E9-119. Approval and Promulgation of Implementation Plans; Texas; Control of Emissions of Nitrogen Oxides (NOX  

  • Start Preamble

    AGENCY:

    Environmental Protection Agency (EPA).

    ACTION:

    Final rule.

    SUMMARY:

    The EPA is finalizing approval of revisions to the Texas State Implementation Plan (SIP). We are approving the rules in 30 TAC Chapter 117 that the State submitted on May 30, 2007, concerning control of emissions of NOX from cement kilns operating in Bexar, Comal, Ellis, Hays, and McLennan Counties. We are approving the nonsubstantive renumbering of the rules for all five counties. We also are approving the substantive changes to the rules for Ellis County, based on a determination that the rules for Ellis County meet the NOX Reasonably Available Control Technology (RACT) requirements for cement kilns operating in the Dallas Fort Worth (D/FW) 1997 8-hour ozone nonattainment area. We are taking this action under section 110 and part D of the Federal Clean Air Act (the Act, or CAA).

    DATES:

    This rule will be effective on February 13, 2009.

    ADDRESSES:

    The EPA has established a docket for this action under Docket ID No. EPA-R06-OAR-2007-0523. All documents in the docket are listed on the www.regulations.gov Web site. Although listed in the index, some information is not publicly available, e.g., Confidential Business Information or other information whose disclosure is restricted by statute. Certain other material, such as copyrighted material, is not placed on the Internet and will be publicly available only in hard copy form. Publicly available docket materials are available either electronically through www.regulations.gov or in hard copy at the Air Planning Section (6PD-L), Environmental Protection Agency, 1445 Ross Avenue, Suite 700, Dallas, Texas 75202-2733. The file will be made available by appointment for public inspection in the Region 6 FOIA Review Room between the hours of 8:30 a.m. and 4:30 p.m. weekdays except for legal holidays. Contact the person listed in the FOR FURTHER INFORMATION CONTACT paragraph below to make an appointment. If possible, please make the appointment at least two working days in advance of your visit. There will be a 15 cent per page fee for making photocopies of documents. On the day of the visit, please check in at the EPA Region 6 reception area at 1445 Ross Avenue, Suite 700, Dallas, Texas.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Mr. Alan Shar, Air Planning Section (6PD-L), Environmental Protection Agency, Region 6, 1445 Ross Avenue, Suite 700, Dallas, Texas 75202-2733, telephone (214) 665-6691, fax (214) 665-7263, e-mail address shar.alan@epa.gov.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Throughout this document “we,” “us,” and “our” refer to EPA.

    Table of Contents

    I. Background

    A. What are we approving?

    B. Who submitted written comments to us?

    C. How are we responding to those written comments?

    D. What sections of the May 30, 2007 submittal will become part of Texas SIP?

    E. What sections of the May 30, 2007 submittal will not become a part of Texas SIP?

    F. What Texas Counties will this rulemaking affect?

    G. What are the NOXcontrol emissions requirements that we approved for Texas under the 1-hour ozone SIP?

    H. What are the NOXcontrol emissions requirements that we are approving for Texas under the 8-hour ozone SIP?

    I. What are the compliance schedules for NOXemissions from cement kilns that we are approving?

    II. Final Action

    III. Statutory and Executive Order Reviews

    I. Background

    A. What are we approving?

    The EPA approved 30 TAC, Chapter 117, NOX cement kilns rules at 69 FR 15681 published on March 26, 2004, as NOX control emissions requirements for Texas under the 1-hour ozone SIP. On May 30, 2007, TCEQ submitted rule revisions to 30 TAC, Chapter 117, “Control of Air Pollution from Nitrogen Compounds,” as a revision to the Texas SIP. On July 11, 2008 (73 FR 39911), we proposed approval of the May 30, 2007 Start Printed Page 1928submittal. Today, we are finalizing our July 11, 2008, proposed approval.

    In this rulemaking, we are approving the nonsubstantive renumbering of the rules for cement kilns operating in Bexar, Comal, Ellis, Hays, and McLennan Counties. We are approving the substantive changes to the rules for cement kilns operating in Ellis County as meeting the Act's RACT requirements for NOX emissions for the cement kiln source category in the D/FW 1997 8-hour ozone nonattainment area.

    The State's adopted source cap calculation for the cement plants in Ellis County includes all kilns in operation at the three impacted accounts, i.e., Ash Grove, Texas, L.P. (AG); TXI Operations, L.P. (TXI); and Holcim, L.P. (Holcim). No operating kiln in Ellis County is exempt from the source cap. The State chose 1.7 lb NOX/ton of clinker for dry preheater-precalciner or precalciner kilns and 3.4 lb NOX/ton of clinker for wet kilns, as the emission factors for calculating the source cap for the RACT rule. The NOX source cap for cement manufacturing plants in Ellis County, Texas is calculated by (a) multiplying the average annual production rate in tons plus one standard deviation for the calendar years 2003, 2004, and 2005 from all wet kilns by 3.4 pound NOX/ton, (b) multiplying the average annual production rate in tons plus one standard deviation for the calendar years 2003, 2004, and 2005 from all dry kilns by 1.7 pound NOX/ton, and (c) adding the computed products in “a” and “b” together and dividing the sum by ((2000 (pounds/ton) x (365 (days/year)). Thus, producing a total allowable NOX limit, in tons per day, on a 30-day rolling average basis as a cap not to be exceeded. The source cap only applies during the D/FW ozone season (March 1-October 31). See 117.3123(b).

    The rule provides multiple layers of flexibility by: (i) Providing for one NOX limit during the ozone season (March 1 through October 31), and another NOX limit during the non-ozone season (November 1 through end-of February) within the D/FW area; (ii) incorporating actual production rates that were provided by the affected companies to the State, then adding one standard deviation to the production rates as a part of rule development, for source cap allowance determination to account for production variability; (iii) not mandating a specific post combustion control technology; (iv) allowing the source to decide its method of compliance with the source cap; (v) determining compliance with the source cap on a 30-day rolling average basis; and (vi) including all types of existing kilns. Therefore, multiple layers of flexibility have been built into the rule for compliance purposes.

    As stated in our proposal, EPA has defined RACT as the lowest emission limitation that a particular source can meet by applying a control technique that is reasonably available considering technological and economic feasibility. See 44 FR 53761, September 17, 1979. Ozone nonattainment areas classified as moderate or above must meet RACT requirements as provided in sections 182(b)(2) and 182(f) of the Act. These two sections, taken together, establish the requirements for Texas to submit a NOX RACT regulation for cement kilns (a major source of NOX) in ozone nonattainment areas classified as moderate (such as D/FW) and above. Section 183(c) of the Act provides that we will issue technical documents, which identify alternative controls for stationary sources of NOX. The EPA publishes the NOX related Alternative Control Techniques (ACTs) documents for this purpose. The information in the ACT documents is generated from literature sources and contacts, control equipment vendors, EPA papers, engineering firms, and Federal, State, and local regulatory agencies. States can use information in the EPA ACTs to develop their RACT regulations. For a listing of EPA's ACT-related documents, including the ACT document for Cement Manufacturing, see http://www.epa.gov/​ttn/​naaqs/​ozone/​ctg_​act/​index.htm (URL dated April 22, 2008).

    The public comment period for our 73 FR 39911 proposal expired on August 11, 2008. We received written comments during the public comment period and we respond to those comments below.

    B. Who submitted written comments to us?

    We received written comments on our July 11, 2008 (73 FR 39911) proposal from AG, TXI, and Holcim during the public comment period. Holcim's comments were submitted on this proposed action and on the proposed action to conditionally approve the D/FW area's 1997 8-hour ozone attainment demonstration SIP.

    C. How are we responding to those written comments?

    Our responses to those written comments received are as follows:

    Comment #1: AG indicated that the applicable source cap in the rule for Ellis County is achievable, AG intends to comply with the source cap limit, and supports its approval by EPA.

    Response to Comment #1: We appreciate the AG's statement that it intends to comply with the source cap limit in the rule.

    Comment #2: AG, TXI, and Holcim claim that the rule for Ellis County exceeds RACT and has negligible value to air quality planning. The State's photochemical modeling demonstrates that NOX reductions from the cement plants would not have a measurable impact on the critical ozone monitors in the D/FW area. Thus, the stringent emission limitation is not a necessary component of the Texas SIP. TCEQ has not performed any analysis indicating that a high level of reduction of NOX emissions from the Ellis County cement kilns would result in the D/FW area coming into compliance with the 1997 8-hour ozone standard.

    Response to Comment #2: As discussed previously, RACT is a requirement of section 182 of the Act, and, regardless of whether the controls are necessary for attainment of the 1997 8-hour ozone NAAQS in the D/FW ozone nonattainment area, the SIP must include rules that meet the VOC and NOX RACT requirements of the Act. In Appendix J of the D/FW attainment demonstration SIP submission, entitled “RACT Analysis,” Texas identifies (1) all Control Techniques Guidelines (CTG) source categories of VOC and NOX emissions within the D/FW area; (2) all non-CTG major sources of VOC and NOX emissions; (3) the state regulation that implements or exceeds RACT for each applicable CTG source category or non-CTG major emission source; and describes the basis for concluding that these regulations fulfill RACT. TCEQ in Appendix J, pages J-3 to J-5 and Table J-1, specifically says that State rules that were consistent with or more stringent than the current control technologies and methodologies implemented in other moderate nonattainment areas were also determined to fulfill RACT requirements for the D/FW area. Texas views the cement kiln rules to be RACT for the D/FW area. It is not appropriate for EPA to question a State's choice of RACT control, as long as the statutory requirements of the Act are met. Florida Power & Light Co. v. EPA, 650 F.2d 570 (5th Cir. 1981). Moreover, States may adopt regulations that are more stringent than those required under the Act. See section 116 of the Act. To meet the statutory requirements, states are to look at available controls to conclude whether they are reasonably available for a specific source or source category. Furthermore, a State is to evaluate RACT for a source or source category by examining existing EPA guidance documents as well as other available information, e.g., EPA's BACT/RACT/Start Printed Page 1929LAER Clearinghouse, ACTs. RACT can change over time as new technology becomes available or the cost of existing technology adjusts. Today's RACT determination for a source category can be more stringent than a previous determination and thus controls previously considered “beyond RACT” could be considered RACT for sources now.

    We disagree that the rules for cement kilns in the D/FW area will have a negligible value to the area's air quality planning. The rules should result in 9.7 tons per day (TPD) of reduction in NOX emissions for the D/FW area, which is a significant improvement. See section 9 at 73 FR 39914 of our proposal. The EPA has reviewed the impact of emission reductions at the cement kilns in the D/FW area and determined that such reductions are beneficial to reducing ozone levels in the D/FW nonattainment area especially in much of Tarrant and Parker Counties.

    Today's action only concerns approving the nonsubstantive renumbering of the NOX cement kiln rules into the Texas SIP, and approving the substantive changes to the NOX cement kiln rules for Ellis County as meeting the Act's NOX RACT requirement. Therefore, any comments on the State's choices of control strategies in the D/FW area's attainment demonstration SIP are not relevant. In a separate proposed action published on July 14, 2008 at 73 FR 40203, EPA has taken comment on whether the cement kilns rule, in combination with the other State and Federal Measures, will result in attainment of the 1997 8-hour ozone NAAQS, and we will respond to Holcim's comments on these issues in a final action on that proposal. Additionally, we note that EPA is required to approve a SIP revision if it meets the Act's requirements, and cannot second guess the State's choices if the plan meets the minimum requirements of the Act. The Act assigns to the states initial and primary responsibility for formulating a plan to achieve the NAAQS. It is up to the State to prepare SIPs, which contain specific pollution control measures. The EPA is charged with evaluating the SIP revision submittal, and if it meets the minimum statutory criteria, the EPA must approve it. Train v. NRDC, 421 U.S. 60 (1975). It is not EPA's role to rule out the State's choice of components of its SIP submittal so long as the plan is adequate to meet the standards mandated by EPA. See Train v. NRDC at 79-80, and see Union Electric v. EPA, 427 U.S. 246 (1976). The EPA disapproves a SIP submittal only if it fails to meet the minimum statutory requirements. Seabrook v. Costle, 659 F.2d 1349 (5th Cir. 1981). A state may impose stricter limitations than the Act requires. See section 116 of the Act; Union Electric at 265.

    Comment #3: TXI states that Table 5, section 9 of EPA's proposal fails to mention the alternative NOX control options allowed under the Texas 1-hour ozone NOX SIP will be available to Ellis County cement kilns during the non-ozone season.

    Response to Comment #3: While Table 5, section 9 of EPA's proposal is factually correct, it does not specifically mention the alternative NOX control option. TCEQ removed these options for cement kilns in Ellis County during the D/FW area's ozone season; EPA recognizes these compliance options are available during the non-ozone season (November 1st through the end of February). For the other four counties, which are not a part of the D/FW 8-hour ozone nonattainment area, cement kilns' NOX alternative control options continue to remain in effect year round. See section 117.3110.

    Comment #4: TXI and Holcim commented that improvement in the D/FW ozone situation should come from mobile sources, not the cement kilns.

    Response to Comment #4: This comment is not relevant to today's action because this action solely reviews the Ellis County cement kiln rules for purposes of the NOX RACT requirement of the Act. Holcim provided the same comment, however, on our proposed action to conditionally approve the D/FW 1997 8-hour ozone attainment demonstration SIP. We will address this comment in the final rulemaking action on that SIP. See the response to comment #2 of this document for more detail.

    Comment #5: TXI and Holcim expressed support for TCEQ not adopting the “high control” option for the Ellis County kilns, due to technical issues associated with the Selective Catalytic Reduction (SCR), and Low Temperature Oxidation (LoTOx) technologies. They further claim that neither SCR nor LoTOx technology constitutes RACT for the control of NOX from the Midlothian Cement kilns.

    Response to Comment #5: We agree that the current State-adopted level of NOX control for cement kilns in the D/FW area meets the RACT requirement for these sources at this time. We note, however, that air pollution control technology continues to advance and the State may need to consider additional NOX controls at cement plants as it develops the SIP required for the 2008-revised ozone standard.

    Comment #6: TXI commented that the NOX emission factors used in the source cap equation are possibly the lowest specifications adopted by a state agency in the United States because the selected emission specification for the preheater/precalciner kilns of 1.7 lb NOX/ton of clinker represents a significant reduction from NOX specification of 1.95 lb NOX/ton of clinker that has been selected as BACT in recent permitting actions for new PH/PC kilns. Adoption of these very low NOX emission specifications in the source cap equation is extremely aggressive.

    Response to Comment #6: We agree that these levels are more aggressive than levels previously included in certain permits issued by the State. We have concluded that, at a minimum, these levels are consistent with RACT. While the commenter implies (but does not directly allege) that the levels are beyond RACT, the Act does not preclude the State from adopting controls that are more stringent than the minimum level required.

    We note that this is not the first time TCEQ has adopted a rule in Chapter 117 to meet RACT that is more stringent than past permits' BACT decisions. We recognize that compliance with the levels in the Texas rules will require significant effort from the cement plant owners and operators.

    Comment #7: TXI and Holcim state that adoption of the source cap equation is inequitable and does not allow them to have a significant production increase. Holcim claims that over 60% of the total NOX reductions anticipated from the source cap requirement will be from Holcim's two kilns, despite the fact that there are eight other cement kilns operating in Ellis County. Holcim comments that TCEQ has unfairly targeted Holcim as a source of emission reductions in Ellis County. TXI finds the rule to be retroactive because the source cap is based upon the average production for 2003, 2004, and 2005. This figure allegedly does not include the increase in production allowed by a permit issued in late 2005. To meet the source cap, TXI may have to shutdown its wet kilns while operating its dry kiln.

    Response to Comment #7: The primary role of the statutory RACT requirement is to impose controls upon existing facilities and equipment. RACT has been a requirement of the Act since 1977. Congress through the 1977 Clean Air Act Amendments imposed stricter minimum requirements by placing RACT limitations on nonattainment areas. CAA Section 172(b)(3), 42 U.S.C. 7502(b)(3) (1977). The use of the term Start Printed Page 1930“retroactive” by TXI is misleading in that the RACT controls will apply to TXI's existing sources, but TXI is provided sufficient time to install the controls by a date well after TCEQ has promulgated the RACT regulations.

    As discussed previously in response to comment #2 of this document, EPA cannot reject the State regulations because they may apply in an inequitable manner. While TXI alleges it may have to shut down some of its units to operate others, the Act does not preclude the State from adopting controls that are more stringent than the minimum level required. The Act gives the States exclusive control in selecting which sources to regulate and to what degree, and EPA does not have authority to second guess the State's choices so long as the programs adopted meet the minimum statutory requirements. See Union Electric v. EPA, 427 U.S. 246 (1976).

    Comment #8: Holcim commented that the ERG cement kiln study cannot be relied upon by TCEQ to establish the NOX controls imposed on the Ellis County cement kilns in the source cap rule. Holcim contends that the ERG cement kiln study is internally inconsistent, inaccurate in its assessment of available NOX control technologies for the Ellis County cement kilns, incomplete in that it did not fully analyze the impacts of kiln feedstocks on the viability of add-on NOX control technologies or address other tasks included in the Scope of Work, and is unreliable as a basis for NOX controls for the Ellis County kilns. It inaccurately estimates the level of reductions achievable using SNCR on some of the Ellis County kilns. Holcim commented that the ERG Final Report fails to include retrofitting costs such as new ID fans for all kilns necessary for utilizing SCR and LoTOx systems. Holcim further claims that the limestone and raw materials used in Ellis County kilns are different from the limestone, and raw materials used by other plants in the world, and deficiencies in the ERG Report is not scientifically or factually valid, and is not a reliable basis for TCEQ's adoption of the Source Cap Rule or EPA's approval of TCEQ's SIP. Holcim also incorporates by reference the comments on the ERG Final Report that were submitted to the State.

    Response to Comment #8: As an initial matter, we note that we cannot second guess the State's conclusions, so long as our review determines that the rules developed meet the minimum statutory requirements. Holcim appears to be claiming that the rules are too stringent because they are based on a study with which Holcim finds fault. However, even if such claim were true, we cannot disapprove the rules when they meet the minimum statutory requirements for RACT. Any requirement beyond the basic RACT level of control is not a basis for EPA to disapprove the rule, as the CAA leaves the choice to the State to determine whether to go beyond the minimum statutory requirements of the Act.

    The referenced study can be found in Appendix I of the D/FW 1997 8-hour ozone attainment demonstration SIP revision submittal and is available on the TCEQ's Web site at www.tceq.state.tx.us/​implementation/​air/​sip/​BSA_​settle.html. The ERG, Inc. prepared the Report, and it is entitled “Assessment of NOX Emissions Reduction Strategies for Cement Kilns—Ellis County: Final Report,” dated July 14, 2006. The State relied upon it as well as all other available documentation to determine what should be RACT for the cement kilns.

    This Report was prepared because of a study conducted on behalf of TCEQ pursuant to an April 22, 2005, settlement agreement in a lawsuit brought against EPA by Blue Skies Alliance and others. The TCEQ, the Portland Cement Association, several counties, and others were permitted by the Court to intervene. The Portland Cement Association represented Holcim's interests in the lawsuit. The Settlement Agreement was filed with the Federal District Court for the Northern District of Texas in June 2005.

    Pursuant to paragraph A.3.b. of the Settlement Agreement entitled, “Cement Kiln Control Technology Study,” TCEQ was required to meet with Plaintiffs, EPA, and the Portland Cement Association to review and comment upon the proposed scope of work to contract with a consultant to perform a cement kiln study to evaluate the potential availability of new air pollution control technologies for cement kilns in the D/FW area. The proposed scope of work also was to include consideration of SCR and to evaluate and establish what type of controls may be technically and economically applied to the three cement plants in Ellis County. Holcim participated in the meetings on the proposed scope of work. The TCEQ's choice of a contractor was required to be made with consultation with the Plaintiffs, EPA, and the Portland Cement Association. Holcim participated in the choice of contractor. Midway through the study's progress, the contractor was required to identify to the Plaintiffs, EPA, and the Portland Cement Association, a list of cement kilns with advanced NOX emission reduction technologies being analyzed as part of the study. Holcim received this information. TCEQ was required to establish channels of communication with the Parties for technical air quality issues and make a good faith effort to address problems identified by the Parties. TCEQ also was required to meet with the Parties on other issues of interest and concern in the cement kiln matter. Holcim was involved in the communications and meetings with TCEQ and provided comments on the Draft Report and the final. The EPA has not been provided with any legal document filed with the Federal District Court asserting that TCEQ failed to meet its legal obligations under the Settlement Agreement of making a good faith effort to address any problems identified by Holcim.

    The ERG Report evaluated the applicability, availability, technical feasibility, and cost-effectiveness of NOX control technologies for cement kilns located in the D/FW area beyond the requirements of the NOX rules in the SIP at the time of the Report (i.e., rules adopted by the State in 2003 and approved by EPA at 69 FR 15681 (March 24, 2004)). The Report is consistent with EPA's ACT (2000) document, proposed New Source Performance Standard (NSPS) for Portland cement plants at 73 FR 34072 (June 16, 2008), and the BACT/RACT/LAER Clearinghouse.

    Comment #9: Holcim commented that for its two PH/PC kilns, the TCEQ proposed equation at section 117.3123(b) for calculating a NOX source cap would establish an emission rate of 2.84 TPD of NOX emissions per PH/PC kiln, with a plant-wide NOX emission limit of 5.68 TPD (2.84 TPD × 2 kilns). In its comments to the State, Holcim alternatively proposed a plant-wide NOX limit of 8.5 tons per day to be applied during the ozone season only. The TCEQ, however, adopted the equation at section 117.3123(b) for calculating a NOX source cap that establishes a more stringent emission rate than Holcim had requested, without going through another round of public comment and hearing.

    Response to Comment #9: Courts have consistently held that an agency is not required to start over with a new notice of proposed rulemaking, if the final rule is a “logical outgrowth” of the proposed rule. It is an established administrative law principle that after hearing all public comments, the agency may end up substantially revising the original proposed rule. What is required is that the proposal notice should be sufficiently descriptive of the `subjects and issues involved' so that interested parties may offer informed criticism and Start Printed Page 1931comments. See Ethyl Corp. v. EPA, 541 F.2d 1, 48 (DC Cir. 1976). If the final rule is logically connected to the proposed rule, the public is considered to have had an adequate opportunity to make its views known. The State's proposal was clear that the issues were an appropriate emissions limitation, and a corresponding source cap equation. After the close of the public comment period, and upon review and evaluation of the submitted comments, the State merely expanded on prior information, and addressed alleged deficiencies in the pre-existing data. See Rybachek v. EPA, 904 F.2d 1276, 1286 (9th. Cir. 1990).

    The resultant equation is in a format consistent with other equations in Chapter 117. The public was provided an ample opportunity to provide comments on the appropriateness of NOX emissions limitations, and what would be the appropriate corresponding equation. An integral part of rulemaking is for the State to have the authority and discretion to revise its initial version of a proposed rule, consistent with the terms of its proposal, based on relevant information it receives during public comment period. It is not an uncommon practice for a state to issue a final rule that differs from the proposal based on the receipt of relevant information during its public comment period.

    Comment #10: TXI and Holcim comment that neither SCR nor LoTOX technology constitutes RACT for the control of NOX from the Ellis County cement kilns, and refer to their comments on the draft and final Report.

    Response to Comment #10: We believe that these requirements in the State's rules meet the minimum level of control required for RACT rules and, as discussed previously, the issue of whether the rules are more stringent than what is necessary to meet RACT is not pertinent for our review of the rules.

    Comment #11: Holcim commented that according to a “New Source Analysis and Technical Review” (Technical Review) in conjunction with Holcim's PSD Permit No. 8996/PSD-TX-454M3, issued in 2005, the TCEQ technical staff stated that NOX reductions using SNCR are “typically 20-40%.” Holcim continues that the Technical Review cited above; however, mentions that a kiln in Sweden, with a high baseline, had demonstrated 83% NOX reduction. Therefore, the State's NOX cement kiln rule for Ellis County is too stringent because it assumes a control level greater than what was in the 2005 permit.

    Response to Comment #11: While Holcim accurately describes the conclusion reached as part of the 2005 permitting determination, additional information has become available since that time, as described in the 2006 Report, the documents supporting the EPA's proposed NSPS, etc. This additional information illustrates that using SNCR with well-designed and properly operated process design, e.g., low-NOX burners, Staged Combustion in the Calciner (SCC) mechanism, can achieve as high as 70% reductions. Air pollution control equipment can often achieve greater percent reduction with higher uncontrolled emission rates (high baseline). This means that if a kiln is already controlled with low-NOX burners and SCC mechanism, then the percent reduction of NOX with the addition of the SNCR from that kiln will be less.

    Comment #12: Holcim contends that it cannot meet the ozone season emission factor of 1.7 pounds of NOX per ton of clinker produced. This emission factor is used by the TCEQ in the equation to establish a plant-wide NOX emission source cap for each of the three cement kiln companies in Ellis County. 30 TAC 117.3123(b). Because it allegedly cannot meet this emission factor, Holcim claims it cannot meet the plant-wide NOX emission source cap for its PH/PC kilns. Holcim states that it repeatedly commented on the proposed emission factor to TCEQ during the rulemaking process, claiming that it cannot achieve this emission factor, despite its recent installation of SNCR and based upon testing of the SNCR. According to Holcim, testing for its kiln #2 showed it did not meet the 1.7 pounds NOX/ton of clinker emission factor, but rather it met 1.95 lb NOX/ton of clinker. Holcim claims the 1.95 emission factor was determined to be BACT in a recent air permit for kiln #2, and that TCEQ adopted the 1.7 pounds NOX per ton of clinker emission factor without adequate justification. TCEQ did not adequately consider the technical practicability, and economic reasonableness of the limitations contained in the source cap rule. TCEQ did not adequately consider the reasonable availability of control technology for Holcim's kilns, and the emission limitations are not practically achievable using SNCR.

    Response to Comment #12: We believe that the State's rules meet the minimum level of control required for RACT rules and, as discussed previously, the issue of whether the rules are more stringent than what is necessary to meet RACT is not pertinent for our review of the rules. Further, the source cap does rule not mandate the type of control that a source must use.

    The source cap includes a NOX emission factor of 1.7 pounds per ton of clinker for dry preheater-precalciner or precalciner kilns, and a NOX emission factor of 3.4 pounds per ton of clinker for wet kilns. According to TCEQ, emission levels of 1.7 pounds per ton of clinker have been demonstrated on a dry preheater-precalciner or precalciner kiln in Ellis County without the addition of the SNCR or other controls considered as part of the cement kiln study. The commenter has two kilns, one of which is a dry preheater-precalciner kiln.

    The information in EPA's proposed NSPS (73 FR 34072) indicates that an emission factor of 1.5 pound NOX per ton of clinker produced is achievable and cost effective. In fact, NOX emission factors of 1.62 to 1.97 pound NOX per ton of clinker produced have been demonstrated without adding SNCR.

    The information in EPA's proposed NSPS (73 FR 34072) indicates that an emission factor of 1.95 pound NOX per ton of clinker produced can be achieved on average for approximately $2,000 per ton of NOX reduced, and at the 1.5 lb/ton of clinker level for approximately $2,100 per ton of NOX reduced.

    The State estimated the cost effectiveness for SNCR presented in the cement kiln study to be $1,400 to $2,300 per ton on NOX.

    We reviewed TCEQ's evaluation and find it to be sufficient to support a finding that the cement kiln requirements of 30 TAC Chapter 117 constitute RACT for the D/FW area.

    Comment #13: Holcim states that neither TCEQ nor EPA has conducted a proper source-specific RACT analysis for Holcim's cement kilns in Ellis County.

    Response to Comment #13: While a State can consider source-specific considerations when setting RACT levels of control, it is not obligated to do so. RACT is most often implemented through source category rules. In setting a source category rule for cement plants, TCEQ set a limit it believes, and EPA agrees, meets the statutory minimum for a RACT level of control at all of the affected cement manufacturers.

    Comment #14: Holcim asserts that there are other problems with the source cap provision of the rule which should prevent it from being used to set the NOX emission limitations: a) TCEQ's selection of the 2003-2005 time period to calculate a source's actual production is without any basis; b) TCEQ's source cap equation fails to take into account facility downtime; and c) TCEQ's source cap equation fails to take into account the need for alkali bypass at the Holcim facility.Start Printed Page 1932

    Response to Comment #14: As discussed previously, the comments are not relevant to determining that the rule at a minimum meets the RACT requirement of the Act.

    This is not the first time TCEQ has used the three most recent year production or capacity data for equations in other parts of Chapter 117, and EPA has approved that approach as a part of the Texas SIP. The production information is the actual data reported by the sources to the TCEQ. The source cap equation takes into account facility downtime and operation by using the three years of actual production rate data reported to TCEQ. With regard to the alkali bypass issue; this comment is not relevant to our RACT review because, as noted previously, EPA cannot second guess the State's choices of control level as long as it meets the minimum level required to satisfy RACT.

    This concludes our responses to the written comments we received during public comment period.

    D. What sections of the May 30, 2007 submittal will become part of Texas SIP?

    Table 1 below contains a summary list of the sections of 30 TAC, Chapter 117 that EPA is approving into the Texas SIP.

    Table 1—Section Numbers and Section Descriptions of 30 TAC, Chapter 117 Affected by the Cement Kilns Rule

    Section No.Description
    Section 117.3100Applicability.
    Section 117.3101Cement Kilns Definitions.
    Section 117.3103Exemptions.
    Section 117.3110Emission Specifications.
    Section 117.3120Source Cap.
    Section 117.3123Dallas-Fort Worth Eight-Hour Ozone Attainment Demonstration Control Requirements.
    Section 117.3140Continuous Demonstration of Compliance.
    Section 117.3142Emission Testing and Monitoring for Eight-Hour Attainment Demonstration.
    Section 117.3145Notification, Recordkeeping, and Reporting Requirements.
    Section 117.9320Compliance Schedule for Cement Kilns.

    You can find complete TCEQ's rules and regulations at http://www.tceq.state.tx.us/​rules/​indxpdf.html.

    E. What sections of the May 30, 2007 submittal will not become a part of Texas SIP?

    Per TCEQ's request the following sections, listed in Table 2 below, of the cement kilns rule will not become a part of EPA-approved Texas SIP. These sections mainly pertain to the control of ammonia, that is not a precursor to ozone, and are not required to be a part of the SIP.

    Table 2—Sections of Chapter 117 Not in EPA-Approved Texas SIP

    Section No.Explanation
    117.3123(f), and 117.3125Not a part of EPA-approved Texas SIP.

    Although the above sections of 30 TAC Chapter 117 are not to become a part of Texas SIP, they will continue to remain enforceable at the State level.

    F. What Texas Counties will this rulemaking affect?

    Table 3 below lists the five Texas Counties that will be affected by the cement kilns rule.

    Table 3—Texas Counties Affected by Cement Kiln Rulemaking of 2007

    Texas countiesExplanation
    Bexar, Comal, Ellis, Hays, and McLennanSee section 117.3101.

    G. What are the NOX control emissions requirements that we approved for Texas under the 1-hour ozone SIP?

    We approved the NOX control emission requirements for cement kilns at 69 FR 15681 published on March 26, 2004. See Table III of that document. We included that Table in the TSD prepared for our proposal.

    H. What are the NOX control emissions requirements that we are approving for Texas under the 8-hour ozone SIP?

    Ellis County is located within the D/FW 8-hour ozone nonattainment area. The ozone season for the D/FW area is March 1 through October 31 of each calendar year. See 40 CFR part 58, Appendix D, Table D-3, and 40 CFR 81.39. For Ellis County, during the non-ozone season (November 1 through end-of-February of each calendar year), the cement kilns NOX control requirements that we approved at 69 FR 15681 will continue to remain in effect. However, during the ozone season, March 1 through October 31 of each calendar year, the cement kilns in Ellis County must comply with a source cap formula calculated and expressed in TPD of Start Printed Page 1933actual NOX emissions, per site, on a 30-day rolling average basis. See equation 117.3123(b). The following Table 4 contains a summary list of NOX control requirements for cement kilns under the 8-hour ozone SIP.

    Table 4—NOX Control Requirements for Cement Kilns Under the 8-Hour Ozone SIP

    SourceCountyNOX emission requirementCitation
    Long wet kilnBexar, Comal, Hays, McLennan6.0 lb NOX/ton of clinker produced117.3110(a)(1)(A).
    Long dry kilnBexar, Comal, Hays, McLennan5.1 lb NOX/ton clinker of produced117. 3110(a)(2).
    Preheater kilnBexar, Comal, Hays, McLennan3.8 lb NOX/ton of clinker produced117. 3110(a)(3).
    Precalciner or preheater-precalciner kilnBexar, Comal, Hays, McLennan2.8 lb NOX/ton of clinker produced117.3110(a)(4).
    Long wet kilnEllis4.0 lb NOX/ton of clinker produced, outside D/FW ozone season117.3110(a)(1)(B).
    Preheater kilnEllis3.8 lb NOX/ton of clinker produced, outside D/FW ozone season117.3110(a)(3).
    Long dry kilnEllis5.1 lb NOX/ton of clinker produced, outside D/FW ozone season117.3110(a)(2).
    Precalciner or preheater-precalciner kilnEllis2.8 lb NOX/ton of clinker produced, outside D/FW ozone season117.3110(a)(4).
    Portland cement kilnEllisDuring D/FW ozone season, 30-day rolling average, source cap equation 117.3123(b), with the 2003-2005 reported average annual clinker production, limit is equivalent to 1.7 lb NOX/ton of clinker produced for dry preheater-precalciner or precalciner kilns, or 3.4 lb NOX/ton of clinker produced for long wet kilns117.3123(b).

    The cement kilns rule does not require or endorse a specific postcombustion NOX control technology, and allows the owners or operators to choose their preferred method of compliance as long as the source cap limit, per site, is being met. These NOX control requirements will result in a 9.7 TPD of NOX reduction from cement kilns in Ellis County. We have determined the above NOX control requirements for existing cement kilns in the D/FW area are consistent with the RACT requirements of the Act. Therefore, we are approving them into the Texas SIP as meeting the RACT requirement for the D/FW 8-hour ozone nonattainment area. See our TSD prepared in conjunction with this rulemaking action for more information.

    I. What are the compliance schedules for NOX emissions from cement kilns that we are approving?

    The compliance schedule for cement kilns located in Texas Counties of Bexar, Comal, Hays, and McLennan will continue to remain in effect as we approved it at 69 FR 15681. See Table IV of that document. We included that Table in our TSD prepared for the proposal.

    The following Table 5 contains a summary of the NOX compliance schedule-related information for cement kilns in Ellis County. See section 117.9320(c) for more information.

    Table 5—NOX Compliance Schedules for Cement Kilns in Ellis County Under the 8-Hour Ozone SIP

    SourceCompliance dateAdditional informationCitation
    Cement Kilns—Ellis CountyComply with testing, monitoring, notification, recordkeeping, and reporting requirements as soon as practicable but no later than March 1st, 20098-hour attainment demonstration requirement117.9320

    We believe that including the compliance dates in the rule provides for enforceability and practicability of the NOX rule, and enhances the Texas SIP. The March 1, 2009 compliance date for cement kilns in Ellis County is consistent with the implementation requirement set forth in 40 CFR 51.912(a)(3). Therefore, we are approving them into Texas SIP, and as meeting the RACT requirement for the D/FW 8-hour ozone nonattainment area.

    II. Final Action

    Today, we are approving revisions to the 30 TAC Chapter 117 into the Texas SIP. In this rulemaking, we are approving the nonsubstantive renumbering of the cement kilns provisions of the May 30, 2007 submittal for cement kilns operating in Bexar, Comal, Ellis, Hays, and McLennan Counties of Texas. We are approving the substantive cement kilns provisions of the May 30, 2007 submittal for cement kilns operating in Ellis County as meeting the Act's RACT requirement for NOX emissions from cement kilns operating in the D/FW 8-hour ozone nonattainment area. We are also making ministerial corrections to the table in 40 CFR 52.2270(c) entitled “EPA-Approved Regulations in the Texas SIP” to reflect our approval of certain revisions to 30 TAC 117 on December 3, 2008 (73 FR 73562). The ministerial corrections apply to table headings and entries for sections 117.323, 117.1110, 117.1205, 117.1210 and 117.2135 under Chapter 117—Control of Air Pollution from Nitrogen Compounds.

    III. Statutory and Executive Order Reviews

    Under the Clean Air Act, the Administrator is required to approve a SIP submission that complies with the Start Printed Page 1934provisions of the Act and applicable Federal regulations. 42 U.S.C. 7410(k); 40 CFR 52.02(a). Thus, in reviewing SIP submissions, EPA's role is to approve state choices, provided that they meet the criteria of the Clean Air Act. Accordingly, this action merely approves state law as meeting Federal requirements and does not impose additional requirements beyond those imposed by state law. For that reason, this action:

    • Is not a “significant regulatory action” subject to review by the Office of Management and Budget under Executive Order 12866 (58 FR 51735, October 4, 1993);
    • Does not impose an information collection burden under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.);
    • Is certified as not having a significant economic impact on a substantial number of small entities under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.);
    • Does not contain any unfunded mandate or significantly or uniquely affect small governments, as described in the Unfunded Mandates Reform Act of 1995 (Pub. L. 104-4);
    • Does not have Federalism implications as specified in Executive Order 13132 (64 FR 43255, August 10, 1999);
    • Is not an economically significant regulatory action based on health or safety risks subject to Executive Order 13045 (62 FR 19885, April 23, 1997);
    • Is not a significant regulatory action subject to Executive Order 13211 (66 FR 28355, May 22, 2001);
    • Is not subject to requirements of Section 12(d) of the National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) because application of those requirements would be inconsistent with the Clean Air Act;
    • Does not provide EPA with the discretionary authority to address, as appropriate, disproportionate human health or environmental effects, using practicable and legally permissible methods, under Executive Order 12898 (59 FR 7629, February 16, 1994); and
    • Does not have tribal implications as specified by Executive Order 13175 (65 FR 67249, November 9, 2000), because the SIP is not approved to apply in Indian country located in the state, and EPA notes that it will not impose substantial direct costs on tribal governments or preempt tribal law.

    The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the Small Business Regulatory Enforcement Fairness Act of 1996, generally provides that before a rule may take effect, the agency promulgating the rule must submit a rule report, which includes a copy of the rule, to each House of the Congress and to the Comptroller General of the United States. EPA will submit a report containing this action and other required information to the U.S. Senate, the U.S. House of Representatives, and the Comptroller General of the United States prior to publication of the rule in the Federal Register. A major rule cannot take effect until 60 days after it is published in the Federal Register. This action is not a “major rule” as defined by 5 U.S.C. 804(2).

    Under section 307(b)(1) of the Clean Air Act, petitions for judicial review of this action must be filed in the United States Court of Appeals for the appropriate circuit by March 16, 2009. Filing a petition for reconsideration by the Administrator of this final rule does not affect the finality of this action for the purposes of judicial review nor does it extend the time within which a petition for judicial review may be filed, and shall not postpone the effectiveness of such rule or action. This action may not be challenged later in proceedings to enforce its requirements. (See section 307(b)(2).)

    Start List of Subjects

    List of Subjects in 40 CFR Part 52

    • Environmental protection
    • Air pollution control
    • Hydrocarbons
    • Incorporation by reference
    • Intergovernmental relations
    • Nitrogen oxide
    • Reporting and recordkeeping requirements
    • Volatile organic compounds
    End List of Subjects Start Signature

    Dated: December 17, 2008.

    Richard E. Greene,

    Regional Administrator, Region 6.

    End Signature Start Amendment Part

    Part 52, chapter I, title 40 of the Code of Federal Regulations is amended as follows:

    End Amendment Part Start Part

    PART 52—[AMENDED]

    End Part Start Amendment Part

    1. The authority citation for Part 52 continues to read as follows:

    End Amendment Part Start Authority

    Authority: 42 U.S.C. 7401 et seq.

    End Authority

    Subpart SS—Texas

    Start Amendment Part

    2. In § 52.2270 the entry for Chapter 117—Control of Air Pollution from Nitrogen Compounds in the table in paragraph (c) is revised by:

    End Amendment Part Start Amendment Part

    a. Removing the entry for the Section 117.223 under Subchapter B, Division 3.

    End Amendment Part Start Amendment Part

    b. Adding the entry for Section 117.323 under Subchapter B, Division 3.

    End Amendment Part Start Amendment Part

    c. Revising the entry for Section 117.1110 under Subchapter C, Division 2.

    End Amendment Part Start Amendment Part

    d. Revising the entries for Sections 117.1205 and 117.1210 under Subchapter C, Division 3.

    End Amendment Part Start Amendment Part

    e. Revising the entry for Section 117.2135 under Subchapter D, Division 2.

    End Amendment Part Start Amendment Part

    f. Removing the entries for Sections 117.260, 117.261, 117.265, 117.273, 117.279, 117.283, and 117.524 under Subchapter E, Division 2.

    End Amendment Part Start Amendment Part

    g. Adding the entries for Sections 117.3100, 117.3101, 117.3103, 117.3110, 117.3120, 117.3123, 117.3140, 117.3142, and 117.3145 under Subchapter E, Division 2.

    End Amendment Part Start Amendment Part

    h. Revising the heading above Section 117.4200 entitled “Division 2—Nitric Acid Manufacturing—Ozone Nonattainment Areas” under Subchapter F to read “Division 3—Nitric Acid Manufacturing—General”.

    End Amendment Part Start Amendment Part

    i. Adding the entry for Section 117.9320 under Subchapter H, Division 1, in numerical order.

    End Amendment Part Start Amendment Part

    j. Removing the heading entitled “Subchapter H—Administrative Provisions,” above Division 2.

    End Amendment Part

    The removals and additions read as follows:

    Identification of plan.
    * * * * *

    (c) * * *

    Start Printed Page 1935

    EPA-Approved Regulations in the Texas SIP

    State citationTitle/subjectState approval/submittal dateEPA approval dateExplanation
    *         *         *         *         *         *         *
    Chapter 117—Control of Air Pollution from Nitrogen Compounds
    *         *         *         *         *         *         *
    Subchapter B—Combustion Control at Major Industrial, Commercial, and Institutional Sources in Ozone Nonattainment Areas
    *         *         *         *         *         *         *
    Division 3—Houston-Galveston-Brazoria Ozone Nonattainment Area Major Sources
    *         *         *         *         *         *         *
    Section 117.323Source cap5/30/20071/14/2009 [Insert FR page number where document begins]
    *         *         *         *         *         *         *
    Subchapter C—Combustion Control at Major Utility Electric Generation Sources in Ozone Nonattainment Areas
    *         *         *         *         *         *         *
    Division 2—Dallas-Fort Worth Ozone Nonattainment Area Utility Electric Generation Sources
    *         *         *         *         *         *         *
    Section 117.1110Emission Specifications for Attainment Demonstration5/30/20071/14/2009 [Insert FR page number where document begins]117.1110(b) not in SIP.
    *         *         *         *         *         *         *
    Division 3—Houston-Galveston-Brazoria Ozone Nonattainment Area Utility Electric Generation Sources
    *         *         *         *         *         *         *
    Section 117.1205Emission Specifications for Reasonably Available Control Technology (RACT)5/30/20071/14/2009 [Insert FR page number where document begins]
    Section 117.1210Emission Specifications for Attainment Demonstration5/30/20071/14/2009 [Insert FR page number where document begins]117.1210(b) not in SIP.
    *         *         *         *         *         *         *
    Subchapter D—Combustion Control at Minor Sources in Ozone Nonattainment Areas
    *         *         *         *         *         *         *
    Division 2—Dallas-Fort Worth Eight-Hour Ozone Nonattainment Area Minor Sources
    *         *         *         *         *         *         *
    Section 117.2135Monitoring, Notification, and Testing Requirements5/30/20071/14/2009 [Insert FR page number where document begins]
    Start Printed Page 1936
    *         *         *         *         *         *         *
    Subchapter E—Multi-Region Combustion Control
    *         *         *         *         *         *         *
    Division 2—Cement Kilns
    Section 117.3100Applicability5/30/200701/14/2009 [Insert FR page number where document begins]
    Section 117.3101Cement Kilns Definitions5/30/20071/14/2009 [Insert FR page number where document begins]
    Section 117.3103Exemptions5/30/20071/14/2009 [Insert FR page number where document begins]
    Section 117.3110Emission Specifications5/30/20071/14/2009 [Insert FR page number where document begins]
    Section 117.3120Source Cap5/30/20071/14/2009 [Insert FR page number where document begins]
    Section 117.3123Dallas-Fort Worth Eight-Hour Ozone Attainment Demonstration Control Requirements5/30/20071/14/2009 [Insert FR page number where document begins]117.3123(f) not in SIP.
    Section 117.3140Continuous Demonstration of Compliance5/30/20071/14/2009 [Insert FR page number where document begins]
    Section 117.3142Emission Testing and Monitoring for Eight-Hour Attainment Demonstration5/30/20071/14/2009 [Insert FR page number where document begins]
    Section 117.3145Notification, Recordkeeping, and Reporting Requirements5/30/20071/14/2009 [Insert FR page number where document begins]
    *         *         *         *         *         *         *
    Subchapter F—Acid Manufacturing
    *         *         *         *         *         *         *
    Division 3—Nitric Acid Manufacturing—General
    *         *         *         *         *         *         *
    Subchapter H—Administrative Provisions
    Division 1—Compliance Schedules
    *         *         *         *         *         *         *
    Section 117.9320Compliance Schedule for Cement Kilns5/30/20071/14/2009 [Insert FR page number where document begins]
    *         *         *         *         *         *         *
    Start Printed Page 1937
    * * * * *
    End Supplemental Information

    [FR Doc. E9-119 Filed 1-13-09; 8:45 am]

    BILLING CODE 6560-50-P

Document Information

Effective Date:
2/13/2009
Published:
01/14/2009
Department:
Environmental Protection Agency
Entry Type:
Rule
Action:
Final rule.
Document Number:
E9-119
Dates:
This rule will be effective on February 13, 2009.
Pages:
1927-1937 (11 pages)
Docket Numbers:
EPA-R06-OAR-2007-1147, FRL-8758-8
Topics:
Air pollution control, Environmental protection, Hydrocarbons, Incorporation by reference, Intergovernmental relations, Nitrogen oxides, Reporting and recordkeeping requirements, Volatile organic compounds
PDF File:
e9-119.pdf
CFR: (1)
40 CFR 52.2270