPA's approval action.

    b. Entry for Kaydon Ring and Seal, Inc.—revising the text in the “Additional explanation” column by removing the SIP effective date.

    4. Making a correction to the paragraph 52.1070(e) chart by adding an entry for the Mobile budgets associated with the 2005 Rate of Progress plan for the Metropolitan Baltimore (1-hour) Ozone Nonattaiment Area. The revised entry adds a date and Federal Register citation, inadvertently omitted in the November 29, 2004 and February 2, 2006 Federal Register documents, on which EPA approved revisions to these mobile budgets.

    EPA has determined that today's rule falls under the “good cause” exemption in section 553(b)(3)(B) of the Administrative Procedures Act (APA) which, upon finding “good cause,” authorizes agencies to dispense with public participation, and section 553(d)(3) which allows an agency to make a rule effective immediately (thereby avoiding the 30-day delayed effective date otherwise provided for in the APA). Today's rule simply codifies provisions which are already in effect as a matter of law in Federal and approved State programs. Under section 553 of the APA, an agency may find good cause where procedures are “impractical, unnecessary, or contrary to the public interest.” Public comment is “unnecessary and contrary to the public interest” since the codification only reflects existing law. Immediate notice in the CFR benefits the public by removing outdated citations and incorrect chart entries.

    Statutory and Executive Order Reviews

    A. General Requirements

    Under Executive Order 12866 (58 FR 51735, October 4, 1993), this action is not a “significant regulatory action” and therefore is not subject to review by the Office of Management and Budget. For this reason, this action is also not subject to Executive Order 13211, “Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use” (66 FR 28355, May 22, 2001). This action merely approves state law as meeting Federal requirements and imposes no additional requirements beyond those imposed by state law. Accordingly, the Administrator certifies that this rule will not have a significant economic impact on a substantial number of small entities under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.). Because this rule approves pre-existing requirements under state law and does not impose any additional enforceable duty beyond that required by state law, it does not contain any unfunded mandate or significantly or uniquely affect small governments, as described in the Unfunded Mandates Reform Act of 1995 (Pub. L. 104-4). This rule also does not have tribal implications because it will not have a substantial direct effect on one or more Indian tribes, on the relationship between the Federal Government and Indian tribes, or on the distribution of power and responsibilities between the Federal Government and Indian tribes, as specified by Executive Order 13175 (65 FR 67249, November 9, 2000). This action also does not have Federalism implications because it does not have substantial direct effects on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government, as specified in Executive Order 13132 (64 FR 43255, August 10, 1999). This action merely approves a state rule implementing a Federal standard, and does not alter the relationship or the distribution of power and responsibilities established in the Clean Air Act. This rule also is not subject to Executive Order 13045 “Protection of Children from Environmental Health Risks and Safety Risks” (62 FR 19885, April 23, 1997), because it approves a state rule implementing a Federal standard. In reviewing SIP submissions, EPA's role is to approve state choices, provided that they meet the criteria of the Clean Air Act. In this context, in the absence of a prior existing requirement for the State to use voluntary consensus standards (VCS), EPA has no authority to disapprove a SIP submission for failure to use VCS. It would thus be inconsistent with applicable law for EPA, when it reviews a SIP submission, to use VCS in place of a SIP submission that otherwise satisfies the provisions of the Clean Air Act. Thus, the requirements of section 12(d) of the National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) do not apply. This rule does not impose an information collection burden under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).

    B. Submission to Congress and the Comptroller General

    The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the Small Business Regulatory Enforcement Fairness Act of 1996, generally provides that before a rule may take effect, the agency promulgating the rule must submit a rule report, which includes a copy of the rule, to each House of the Congress and to the Comptroller General of the United States. EPA will submit a report containing this rule and other required information to the U.S. Senate, the U.S. House of Representatives, and the Comptroller General of the United States prior to publication of the rule in the Federal Register. This rule is not a “major rule” as defined by 5 U.S.C. 804(2).

    C. Petitions for Judicial Review

    EPA has also determined that the provisions of section 307(b)(1) of the Clean Air Act pertaining to petitions for judicial review are not applicable to this action. Prior EPA rulemaking actions for each individual component of the Maryland SIP compilations had previously afforded interested parties the opportunity to file a petition for judicial review in the United States Court of Appeals for the appropriate circuit within 60 days of such rulemaking action. Thus, EPA sees no need in this action to reopen the 60-day period for filing such petitions for judicial review for this “Identification of plan” reorganization update action for Maryland.

    Start List of Subjects

    List of Subjects in 40 CFR Part 52

    • Environmental protection
    • Air pollution control
    • Carbon monoxide
    • Incorporation by reference
    • Intergovernmental relations
    • Lead
    • Nitrogen dioxide
    • Ozone
    • Particulate matter
    • Reporting and recordkeeping requirements
    • Sulfur oxides
    • Volatile organic compounds
    End List of Subjects Start Signature

    Dated: April 27, 2007.

    Donald S. Welsh,

    Regional Administrator, Region III.

    End Signature Start Amendment Part

    40 CFR part 52 is amended as follows:

    End Amendment Part Start Part

    PART 52—[AMENDED]

    End Part Start Amendment Part

    1. The authority for citation for part 52 continues to read as follows:

    End Amendment Part Start Authority

    Authority: 42.U.S.C. 7401 et seq.

    End Authority

    Subpart V—Maryland

    Start Amendment Part

    2. Section 52.1070 is amended by revising paragraphs (b), (c), (d), and (e) to read as follows:

    End Amendment Part
    Identification of plan.
    * * * * *
    Start Printed Page 27959

    (b) Incorporation by reference. (1) Material listed as incorporated by reference in paragraphs (c) and (d) was approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Material incorporated as it exists on the date of the approval, and notice of any change in the material will be published in the Federal Register. Entries in paragraphs (c) and (d) of this section with EPA approval dates on or after March 15, 2007 will be incorporated by reference in the next update to the SIP compilation.

    (2) EPA Region III certifies that the rules/regulations provided by EPA at the addresses in paragraph (b)(3) of this section are an exact duplicate of the officially promulgated State rules/regulations which have been approved as part of the State implementation plan as of March 15, 2007.

    (3) Copies of the materials incorporated by reference may be inspected at the EPA Region III Office at 1650 Arch Street, Philadelphia, PA 19103; the EPA, Air and Radiation Docket and Information Center, Room Number 3334, EPA West Building, 1301Constitution Avenue NW., Washington, DC 20460; or at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/​federal_​register/​code_​of_​federal_​regulations/​ibr_​locations.html.

    (c) EPA approved regulations.

    EPA-Approved Regulations in the Maryland SIP

    Code of Maryland administrative regulations (COMAR) citationTitle/subjectState effective dateEPA approval dateAdditional explanation/citation at 40 CFR § 52.1100
    26.11.01 General Administrative Provisions
    26.11.01.01A., .01B Exceptions: .01B(3), (13), (21) through (23), (25)Definitions10/10/015/28/02, 67 FR 36810(c)(171); Additional EPA approvals are codified at §§ 52.1100(c)(119), (c)(122), (c)(143), (c)(148), (c)(158), (c)(159), and (c)(164).
    26.11.01.01B(53)Definitions—definition of volatile organic compound (VOC)9/12/053/31/06, 71 FR 16239Definition reflects the version of 40 CFR 51.100(s) in effect as of 12/31/2004.
    26.11.01.02Relationship of Provisions in this Subtitle8/1/8811/3/92, 57 FR 49651(c)(90)(i)(B)(1).
    26.11.01.03Delineation of Areas8/1/8811/3/92, 57 FR 49651(c)(90)(i)(B)(1).
    26.11.01.04Testing and Monitoring6/19/061/3/07, 72 FR 18Paragraph .04C(2) is added. The SIP effective date is 3/6/07.
    26.11.01.05Records and Information6/30/97, 12/10/015/28/02, 67 FR 36810(c)(172).
    26.11.01.05-1Emission Statements12/7/9210/12/94, 59 FR 51517(c)(109).
    26.11.01.06Circumvention8/1/8811/3/92, 57 FR 49651(c)(90)(i)(B)(1).
    26.11.01.07Malfunctions and Other Temporary Increases in Emissions8/1/8811/3/92, 57 FR 49651(c)(90)(i)(B)(1).
    26.11.01.08Determination of Ground Level Concentrations-Acceptable Techniques8/1/8811/3/92, 57 FR 49651(c)(90)(i)(B)(5).
    26.11.01.09Vapor Pressure of Gasoline8/1/8811/3/92, 57 FR 49651(c)(90)(i)(B)(5).
    26.11.01.10Continuous Emission Monitoring (CEM) Requirements7/22/912/28/96, 61 FR 7418(c)(106); TM90-01 was approved as “additional material”, but not IBR'd.
    26.11.02 Permits, Approvals, and Registration
    26.11.02.01Definitions5/8/952/27/03, 68 FR 9012(c)(182); Exceptions: 26.11.02.01B(1), (1-1), (4)-(6), (10), (15), (16), (22), (29)-(33), (37), (39), (42), (46), (49), (50), (54).
    26.11.02.02General Provisions5/8/952/27/03, 68 FR 9012(c)(182); Exception: .02D.
    26.11.02.03Federally Enforceable Permits to Construct and State Permits to Operate5/8/952/27/03, 68 FR 9012(c)(182).
    26.11.02.04Duration of Permits5/8/952/27/03, 68 FR 9012(c)(182); Exception: .04C(2).
    26.11.02.05Violation of Permits and Approvals5/8/952/27/03, 68 FR 9012(c)(182).
    26.11.02.06Denial of Applications for State Permits and Approvals5/8/95, 6/16/972/27/03, 68 FR 9012(c)(182).
    26.11.02.07Procedures for Denying, Revoking, or Reopening and Revising a Permit or Approval5/8/952/27/03, 68 FR 9012(c)(182).
    Start Printed Page 27960
    26.11.02.08Late Applications and Delays in Acting on Applications5/8/952/27/03, 68 FR 9012(c)(182).
    26.11.02.09Sources Subject to Permits to Construct and Approvals5/8/95, 5/4/982/27/03, 68 FR 9012(c)(182).
    26.11.02.10Sources Exempt from Permits to Construct and Approvals5/8/95, 6/16/97, 9/22/97, 3/22/992/27/03, 68 FR 9012(c)(182).
    26.11.02.11Procedures for Obtaining Permits to Construct Certain Significant Sources5/8/95, 6/16/972/27/03, 68 FR 9012(c)(182); Exception: .11C.
    26.11.02.12Procedures for Obtaining Approvals of PSD Sources and NSR Sources, Permits to Construct, Permits to Construct MACT Determinations on a Case-by-Case Basis in Accordance with 40 CFR Part 63, Subpart B, and Certain 100-Ton Sources5/8/952/27/03, 68 FR 9012(c)(182).
    26.11.02.13Sources subject to State Permits to Operate5/8/952/27/03, 68 FR 9012(c)(182).
    26.11.02.14Procedures for Obtaining State Permits to Operate and Permits to Construct Certain Sources and Permits to Construct Control Equipment on Existing Sources5/8/95, 6/16/972/27/03, 68 FR 9012(c)(182).
    26.11.04 Ambient Air Quality Standards
    26.11.04.02State-Adopted National Ambient Air Quality Standards5/8/958/20/01, 66 FR 43485(c)(165).
    26.11.04.03Definitions, Reference Conditions, and Methods of Measurement2/28/056/14/06, 71 FR 34257
    26.11.04.04Particulate Matter2/28/056/14/06, 71 FR 34257Addition of ambient air quality standard for PM2.5.
    26.11.04.05Sulfur Oxides2/28/056/14/06, 71 FR 34257
    26.11.04.06Carbon Monoxide1/5/88; recodified 8/1/884/7/93, 58 FR 18010(c)(92).
    26.11.04.07Ozone2/28/056/14/06, 71 FR 34257Addition of an 8-hour ambient air quality standard for ozone.
    26.11.04.08Nitrogen Dioxide2/28/056/14/06, 71 FR 34257
    26.11.04.09Lead8/1/8811/3/92, 57 FR 49651(c)(90)(i)(B)(3).
    26.11.05 Air Quality Episode System
    26.11.05.01Definitions6/18/904/14/94, 59 FR 17698(c)(100).
    26.11.05.02General Requirements6/18/904/14/94, 59 FR 17698(c)(100).
    26.11.05.03Air Pollution Episode Criteria6/18/904/14/94, 59 FR 17698(c)(100).
    26.11.05.04Standby Emissions Reduction Plan8/1/8811/3/92, 57 FR 49651(c)(90)(i)(B)(4).
    26.11.05.05Control Requirements and Standby Orders6/18/904/14/94, 59 FR 17698(c)(100).
    26.11.05.06Tables8/1/8811/3/92, 57 FR 49651(c)(90)(i)(B)(4).
    26.11.06 General Emissions Standards, Prohibitions, and Restrictions
    26.11.06.01Definitions5/8/9111/29/94, 59 FR 60908(c)(102)(i)(B)(14).
    26.11.06.02 [Except: .02A(1)(e), (1)(g), (1)(h), (1)(i)]Visible Emissions11/11/028/6/03, 68 FR 46487(c)(181).
    26.11.06.03Particulate Matter11/11/0286/03, 68 FR 46487(c)(181).
    Start Printed Page 27961
    26.11.06.04Carbon Monoxide in Areas III and IV1/5/88; recodified 8/1/884/7/93, 58 FR 18010(c)(92).
    26.11.06.05Sulfur Compounds from Other than Fuel Burning Equipment11/11/028/6/03, 68 FR 46487(c)(181).
    26.11.06.06Volatile Organic Compounds9/22/975/7/01, 66 FR 22924(c)(156). Note: On 2/27/03 (68 FR 9012), EPA approved a revised rule citation with a State effective date of 5/8/95 [(c)(182)(i)(C)].
    26.11.06.10Refuse Burning Prohibited in Certain Installations8/1/8811/3/92, 57 FR 49651(c)(90)(i)(B)(5).
    26.11.06.14Control of PSD sources10/10/015/28/02, 67 FR 36810(c)(171).
    26.11.06.15Nitrogen Oxides from Nitric Acid Plants8/1/8811/3/92, 57 FR 49651(c)(90)(i)(B)(5).
    26.11.06.16Tables8/1/8811/3/92, 57 FR 49651(c)(90)(i)(B)(5).
    26.11.07 Open Fires
    26.11.07.01Definitions5/22/956/11/02, 67 FR 39856(c)(173).
    26.11.07.02General5/22/952/25/97, 62 FR 8380(c)(120).
    26.11.07.03Control Officer May Authorize Certain Open Fires8/11/976/11/02, 67 FR 39856(c)(173).
    26.11.07.04Public Officers May Authorize Certain Fires5/22/952/25/97, 62 FR 8380(c)(120).
    26.11.07.05Open Fires Allowed Without Authorization of Control Officer or Public Officer5/22/952/25/97, 62 FR 8380(c)(120), .05A(3) & (4), and .05B(3) are State-enforceable only.
    26.11.07.06Safety Determinations at Federal Facilities8/11/976/11/02, 67 FR 39856(c)(173).
    10.18.08 Control of Incinerators
    10.18.08.01Definitions3/25/847/2/85, 50 FR 27245(c)(82).
    10.18.08.02Applicability7/18/808/5/81, 46 FR 39818(c)(45).
    10.18.08.03Prohibition of Certain Incinerators in Areas III and IV6/8/815/11/82, 47 FR 20126(c)(58).
    10.18.08.04Visible Emissions3/25/847/2/85, 50 FR 27245(c)(82).
    10.18.08.05Particulate Matter3/25/847/2/85, 50 FR 27245(c)(82).
    10.18.08.06Prohibition of Unapproved Hazardous Waste Incinerators3/25/847/2/85, 50 FR 27245(c)(82).
    26.11.09 Control of Fuel Burning Equipment and Stationary Internal Combustion Engines, and Certain Fuel-Burning Installations
    26.11.09.01Definitions9/12/056/13/06, 71 FR 34014Revised definition of “interruptible gas service” in 26.11.09.01B(4).
    26.11.09.02Applicability8/1/8811/3/92, 57 FR 49651(c)(90)(i)(B)(7).
    26.11.09.03General Conditions for Fuel Burning Equipment6/21/047/6/05, 70 FR 38774Revised paragraphs 26.11.09.03C(1) and .03C(2).
    26.11.09.04Prohibition of Certain New Fuel Burning Equipment8/1/8811/3/92, 57 FR 49651(c)(90)(i)(B)(7).
    26.11.09.05Visible Emissions11/11/025/1/03, 68 FR 23206(c)(183).
    26.11.09.06Control of Particulate Matter6/21/047/6/05, 70 FR 38774Addition of paragraph 26.11.09.06C.
    26.11.09.07Control of Sulfur Oxides from Fuel Burning Equipment8/1/8811/3/92, 57 FR 49651(c)(90)(i)(B)(7).
    26.11.09.08Control of NOX Emissions for Major Stationary Sources11/24/039/20/04, 69 FR 56170(c)(191).
    26.11.09.09Tables and Diagrams11/11/025/1/03, 68 FR 23206(c)(183); Revised Table 1.
    Start Printed Page 27962
    26.11.10 Control of Iron and Steel Production Installations
    26.11.10.01Definitions12/25/0011/7/01, 66 FR 56222(c)(163).
    26.11.10.02Applicability11/2/989/7/01, 66 FR 46727(c)(153).
    26.11.10.03Visible Emissions11/2/989/7/01, 66 FR 46727(c)(153).
    26.11.10.04Control of Particulate Matter11/2/989/7/01, 66 FR 46727(c)(153).
    26.11.10.05Sulfur Content Limitations for Coke Oven Gas11/2/989/7/01, 66 FR 46727(c)(153).
    26.11.10.06[1]Control of Volatile Organic Compounds from Iron and Steel Production Installations12/25/0011/7/01, 66 FR 56222(c)(163).
    26.11.10.06[2]Carbon Monoxide8/1/8811/3/92, 57 FR 49651(c)(90)(i)(B)(8).
    26.11.10.07Testing and Observation Procedures12/25/0011/7/01, 66 FR 56222(c)(163).
    26.11.11 Control of Petroleum Products Installations, Including Asphalt Paving, Asphalt Concrete Plants, and Use of Waste Oils
    26.11.11.01Applicability8/1/8811/3/92, 57 FR 49651(c)(90)(i)(B)(9).
    26.11.11.02Asphalt Paving4/26/931/6/95, 60 FR 2018(c)(113)(i)(B)(1).
    26.11.11.03Asphalt Concrete Plants in Areas I, II, V, and VI8/1/8811/3/92, 57 FR 49651(c)(90)(i)(B)(9).
    26.11.11.06Use of Waste Oils as Fuel8/1/8811/3/92, 57 FR 49651(c)(90)(i)(B)(9).
    26.11.12 Control of Batch Type Hot-Dip Galvanizing Installations
    26.11.12.01Definitions5/8/957/25/00, 64 FR 45743(c)(149).
    26.11.12.02Applicability5/8/957/25/00, 64 FR 45743(c)(149).
    26.11.12.03Prohibitions and Exemptions5/8/957/25/00, 64 FR 45743(c)(149).
    26.11.12.04Visible Emissions8/1/8811/3/92, 57 FR 49651(c)(90)(i)(B)(10).
    26.11.12.05Particulate Matter8/1/8811/3/92, 57 FR 49651(c)(90)(i)(B)(10).
    26.11.12.06Reporting Requirements8/1/8811/3/92, 57 FR 49651(c)(90)(i)(B)(10).
    26.11.13 Control of Gasoline and Other Volatile Organic Compound Storage and Handling
    26.11.13.01Definitions8/11/9712/22/98, 63 FR 70667(c)(130).
    26.11.13.02Applicability and Exemption4/26/931/6/95, 60 FR 2018(c)(113)(i)(B)(3).
    26.11.13.03Large Storage Tanks8/1/8811/3/92, 57 FR 49651(c)(90)(i)(B)(12).
    26.11.13.04Loading Operations8/11/9712/22/98, 63 FR 70667(c)(132).
    26.11.13.05Gasoline Leaks from Tank Trucks2/15/931/6/95, 60 FR 2018(c)(112).
    26.11.13.06Plans for Compliance4/26/931/6/95, 60 FR 2018(c)(113)(i)(B)(5).
    26.11.13.07Control of VOC Emissions from Portable Fuel Containers1/21/026/29/04, 69 FR 38848(c)(184).
    26.11.14 Control of Emissions from Kraft Pulp Mills
    26.11.14.01Definitions1/8/01, 10/15/0111/7/01, 66 FR 56220(c)(170).
    26.11.14.02Applicability1/8/0111/7/01, 66 FR 56220(c)(170).
    Start Printed Page 27963
    26.11.14.06Control of Volatile Organic Compounds1/8/01, 10/15/0111/7/01, 66 FR 56220(c)(170).
    26.11.17 Requirements for Major New Sources and Modifications
    26.11.17.01Definitions11/24/039/20/04, 69 FR 5617052.1070(c)(191).
    26.11.17.02Applicability4/26/93, 10/2/002/12/01, 66 FR 976652.1070(c)(148).
    26.11.17.03General Conditions4/26/93, 10/2/002/12/01, 66 FR 976652.1070(c)(191).
    26.11.17.04Baseline for Determining Credit for Emission and Air Quality Offsets4/26/93, 10/2/002/12/01, 66 FR 976652.1070(c)(148).
    26.11.17.05Administrative Procedures4/26/93, 10/2/002/12/01, 66 FR 976652.1070(c)(148).
    26.11.19 Volatile Organic Compounds from Specific Processes
    26.11.19.01Definitions6/5/959/2/97, 62 FR 46199(c)(126). Note: On 5/13/1998 (63 FR 26462), EPA approved the revised definition of “major stationary source of VOC” with a State effective date of 5/8/1995 [(c)(128)].
    26.11.19.02Applicability, Determining Compliance, Reporting, and General Requirements5/4/98, 12/10/012/3/03, 68 FR 5228(c)(174), (c)(175). 1. Limited approval of paragraph .02G (9/4/98, 63 FR 47174) [(c)(131)( (c)(133)]. 2. On 2/27/03 (68 FR 9012), EPA approved a revised rule citation with a State effective date of 5/8/95 [(c)(182)(i)(D)].
    26.11.19.03Automotive and Light-Duty Truck Coating9/22/9711/5/98, 63 FR 59720(c)(140).
    26.11.19.04Can Coating8/1/8811/3/92, 57 FR 49651(C)(90)(i)(B)(12).
    26.11.19.05Coil Coating8/1/8811/3/92, 57 FR 49651(C)(90)(i)(B)(12).
    26.11.19.06Large Appliance Coating8/1/8811/3/92, 57 FR 49651(C)(90)(i)(B)(12).
    26.11.19.07Paper, Fabric, Vinyl and Other Plastic Parts Coating8/24/981/14/2000, 64 FR 2334(c)(147).
    26.11.19.07-1Control of VOC Emissions from solid Resin Decorative Surface Manufacturing6/15/986/17/99, 64 FR 32415(c)(142).
    26.11.19.08Metal Furniture Coating8/1/8811/3/92, 57 FR 49651(C)(90)(i)(B)(12).
    26.11.19.09Control of Volatile Organic Compounds (VOC) Emissions from cold and Vapor Degreasing6/5/958/4/97, 62 FR 41853(c)(123).
    26.11.19.10Flexographic and Rotogravure Printing6/5/959/2/97, 62 FR 46199(c)(126).
    26.11.19.11Control of Volatile Organic Compounds (VOC) Emissions from Sheet-Fed and Web Lithographic Printing6/5/959/2/97, 62 FR 46199(c)(126).
    26.11.19.12Dry Cleaning Installations9/22/979/2/98, 63 FR 46662(c)(131).
    26.11.19.13Miscellaneous Metal Coating5/8/9111/29/94, 59 FR 60908(c)(102)(i)(B)(6).
    26.11.19.13-1Aerospace Coating Operations10/2/00, 10/15/0111/7/01, 66 FR 56220(c)(169).
    26.11.19.13-2Control of VOC Emissions from Brake Shoe Coating Operations8/24/986/17/99, 64 FR 32415(c)(142).
    26.11.19.13-3Control of VOC Emissions from Structural Steel Coating Operations6/29/986/17/99, 64 FR 32415(c)(142).
    26.11.19.14Manufacture of Synthesized Pharmaceutical Products5/8/9111/29/94, 59 FR 60908(c)(102)(i)(B)(14).
    Start Printed Page 27964
    26.11.19.15Paint, Resin, and Adhesive Manufacturing and Adhesive Application5/4/98, 3/22/9910/28/99, 64 FR 57989(c)(145).
    26.11.19.16Control of VOC Equipment Leaks8/19/919/7/94, 59 FR 46180(c)(103)(i)(B)(9).
    26.11.19.17Control of Volatile Organic Compounds (VOC) Emissions from Yeast Manufacturing9/12/053/31/06, 71 FR 16237
    26.11.19.18Control of Volatile Organic Compounds (VOC) Emissions from Screen Printing and Digital Imaging6/10/021/15/03, 68 FR 1972(c)(177).
    26.11.19.19Control of Volatile Organic Compounds (VOC) Emissions from Expandable Polystyrene Operations10/2/005/7/01, 66 FR 22924(c)(156).
    26.11.19.21Control of Volatile Organic Compounds (VOC) Emissions from Commercial Bakery Ovens7/3/9510/15/97, 62 FR 53544(c)(125)(i)(B)(4).
    26.11.19.22Control of Volatile Organic Compounds (VOC) Emissions from Vinegar Generators8/11/979/23/99, 64 FR 41445(c)(137).
    26.11.19.23Control of Volatile Organic Compounds (VOC) Emissions from Vehicle Refinishing5/22/958/4/97, 62 FR 41853(c)(124).
    26.11.19.24Control of Volatile Organic Compounds (VOC) Emissions from Leather Coating Operations8/11/979/23/99, 64 FR 41445(c)(137).
    26.11.19.25Control of Volatile Organic Compounds from Explosives and Propellant Manufacturing8/11/971/26/99, 64 FR 3852(c)(141).
    26.11.19.26Control of Volatile Organic Compound Emissions from Reinforced Plastic Manufacturing8/11/978/19/99, 64 FR 45182(c)(139).
    26.11.19.27Control of Volatile Organic Compounds from Marine Vessel Coating Operations10/20/979/5/01, 66 FR 46379(c)(166).
    26.11.19.28Control of Volatile Organic Compounds from Bread and Snack Food Drying Operations10/2/005/7/01, 66 FR 22924(c)(157).
    26.11.19.29Control of Volatile Organic Compounds from Distilled Spirits Facilities10/2/00, 10/15/0111/7/01, 66 FR 56220(c)(160).
    26.11.19.30Control of Volatile Organic Compounds from Organic Chemical Production and Polytetrafluoroethylene Installations12/10/01, 11/11/026/3/03, 68 FR 33000(c)(176).
    26.11.19.31Control of Volatile Organic Compounds from Medical Device Manufacturing6/5/061/11/07, 72 FR 1289
    26.11.20 Mobile Sources
    26.11.20.02Motor Vehicle Emission Control Devices8/1/8811/3/92, 57 FR 49651(c)(90)(i)(B)(13) [as 26.11.20.06].
    26.11.20.03Motor Vehicle Fuel Specifications10/26/926/10/94, 59 FR 29957(c)(101)(i)(B)(3).
    26.11.20.04National Low Emission Vehicle Program3/22/9912/28/99, 64 FR 72564(c)(146).
    26.11.24 Stage II Vapor Recovery at Gasoline Dispensing Facilities
    26.11.24.01Definitions4/15/025/7/03, 68 FR 24363(c)(178).
    26.11.24.01-1Incorporation by Reference4/15/025/7/03, 68 FR 24363(c)(178).
    26.11.24.02Applicability, Exemptions, and Effective Date4/15/025/7/03, 68 FR 24363(c)(178).
    26.11.24.03General Requirements4/15/025/7/03, 68 FR 24363(c)(178).
    Start Printed Page 27965
    26.11.24.04Testing Requirements02/28/055/8/06, 71 FR 26688
    26.11.24.05Inspection Requirements2/15/936/9/94, 59 FR 29730(c)(107).
    26.11.24.06Training Requirements for Operation and Maintenance of Approved Systems2/15/936/9/94, 59 FR 29730(c)(107).
    26.11.24.07Record-Keeping and Reporting Requirements2/28/055/8/06, 71 FR 26688
    26.11.24.08Instructional Signs2/15/936/9/94, 59 FR 29730(c)(107).
    26.11.24.09Sanctions2/15/936/9/94, 59 FR 29730(c)(107).
    26.11.25 Control of Glass Melting Furnaces
    26.11.25.01Definitions10/5/9810/19/05, 70 FR 60738
    26.11.25.02Applicability and Exemptions10/5/9810/19/05, 70 FR 60738
    26.11.25.03Visible Emissions from Glass Melting Furnaces10/5/9810/19/05, 70 FR 60738
    26.11.25.04Particulate Matter Emissions from Glass Melting Furnaces10/5/9810/19/05, 70 FR 60738
    26.11.26 Conformity
    26.11.26.01Definitions5/15/95, 6/5/9512/9/98, 63 FR 67782(c)(136); definitions of Applicable implementation plan, Governor, State, and State air agency.
    26.11.26.03General Conformity5/15/95, 6/5/9512/9/98, 63 FR 67782(c)(136); current COMAR citation is 26.11.26.04.
    26.11.29 NOXReduction and Trading Program
    26.11.29.01Definitions5/1/001/10/01, 66 FR 1866(c)(154)(i)(B)(1).
    26.11.29.02Incorporation by Reference5/1/001/10/01, 66 FR 1866(c)(154)(i)(B)(1).
    26.11.29.03Scope and Applicability5/1/001/10/01, 66 FR 1866(c)(154)(i)(B)(1).
    26.11.29.04General Requirements for Affected Trading Sources5/1/001/10/01, 66 FR 1866(c)(154)(i)(B)(1).
    26.11.29.05NOX Allowance Allocations5/1/001/10/01, 66 FR 1866(c)(154)(i)(B)(1).
    26.11.29.06Compliance Supplement Pool5/1/001/10/01, 66 FR 1866(c)(154)(i)(B)(1).
    26.11.29.07Allowance Banking5/1/001/10/01, 66 FR 1866(c)(154)(i)(B)(1).
    26.11.29.08Emission Monitoring5/1/001/10/01, 66 FR 1866(c)(154)(i)(B)(1).
    26.11.29.09Requirements for New Sources and Set-Aside Pool11/24/033/22/04, 69 FR 13236(c)(184)(i)(C)(1)-(5).
    26.11.29.10Reporting5/1/001/10/01, 66 FR 1866(c)(154)(i)(B)(1).
    26.11.29.11Record Keeping5/1/001/10/01, 66 FR 1866(c)(154)(i)(B)(1).
    26.11.29.12End-of-Season Reconciliation5/1/001/10/01, 66 FR 1866(c)(154)(i)(B)(1).
    26.11.29.13Compliance Certification5/1/001/10/01, 66 FR 1866(c)(154)(i)(B)(1).
    26.11.29.14Penalties5/1/001/10/01, 66 FR 1866(c)(154)(i)(B)(1).
    26.11.29.15Requirements for Affected Nontrading Sources5/1/001/10/01, 66 FR 1866(c)(154)(i)(B)(1).
    26.11.30 Policies and Procedures Relating to Maryland's NOXReduction and Trading Program
    26.11.30.01Scope and Applicability5/1/001/10/01, 66 FR 1866(c)(154)(i)(B)(2).
    Start Printed Page 27966
    26.11.30.02Definitions5/1/001/10/01, 66 FR 1866(c)(154)(i)(B)(2).
    26.11.30.03Procedures Relating to Compliance Accounts and Overdraft Accounts5/1/001/10/01, 66 FR 1866(c)(154)(i)(B)(2).
    26.11.30.04Procedures Relating to General Accounts5/1/001/10/01, 66 FR 1866(c)(154)(i)(B)(2).
    26.11.30.05Allowance Banking5/1/001/10/01, 66 FR 1866(c)(154)(i)(B)(2).
    26.11.30.06Allowance Transfers5/1/001/10/01, 66 FR 1866(c)(154)(i)(B)(2).
    26.11.30.07Early Reductions5/1/001/10/01, 66 FR 1866(c)(154)(i)(B)(2).
    26.11.30.08Opt-In Procedures5/1/001/10/01, 66 FR 1866(c)(154)(i)(B)(2).
    26.11.30.09Allocation of Allowances6/19/0611/03/06, 71 FR 64647New column for 2008 allocations.
    26.11.32 Control of Emissions of Volatile Organic Compounds from Consumer Products
    26.11.32.01Applicability and Exemptions8/18/0312/9/03, 68 FR 68523(c)(185).
    26.11.32.02Incorporation by Reference8/18/0312/9/03, 68 FR 68523(c)(185).
    26.11.32.03Definitions8/18/0312/9/03, 68 FR 68523(c)(185).
    26.11.32.04Standards(General8/18/0312/9/03, 68 FR 68523(c)(185).
    26.11.32.05Standards—Requirements for Charcoal Lighter Materials8/18/0312/9/03, 68 FR 68523(c)(185).
    26.11.32.06Standards—Requirements for Aerosol Adhesives8/18/0312/9/03, 68 FR 68523(c)(185).
    26.11.32.07Standards—Requirements for Floor Wax Strippers8/18/0312/9/03, 68 FR 68523(c)(185).
    26.11.32.08Innovative Products—CARB Exemption8/18/0312/9/03, 68 FR 68523(c)(185).
    26.11.32.09Innovative Products—Department Exemption8/18/0312/9/03, 68 FR 68523(c)(185).
    26.11.32.10Administrative Requirements8/18/0312/9/03, 68 FR 68523(c)(185).
    26.11.32.11Reporting Requirements8/18/0312/9/03, 68 FR 68523(c)(185).
    26.11.32.12Variances8/18/0312/9/03, 68 FR 68523(c)(185).
    26.11.32.13Test Methods8/18/0312/9/03, 68 FR 68523(c)(185).
    26.11.32.14Alternative Control Plan (ACP)8/18/0312/9/03, 68 FR 68523(c)(185).
    26.11.32.15Approval of an ACP Application8/18/0312/9/03, 68 FR 68523(c)(185).
    26.11.32.16Record Keeping and Availability of Requested Information8/18/0312/9/03, 68 FR 68523(c)(185).
    26.11.32.17Violations8/18/0312/9/03, 68 FR 68523(c)(185).
    26.11.32.18Surplus Reductions and Surplus Trading8/18/0312/9/03, 68 FR 68523(c)(185).
    26.11.32.19Limited-Use Surplus Reduction Credits for Early Reformulations of ACP Products8/18/0312/9/03, 68 FR 68523(c)(185).
    26.11.32.20Reconciliation of Shortfalls8/18/0312/9/03, 68 FR 68523(c)(185).
    26.11.32.21Modifications to an ACP8/18/0312/9/03, 68 FR 68523(c)(185).
    26.11.32.22Cancellation of an ACP8/18/0312/9/03, 68 FR 68523(c)(185).
    26.11.32.23Transfer of an ACP8/18/0312/9/03, 68 FR 68523(c)(185).
    Start Printed Page 27967
    26.11.33 Architectural Coatings
    26.11.33.01Applicability and Exemptions3/29/045/12/05, 70 FR 24979
    26.11.33.02Test Methods—Incorporation by Reference3/29/045/12/05, 70 FR 24979
    26.11.33.03Definitions3/29/045/12/05, 70 FR 24979
    26.11.33.04General Standard—VOC Content Limits3/29/045/12/05, 70 FR 24979
    26.11.33.05VOC Content Limits3/29/045/12/05, 70 FR 24979
    26.11.33.06Most Restrictive VOC Limit2/28/0510/19/05, 70 FR 60740Addition of sections B(15) through B(19).
    26.11.33.07Painting Restrictions3/29/045/12/05, 70 FR 24979
    26.11.33.08Thinning3/29/045/12/05, 70 FR 24979
    26.11.33.09Rust Preventive Coatings3/29/045/12/05, 70 FR 24979
    26.11.33.10Coatings Not Listed in Regulation .052/28/0510/19/05, 70 FR 60740
    26.11.33.11Lacquers3/29/045/12/05, 70 FR 24979
    26.11.33.12Container Labeling Requirements2/28/0510/19/05, 70 FR 60740Deleted section K.
    26.11.33.13Recordkeeping Requirements2/28/0510/19/05, 70 FR 60740
    26.11.33.14Compliance Provisions and Test Methods3/29/045/12/05, 70 FR 24979
    11.14.08 Vehicle Emissions Inspection Program
    11.14.08.01Title1/02/9510/29/99, 64 FR 58340(c)(144).
    11.14.08.02Definitions1/02/95, 10/19/9810/29/99, 64 FR 58340(c)(144).
    11.14.08.03Applicability6/10/021/16/03, 68 FR 2208(c)(179).
    11.14.08.04Exemptions1/02/9510/29/99, 64 FR 58340(c)(144).
    11.14.08.05Schedule of the Program1/02/95, 12/16/9610/29/99, 64 FR 58340(c)(144).
    11.14.08.06Certificates6/10/021/16/03, 68 FR 2208(c)(179).
    11.14.08.07Extensions1/02/95, 10/19/9810/29/99, 64 FR 58340(c)(144).
    11.14.08.08Enforcement1/02/9510/29/99, 64 FR 58340(c)(144).
    11.14.08.09Inspection Standards6/10/021/16/03, 68 FR 2208(c)(179).
    11.14.08.10General Requirements for Inspection and Preparation for Inspection1/02/95, 12/16/96, 10/19/9810/29/99, 64 FR 58340(c)(144).
    11.14.08.11Idle Exhaust Emissions Test and Equipment Checks10/18/9810/29/99, 64 FR 58340(c)(144).
    11.14.08.11-1Transient Exhaust Emissions Test and Evaporative Purge Test Sequence12/16/96, 10/19/9810/29/99, 64 FR 58340(c)(144).
    11.14.08.12Evaporative Integrity Test, Gas Cap Leak Test, and On-Board Diagnostics Interrogation Procedures6/10/021/16/03, 68 FR 2208(c)(179).
    11.14.08.13Failed Vehicle and Reinspection Procedures1/02/9510/29/99, 64 FR 58340(c)(144).
    11.14.08.14Dynamometer System Specifications1/02/9510/29/99, 64 FR 58340(c)(144).
    11.14.08.15Constant Volume Sampler, Analysis System, and Inspector Control Specifications1/02/95, 10/19/9810/29/99, 64 FR 58340(c)(144).
    Start Printed Page 27968
    11.14.08.16Evaporative Test Equipment, Gas Cap Leak Test Equipment, and on-Board Diagnostics Interrogation Equipment Specifications6/10/021/16/03, 68 FR 2208(c)(179).
    11.14.08.17Quality Assurance and Maintenance—General Requirements1/02/9510/29/99, 64 FR 58340(c)(144).
    11.14.08.18Test Assurance Procedures1/02/9510/29/99, 64 FR 58340(c)(144).
    11.14.08.19Dynamometer Periodic Quality Assurance Checks1/02/9510/29/99, 64 FR 58340(c)(144).
    11.14.08.20Constant Volume Sampler Periodic Quality Assurance Checks1/02/9510/29/99, 64 FR 58340(c)(144).
    11.14.08.21Analysis System Periodic Quality Assurance Checks1/02/9510/29/99, 64 FR 58340(c)(144).
    11.14.08.22Evaporative Test Equipment, Gas Cap Leak Test Equipment and On-board Diagnostics Interrogation Equipment Periodic Quality Assurance Checks1/02/95, 10/19/9810/29/99, 64 FR 58340(c)(144).
    11.14.08.23Overall System Performance quality Assurance1/02/9510/29/99, 64 FR 58340(c)(144).
    11.14.08.24Control Charts1/02/9510/29/99, 64 FR 58340(c)(144).
    11.14.08.25Gas Specifications1/02/9510/29/99, 64 FR 58340(c)(144).
    11.14.08.26Vehicle Emissions Inspection Station1/02/9510/29/99, 64 FR 58340(c)(144).
    11.14.08.27Technician's Vehicle Report1/02//95, 10/19/9810/29/99, 64 FR 58340(c)(144).
    11.14.08.28Feedback Reports1/02/95, 10/19/9810/29/99, 64 FR 58340(c)(144).
    11.14.08.29Certified Emissions Technicians1/02/95, 12/16/9610/29/99, 64 FR 58340(c)(144).
    11.14.08.30Certified Emissions Repair Facility1/02/95, 12/16/9610/29/99, 64 FR 58340(c)(144).
    11.14.08.31On-Highway Emissions Test1/02/9510/29/99, 64 FR 58340(c)(144).
    11.14.08.32Fleet Inspection Station1/02/95, 12/16/96, 10/19/9810/29/99, 64 FR 58340(c)(144).
    11.14.08.33Fleet Inspection Standards1/02/9510/29/99, 64 FR 58340(c)(144).
    11.14.08.34Fleet Inspection and Reinspection Methods1/02/9510/29/99, 64 FR 58340(c)(144).
    11.14.08.35Fleet Equipment and Quality Assurance Requirements1/02/9510/29/99, 64 FR 58340(c)(144).
    11.14.08.36Fleet Personnel Requirements1/02/9510/29/99, 64 FR 58340(c)(144).
    11.14.08.37Fleet Calibration Gas Specifications and Standard Reference Materials1/02/9510/29/99, 64 FR 58340(c)(144).
    11.14.08.38Fleet Record-Keeping Requirements1/02/9510/29/99, 64 FR 58340(c)(144).
    11.14.08.39Fleet Fees1/02/9510/29/99, 64 FR 58340(c)(144).
    11.14.08.40Fleet License Suspension and Revocation1/02/9510/29/99, 64 FR 58340(c)(144).
    11.14.08.41Audits1/02/9510/29/99, 64 FR 58340(c)(144).
    11.14.08.42Fleet Inspection After 19981/02/95, 2/16/96, 10/19/9810/29/99, 64 FR 58340(c)(144).
    03.03.05 Motor Fuel Inspection
    [Contingency SIP Measure]
    03.03.05.01Definitions12/18/951/30/96, 61 FR 2982(c)(101)(i)(B)(4); Approved as a contingency SIP measure as part of the CO Maintenance Plans for Baltimore and DC. [(c)(117) and (c)(118)].
    Start Printed Page 27969
    03.03.05.01-1Standard Specifications for Gasoline12/18/951/30/96, 61 FR 2982
    03.03.05.02-1Other Motor Vehicle Fuels10/26/926/10/94, 58 FR 29957
    03.03.05.05Labeling of Pumps12/18/951/30/96, 61 FR 2982
    03.03.05.08Samples and Test Tolerance10/26/926/10/94, 58 FR 29957
    03.03.05.15Commingled Products10/26/926/10/94, 58 FR 29957
    03.03.06 Emissions Control Compliance
    [Contingency SIP Measure]
    03.03.06.01Definitions12/18/951/30/96, 61 FR 2982(c)(101)(i)(B)(5); Approved as a contingency SIP measure as part of the CO Maintenance Plans for Baltimore and DC. [(c)(117) and (c)(118)].
    03.03.06.02Vapor Pressure Determination10/26/926/10/94, 58 FR 29957
    03.03.06.03Oxygen Content Determination12/18/951/30/96, 61 FR 2982
    03.03.06.04Registration10/26/926/10/94, 58 FR 29957
    03.03.06.05Recordkeeping10/26/926/10/94, 58 FR 29957
    03.03.06.06Transfer Documentation12/18/951/30/96, 61 FR 2982
    TM Technical Memoranda
    TM81-04Procedures for Observing and Evaluating Visible Emissions from Stationary Sources5/1/816/18/82, 47 FR 26381(c)(67).
    TM83-05Stack Test Methods for Stationary Sources6/1/832/23/85, 50 FR 7595(c)(80).
    TM91-01 [Except Methods 1004A through E]Test Methods and Equipment Specifications for Stationary Sources11/2/989/7/01, 66 FR 46727(c)(153)(i)(D)(5) (Supplement 3 is added).

    (d) EPA approved state source-specific requirements.

    Name of sourcePermit No./typeState effective dateEPA approval dateAdditional explanation
    (PEPCO)—Chalk Point Units #1 and #2#49352 Amended Consent Order1/27/784//2/79, 44 FR 1919252.1100(c) (22); FRN republished 5/3/79 (44 FR 25840).
    Beall Jr./Sr. High SchoolConsent Order1/30/793/18/80, 45 FR 1714452.1100(c)(26).
    Mt. Saint Mary's CollegeConsent Order3/8/793/18/80, 45 FR 1714452.1100(c)(26).
    Potomac Electric Power Company (PEPCO)—Chalk PointSecretarial Order7/19/799/3/80, 45 FR 5834052.1100(c)(34).
    Maryland Slag CoConsent Agreement (Order)10/31/809/8/81, 41 FR 4475752.1100(c)(49).
    Northeast Maryland Waste Disposal AuthoritySecretarial Order11/20/817/7/82, 47 FR 2953152.1100(c)(65) (Wheelabrator-Frye, Inc.).
    Northeast Maryland Waste Disposal Authority and Wheelabrator-Frye, Inc. and the Mayor and City Council of Baltimore and BEDCO Development CorpSecretarial Order2/25/838/24/83, 45 FR 5517952.1100(c)(70) (Shutdown of landfill for offsets).
    Westvaco CorpConsent Order9/6/83, Rev. 1/26/8412/20/84, 49 FR 4945752.1100(c)(74).
    Potomac Electric Power Company (PEPCO)Administrative Consent Order9/13/9912/15/00, 65 FR 7841652.1100(c)(151).
    Thomas Manufacturing Corp.Consent Decree2/15/0111/15/01, 66 FR 5739552.1100(c)(167).
    Start Printed Page 27970
    Constellation Power Source Generation, Inc.—Brandon Shores Units #1 & 2; Gould Street Unit #3; H.A. Wagner Units #1, 2, 3 & 4; C.P. Crane Units #1 & 3; and Riverside Unit #4Consent Order and NOX RACT Averaging Plan Proposal4/25/012/27/02, 67 FR 889752.1100(c)(168).
    Kaydon Ring and Seal, IncConsent Order3/5/048/31/04, 69 FR 53002(c)(190); SIP effective date is 11/1/04.
    Perdue Farms, IncConsent Order2/1/051/11/07, 72 FR 129152.1070(d)(1).

    (e) EPA-approved nonregulatory and quasi-regulatory material.

    Name of non-regulatory SIP revisionApplicable geographic areaState submittal dateEPA approval dateAdditional explanation
    Base Year Emissions InventoryMetropolitan Baltimore Ozone Nonattainment Area 19909/20/9510/30/95, 60 FR 5532152.1075(a) CO.
    1990 Base Year Emissions InventoryMetropolitan Washington Ozone Nonattainment Area3/21/94, 10/12/951/30/96, 61 FR 293152.1075(b), CO.
    1990 Base Year Emissions InventoryAll ozone nonattainment areas3/21/949/27/96, 61 FR 5071552.1075(c), VOC, NOX, CO.
    1990 Base Year Emissions InventoryKent & Queen Anne's Counties3/21/944/23/97, 62 FR 1967652.1075(d), VOC, NOX, CO.
    1990 Base Year Emissions InventoryMetropolitan Washington Ozone Nonattainment Area3/21/944/23/97, 62 FR 1967652.1075(e), VOC, NOX, CO.
    1990 Base Year Emissions InventoryMetropolitan Washington Ozone Nonattainment Area12/24/977/8/98, 63 FR 3685452.1075(f), VOC, NOX.
    1990 Base Year Emissions InventoryMetropolitan Baltimore Ozone Nonattainment Area12/24/972/3/00, 63 FR 524552.1075(g), VOC, NOX.
    1990 Base Year Emissions InventoryPhiladelphia-Wilmington-Trenton Ozone Nonattainment Area (Cecil County)12/24/97, 4/29/98, 12/21/99, 12/28/002/3/00, 63 FR 5252 9/19/01, 66 FR 4480952.1075(h), VOC, NOX.
    15% Rate of Progress PlanPhiladelphia-Wilmington-Trenton Ozone Nonattainment Area (Cecil County)7/12/95, #95-207/29/97, 62 FR 4045752.1076(a).
    Stage II Vapor Recovery Comparability PlanWestern Maryland & Eastern Shore Counties11/5/9712/9/98, 63 FR 6778052.1076(b).
    15% Rate of Progress PlanMetropolitan Baltimore Ozone Nonattainment Area10/7/982/3/00, 65 FR 524552.1076(c).
    15% Rate of Progress PlanMetropolitan Washington Ozone Nonattainment Area5/5/987/19/00, 65 FR 4468652.1076(d).
    Post-1996 Rate of Progress Plan & contingency measuresPhiladelphia-Wilmington-Trenton Ozone Nonattainment Area (Cecil County)12/24/97, 4/24/98, 8/18/98, 12/21/99, 12/28/00, 3/8/042/3/00, 63 FR 5252 9/19/01, 66 FR 44809 4/15/04, 69 FR 1993952.1076(f). 52.1076(f)(3).
    Ozone Attainment PlanPhiladelphia-Wilmington-Trenton Ozone Nonattainment Area (Cecil County)4/29/98, 8/18/98, 12/21/99, 12/28/00, 8/31/0110/29/01, 66 FR 5457852.1076(h).
    9/2/0310/27/03, 68 FR 61103
    Transportation Conformity BudgetsPhiladelphia-Wilmington-Trenton Ozone Nonattainment Area (Cecil County)4/29/98, 8/18/98, 12/21/99, 12/28/0010/29/01, 66 FR 5457852.1076(i).
    Post-1996 Rate of Progress Plan & contingency measuresMetropolitan Baltimore Ozone Nonattainment Area12/24/97, 4/24/98, 8/18/98, 12/21/99, 12/28/009/26/01, 66 FR 4910852.1076(j).
    Ozone Attainment PlanMetropolitan Baltimore Ozone Nonattainment Area4/29/98, 8/18/98, 12/21/99, 12/28/00, 8/31/0110/30/01, 66 FR 5466652.1076(k).
    9/2/0310/27/03, 68 FR 6110352.1076(k).
    Start Printed Page 27971
    Mobile budgetsMetropolitan Baltimore Ozone Nonattainment Area8/31/01 9/2/0310/30/01, 66 FR 54666 10/27/03, 68 FR 6110352.1076(l)
    Mobile budgets (2005)Metropolitan Baltimore Ozone Nonattainment Area Piladelphia-Wilmington-Trenton Ozone Nonattainment Area (Cecil County)9/2/0310/27/03, 68 FR 6110352.1076(m).
    Mobile budgets (2005 Rate of Progress Plan)Metropolitan Baltimore Ozone Nonattainment Area11/3/032/13/04, 69 FR 713352.1076(n).
    Extension for incorporation of the on-board diagnostics (OBD) testing program into the Maryland I/M SIPAll ozone nonattainment areas7/9/021/16/03, 68 FR 220852.1078(b).
    Photochemical Assessment Monitoring Stations (PAMS) ProgramMetropolitan Baltimore and Metropolitan Washington Ozone Nonattainment Areas3/24/949/11/95, 60 FR 4708152.1080.
    Consultation with Local Officials (CAA Sections 121 & 127)All nonattainment & PSD areas10/8/814/8/82, 47 FR 1514052.1100(c)(63).
    Lead (Pb) SIPCity of Baltimore10/23/802/23/82, 47 FR 783552.1100(c)(60), (61).
    TM#90-01-“Continuous Emission Monitoring Policies and Procedures”-October 1990Statewide9/18/912/28/96, 61 FR 741852.1100(c)(106); approved into SIP as “additional material”, but not IBR'd.
    Carbon Monoxide Maintenance PlanCity of Baltimore—Regional Planning District 1189/20/9510/31/95, 60 FR 5532152.1100(c)(117).
    7/15/0404/04/05, 70 FR 16958Revised Carbon Monoxide Maintenance Plan Base Year Emissions Inventory using MOBILE6.
    Carbon Monoxide Maintenance PlanMontgomery County Election Districts 4, 7, and 13; Prince Georges County Election Districts 2, 6, 16, 17 and 1810/12/951/30/96 61 FR 293152.1100(c)(118).
    3/3/0404/04/05, 70 FR 16958Revised Carbon Monoxide Maintenance Plan Base Year Emissions Inventory using MOBILE6.
    Ozone Maintenance PlanKent and Queen Anne's Counties2/4/0410/21/04, 69 FR 6176652.1100(c)(187); SIP effective date is 11/22/04.
    1996-1999 Rate-of-Progress Plan SIP and the Transportation Control Measures (TCMs) in Appendix HWashington DC 1-hour ozone nonattainment area12/20/97, 5/20/995/16/05, 70 FR 25688Only the TCMs in Appendix H of the 5/20/1999 revision. 1999 motor vehicle emissions budgets of 128.5 tons per day (tpy) of VOC and 196.4 tpy of NOX.
    1990 Base Year Inventory RevisionsWashington DC 1-hour ozone nonattainment area9/2/03, 2/24/045/16/05, 70 FR 25688
    1999-2005 Rate-of-Progress Plan SIP Revision and the Transportation Control Measures (TCMs) in Appendix JWashington DC 1-hour ozone nonattainment area9/2/03, 2/24/045/16/05, 70 FR 25688Only the TCMs in Appendix J of the 2/24/2004 revision. 2002 motor vehicle emissions budgets (MVEBs) of 125.2 tons per day (tpy) for VOC and 290.3 tpy of NOX, and, 2005 MVEBs of 97.4 tpy for VOC and 234.7 tpy of NOX.
    Start Printed Page 27972
    VMT Offset SIP RevisionWashington DC 1-hour ozone nonattainment area9/2/03, 2/24/045/16/05, 70 FR 25688
    Contingency Measure PlanWashington, DC Area9/2/03, 2/24/045/16/05, 70 FR 25688
    1-hour Ozone Modeled Demonstration of AttainmentWashington DC 1-hour ozone nonattainment area9/2/03, 2/24/045/16/05, 70 FR 25688
    Attainment Demonstration and Early Action Plan for the Washington County Ozone Early Action Compact AreaWashington County12/20/04, 2/28/058/17/05, 70 FR 48283
    1-hour Ozone Attainment PlanWashington DC 1-hour ozone nonattainment area9/2/2003, 2/24/200411/16/05, 70 FR 69440
    8-hour Ozone Maintenance Plan for the Kent and Queen Anne's AreaKent and Queen Anne's Counties05/2/06, 05/19/0612/22/06, 71 FR 76920
    End Supplemental Information

    [FR Doc. E7-9518 Filed 5-17-07; 8:45 am]

    BILLING CODE 6560-50-P

Document Information

Effective Date:
5/18/2007
Published:
05/18/2007
Department:
Environmental Protection Agency
Entry Type:
Rule
Action:
Final rule; Notice of administrative change.
Document Number:
E7-9518
Dates:
This action is effective May 18, 2007.
Pages:
27957-27972 (16 pages)
Docket Numbers:
MD201-3117, FRL-8313-2
Topics:
Air pollution control, Carbon monoxide, Environmental protection, Incorporation by reference, Intergovernmental relations, Lead, Nitrogen dioxide, Ozone, Particulate matter, Reporting and recordkeeping requirements, Sulfur oxides, Volatile organic compounds
PDF File:
E7-9518.Pdf
CFR: (1)
40 CFR 52.1070