2010-3396. 2010 Rates for Pilotage on the Great Lakes  

  • Start Preamble

    AGENCY:

    Coast Guard, DHS.

    ACTION:

    Final rule.

    SUMMARY:

    The Coast Guard is increasing the rates for pilotage service on the Great Lakes by an average of 5.07% to generate sufficient revenue to cover allowable expenses, target pilot compensation, and return on investment. This increase reflects an August 1, 2010, increase in benchmark contractual wages and benefits and an adjustment for inflation. This rulemaking promotes the Coast Guard strategic goal of maritime safety.

    DATES:

    This final rule is effective August 1, 2010.

    ADDRESSES:

    Comments and material received from the public, as well as documents mentioned in this preamble as being available in the docket, are part of docket USCG-2009-0883 and are available for inspection or copying at the Docket Management Facility (M-30), U.S. Department of Transportation, West Building Ground Floor, Room W12-140, 1200 New Jersey Avenue, SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. You may also find this docket on the Internet by going to http://www.regulations.gov,, inserting USCG-2009-0883 in the “Keyword” box, and then clicking “Search.”

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    For questions on this final rule, please call Mr. Paul Wasserman, Chief, Great Lakes Pilotage Branch, Commandant (CG-54122), U.S. Coast Guard, at 202-372-1535, by fax 202-372-1909, or e-mail Paul.M.Wasserman@uscg.mil. For questions on viewing or submitting material to the docket, call Renee V. Wright, Chief, Dockets, Department of Transportation, telephone 202-493-0402.

    Table of Contents for Preamble

    I. Abbreviations

    II. Regulatory History

    III. Background

    IV. Discussion of Comments and Changes

    V. Discussion of the Final Rule

    A. Summary

    B. Calculating the Rate Adjustment

    VI. Regulatory Analyses

    A. Regulatory Planning and Review

    B. Small Entities

    C. Assistance for Small Entities

    D. Collection of Information

    E. Federalism

    F. Unfunded Mandates Reform Act

    G. Taking of Private Property

    H. Civil Justice Reform

    I. Protection of Children

    J. Indian Tribal Governments

    K. Energy Effects

    L. Technical Standards

    M. Environment

    I. Abbreviations

    AMOU American Maritime Officer Union

    GLPAC Great Lakes Pilotage Advisory Committee

    MISLE Coast Guard Marine Inspection, Safety, and Law Enforcement system

    NAICS North American Industry Classification System

    NPRM Notice of Proposed Rulemaking

    NTTAA National Technology Transfer and Advancement Act

    OMB Office of Management and Budget

    II. Regulatory History

    On October 30, 2009, we published a notice of proposed rulemaking entitled Great Lakes Pilotage Rates—2010 Annual Review and Adjustment in the Federal Register (NPRM, 74 FR 56153). We received five comments on the proposed rule. No public meeting was requested and none was held.

    III. Background

    We published a notice of proposed rulemaking on October 30, 2009 (NPRM, 74 FR 56153). The NPRM proposed an average 5.07% rate increase.

    This rulemaking increases Great Lakes pilotage rates in accord with the methodology contained in Coast Guard regulations in 46 CFR parts 401-404. Our regulations implement the Great Start Printed Page 7959Lakes Pilotage Act of 1960 (“the Act”), 46 U.S.C. Chapter 93, which requires foreign-flag vessels engaged in foreign trade to use U.S. registered pilots while transiting the St. Lawrence Seaway and the Great Lakes system. The Act also requires the Secretary of Homeland Security to “prescribe by regulation rates and charges for pilotage services, giving consideration to the public interest and the costs of providing the services,” and requires annual rate reviews to be completed by March 1 of each year, with a “full ratemaking” to establish new base rates at least once every five years. 46 U.S.C. 9303(f).

    The U.S. waters of the Great Lakes and the St. Lawrence Seaway are divided into three pilotage districts. Pilotage in each district is provided by an association certified by the Coast Guard Director of Great Lakes Pilotage to operate a pilotage pool. It is important to note that, while we set rates, we do not control the actual number of pilots an association maintains, so long as the association is able to provide safe, efficient, and reliable pilotage service, nor do we control the actual compensation that pilots receive. This is determined by each of the three District associations, which use different compensation practices.

    District One, consisting of Areas 1 and 2, includes all U.S. waters of the St. Lawrence River and Lake Ontario. District Two, consisting of Areas 4 and 5, includes all U.S. waters of Lake Erie, the Detroit River, Lake St. Clair, and the St. Clair River. District Three, consisting of Areas 6, 7, and 8, includes all U.S. waters of the St. Mary's River, Sault Ste. Marie Locks, and Lakes Michigan, Huron, and Superior. Area 3 is the Welland Canal, which is serviced exclusively by the Canadian Great Lakes Pilotage Authority and, accordingly, is not included in the U.S. rate structure. Areas 1, 5, and 7 have been designated by Presidential Proclamation, pursuant to the Great Lakes Pilotage Act of 1960, to be waters in which pilots must at all times be fully engaged in the navigation of vessels in their charge. Areas 2, 4, 6, and 8 have not been so designated because they are open bodies of water. Under the Act, pilots assigned to vessels in these areas are only required to “be on board and available to direct the navigation of the vessel at the discretion of and subject to the customary authority of the master.” 46 U.S.C. 9302(a)(1)(B).

    Our pilotage regulations implement the Act's requirement for annual reviews of pilotage rates and a full ratemaking at least once every five years. 46 CFR 404.1. To assist in calculating pilotage rates, the regulations require pilotage associations to submit annual financial statements prepared by certified public accounting firms. In addition, every fifth year, in connection with the full ratemaking, we contract with an independent accounting firm to conduct a full audit of the accounts and records of the pilotage associations and prepare and submit financial reports relevant to the ratemaking process. In those years when a full ratemaking is conducted, we generate the pilotage rates using Appendix A to 46 CFR part 404. The last Appendix A review was concluded in 2006 (71 FR 16501, Apr. 3, 2006). Between the five-year full ratemaking intervals, we annually review the pilotage rates using Appendix C to part 404, and adjust rates when deemed appropriate. We conducted Appendix C reviews in 2007, 2008 and 2009 and increased rates in each year. The 2009 final rule was published on July 21, 2009 (74 FR 138), and took effect on August 1, 2009. We define the terms and formulas used in Appendix A and Appendix C in Appendix B to part 404.

    This final rule concludes the annual Appendix C rate review for 2010, and increases rates by an average of 5.07% over the rates that took effect August 1, 2009.

    IV. Discussion of Comments and Changes

    Five comments were submitted during the NPRM public comment period.

    Ratemaking methodology. One commenter recommended that we suspend any further action on this rulemaking until full consideration can be given to comments received in response to our July 21, 2009, request for public comments (“Great Lakes Pilotage Ratemaking Methodology,” 74 FR 35838). In July, we requested comments on the adequacy of our current ratemaking methodology in light of the realities of Great Lakes commercial shipping and the need to fairly balance competing considerations. We noted that any comments would be referred to the Great Lakes Pilotage Advisory Committee (GLPAC), a group created by the Great Lakes Pilotage Act to advise us on significant issues relating to Great Lakes pilotage. GLPAC will review our methodology and the comments received in response to our notice, and may recommend changes. If we accept their recommendations, any changes would require regulatory action. GLPAC has just begun reviewing comments. As yet there is no timeline for any GLPAC recommendations and no rulemaking underway to modify the methodology. Therefore, we cannot complete the “full consideration” mentioned by the commenter before March 1, 2010, the Act's deadline for establishing any annual rate adjustment for 2010. The Act provides no exception to the March 1 deadline for consideration of possible changes to the existing rate review process. Thus, we cannot suspend work on this rulemaking without violating the law.

    Another commenter reiterated comments the commenter made during the 2007 and 2009 rate reviews. In 2007, we explained our reasons for disagreeing with this commenter's analysis of the “150% factor” for designated waters; 2007 interim rule, 72 FR 8115 at 8117 (Feb. 23, 2007) and 2007 Final Rule, 72 FR 53158 at 53159 (July 18, 2007). In the 2009 final rule, we explained our reasons for disagreeing with this Commenter on the “Riker Report” on bridge hour calculations; 74 FR 35812 at 35814. As no new substantive information has been added, we will not repeat those earlier explanations. The commenter's suggestion that we amend the vessel weighting factor table in 46 CFR 401.400 is beyond the scope of this ratemaking.

    Two commenters reiterated past comments about our use of rounding in bridge hour calculations, without adding new information. We fully discussed our use of rounding in the 2009 final rule, specifically with reference to Area 4, which is of particular concern to one of these commenters, and we will not repeat that discussion; 74 FR 35812 at 35813. The Area 4 calculations have not changed since the 2009 final rule.

    A commenter said that our ratemaking is arbitrary and capricious because we count delay and detention in calculating bridge hours for Areas 6, 7, and 8, but not in Areas 4 and 5. No information was provided to substantiate this claim, which runs counter to our discussion of bridge hour calculations in ratemaking documents over many years, and which repeats an allegation made in 2007 and refuted in that year's interim rule: “The Coast Guard has never considered delay, detention, or travel time to be included in the definition of bridge hours and has never knowingly included these items in its bridge hour computations”; 72 FR 8115 at 8117, Feb. 23, 2007. Coast Guard did not consider delay, detention, or travel time in its bridge hour computations in this final rule.

    Effective date. Another commenter stated that the Act requires any 2010 rate adjustment to take effect by March 1, 2010. The comment acknowledged that this is not the Coast Guard's interpretation of the Act. In our view, 46 Start Printed Page 7960U.S.C. 9303(f) only requires us to publish a rule announcing the 2010 rate adjustment by March 1, 2010; the rule's effective date should be delayed until the event triggering the need for adjustment actually takes place. In this case, the triggering event will be the benchmark contract changes that do not take effect until August 1, 2010. This commenter also said that, even under the Coast Guard's interpretation of the Act, some relevant rate factors have already changed. The commenter mentions bridge hour projections (discussed subsequently) and cost of living (which is determined using 2007 and 2008 data). However, the inflation factor is merely one of three components that make up projected total economic costs and has a minimal effect on the rate calculation. We decline to adjust the rates to reflect only minimal changes.

    Supporting data. One commenter found it impossible to verify the calculations made in our NPRM. He mentioned the absence from the docket of two benchmark contracts and the absence of supporting documentation for the inflation factor used in our calculations. The two contracts were placed in the docket maintained by the Docket Management Facility on November 25, 2009, prior to the close of the public comment period. The NPRM, 74 FR 56153 at 56156, identified the parties to both contracts and accurately represented their terms. This enabled the commenter to verify the accuracy of our data, prior to November 25, 2009, by contacting any of the contractual parties. The data supporting the inflation factor did not appear in the docket maintained by the Docket Management Facility until December 2, 2009, after the close of the public comment period. However, the NPRM, 74 FR 56153 at 56159, identified Bureau of Labor Statistics (BLS) Midwest consumer price data as the source of our calculations, and this data was at all times available from the BLS Web site, http://www.bls.gov.

    This same commenter also said that projected bridge hours for 2010 should be based on actual bridge hours for 2009 to date, along with results of consultations with stakeholders, including the shipping industry. Another commenter asked why we did not use 2009 actual hours. As stated in the NPRM, 74 FR 56153 at 56158, our 2010 projections are based on historical data (by which we mean actual figures for complete past shipping seasons) and information provided both by pilots and industry. To meet the Act's March 1 deadline for completion of each year's rate review, with a final rule that meets all applicable requirements of the Federal regulatory process, Coast Guard data collection for the following year's review typically begins in the early spring of the preceding year. Given that reality, it is impracticable for the Coast Guard to base NPRM projections for the next year on actual results from the preceding year. The commenter's estimate of a 25% drop in shipping traffic between 2008 and 2009 does not provide us with sufficiently detailed data on which to base a revision of our 2010 projections in this final rule. We do expect verified and complete 2009 actual data to inform our 2011 ratemaking.

    District One pilot boat. Another commenter expressed a desire to have District One's purchase of a new pilot boat reflected in the 2010 rate adjustment, or as soon as possible. This comment is beyond the scope of this ratemaking, which is being conducted pursuant to our Appendix C methodology, because it asks for action that can be taken only under an Appendix A full ratemaking. The next Appendix A review is already in progress. It will be based on a 2008 audit of pilot association expenses. This could present a timing problem from District One's perspective, because their boat expenses did not begin until 2009 and therefore would not be captured in the 2008 audit data. Presumably to address that timing problem, in March 2009, District One petitioned the Coast Guard for a “modified” Appendix A review that could focus specifically on the pilot boat purchase. We could not grant that petition because there are no provisions for “modifying” Appendix A without conducting a rulemaking to make the modifications. However, we are mindful of the importance of this issue for District One, and we will ask GLPAC for its recommendations on how best to proceed, as part of GLPAC's consideration of public comments received in response to our July 2009 ratemaking methodology notice.

    Miscellaneous. A commenter asked us to refer to “U.S. registered pilots” instead of “federally registered Great Lakes pilots” and we have done so.

    V. Discussion of the Final Rule

    A. Summary

    We are increasing pilotage rates in accordance with the methodology outlined in Appendix C to 46 CFR part 404, by increasing rates an average 5.07% over the 2009 final rule, effective August 1, 2010. The new rates are unchanged from what we proposed in the NPRM. Table 1 shows the new rates for each Area.

    Table 1—2010 Area Rate Changes

    If pilotage service is required in:Then the proposed percentage increases over the current rate is:
    Area 1 (Designated waters)4.65
    Area 2 (Undesignated waters)5.33
    Area 4 (Undesignated waters)5.47
    Area 5 (Designated waters)4.96
    Area 6 (Undesignated waters)5.27
    Area 7 (Designated waters)4.73
    Area 8 (Undesignated waters)5.17
    Overall Rate Change (percentage change in overall prospective unit costs/base unit costs; see Table 18)5.07

    Rates for cancellation, delay, or interruption in rendering services (46 CFR 401.420), and basic rates and charges for carrying a U.S. pilot beyond the normal change point, or for boarding at other than the normal boarding point (46 CFR 401.428), have been increased by 5.07% in all Areas.

    B. Calculating the Rate Adjustment

    The Appendix C ratemaking calculation involves eight steps:

    Step 1: Calculate the total economic costs for the base period (i.e. pilot compensation expense plus all other recognized expenses plus the return element) and divide by the total bridge Start Printed Page 7961hours used in setting the base period rates;

    Step 2: Calculate the “expense multiplier,” the ratio of other expenses and the return element to pilot compensation for the base period;

    Step 3: Calculate an annual “projection of target pilot compensation” using the same procedures found in Step 2 of Appendix A;

    Step 4: Increase the projected pilot compensation in Step 3 by the expense multiplier in Step 2;

    Step 5: Adjust the result in Step 4, as required, for inflation or deflation;

    Step 6: Divide the result in Step 5 by projected bridge hours to determine total unit costs;

    Step 7: Divide prospective unit costs in Step 6 by the base period unit costs in Step 1; and

    Step 8: Adjust the base period rates by the percentage changes in unit cost in Step 7.

    The base data used to calculate each of the eight steps comes from the 2009 Appendix C review. The Coast Guard also used the most recent union contracts between the American Maritime Officers Union (AMOU) and vessel owners and operators on the Great Lakes to determine target pilot compensation. Bridge hour projections for the 2010 season have been obtained from historical data, pilots, and industry. All documents and records used in this rate calculation have been placed in the public docket for this rulemaking and are available for review at the addresses listed under ADDRESSES.

    Some values may not total exactly due to format rounding for presentation in charts and explanations in this section. The rounding does not affect the integrity or truncate the real value of all calculations in the ratemaking methodology described below. Also, please note that in previous rulemakings we calculated an expense multiplier for each District. This was unnecessary because Appendix C calculations are based on area figures, not district figures. District figures, where they are shown in the following tables, now reflect only the arithmetical totals for each of the district's areas.

    Step 1: Calculate the total economic cost for the base period. In this step, for each area, we add the total cost of target pilot compensation, all other recognized expenses, and the return element (net income plus interest). We divide this sum by the total bridge hours for each area. The result is the cost in each area of providing pilotage service per bridge hour for the base period. Tables 2 through 4 summarize the Step 1 calculations:

    Table 2—Total Economic Cost for Base Period (2009), Areas in District One

    Area 1 St. Lawrence RiverArea 2 Lake OntarioTotal * District One
    Base operating expense (less base return element)$538,155$547,489$1,085,644
    Base target pilot compensation+ $1,617,955+ $981,589+ $2,599,544
    Base return element+ $10,763+ $16,425+ $27,188
    Subtotal *= $2,166,873= $1,545,503= $3,712,376
    Base bridge hours÷ 5,203÷ 5,650÷ 10,853
    Base cost per bridge hour= $416.47= $273.54= $342.06
    * As explained in the text preceding Step 1, District totals have been expressed differently from previous rulemakings. This accounts for slight differences between the District totals shown in Table 16 of the 2009 final rule and the District totals shown in this table.

    Table 3—Total Economic Cost for Base Period (2009), Areas in District Two

    Area 4 Lake ErieArea 5 Southeast Shoal to Port Huron, MITotal * District Two
    Base operating expense$502,087$789,202$1,291,289
    Base target pilot compensation+ $785,271+ $1,617,955+ $2,403,226
    Base return element+ $25,104+ $31,568+ $56,672
    Subtotal= $1,312,463= $2,438,725= $3,751,188
    Base bridge hours÷ 7,320÷ 5,097÷ 12,417
    Base cost per bridge hour= $179.30= $478.46= $302.10
    * See footnote to Table 2.

    Table 4—Total Economic Cost for Base Period (2009), Areas in District Three

    Area 6 Lakes Huron and MichiganArea 7 St. Mary's RiverArea 8 Lake SuperiorTotal * District Three
    Base operating expense$814,358$398,461$641,580$1,854,399
    Base target pilot compensation+ $1,570,542+ $1,078,637+ $1,374,224+ $4,023,403
    Base return element+ $32,574+ $11,954+ $19,247+ $63,776
    Subtotal= $2,417,474= $1,489,052= $2,035,052= $5,941,578
    Base bridge hours÷ 13,406÷ 3,259÷ 11,630÷ 28,295
    Base cost per bridge hour= $180.33= $456.90= $174.98= $209.99
    * See footnote to Table 2.
    Start Printed Page 7962

    Step 2. Calculate the expense multiplier. In this step, for each Area, we add the base operating expense and the base return element. Then, we divide the sum by the base target pilot compensation to get the expense multiplier for each area. Tables 5 through 7 show the Step 2 calculations.

    Table 5—Expense Multiplier, Areas in District One

    Area 1 St. Lawrence RiverArea 2 Lake OntarioTotal District One
    Base operating expense$538,155$547,489$1,085,644
    Base return element+ $10,763+ $16,425+ $27,188
    Subtotal= $548,918= $563,914= $1,112,832
    Base target pilot compensation÷ $1,617,955÷ $981,589$2,599,544
    Expense multiplier0.339270.57449Not applicable (n/a)

    Table 6—Expense Multiplier, Areas in District Two

    Area 4 Lake ErieArea 5 Southeast Shoal to Port Huron, MITotal District Two
    Base operating expense$502,087$789,202$1,291,289
    Base return element+ $25,104+ $31,568+ $56,672
    Subtotal= $527,192= $820,770= $1,347,962
    Base target pilot compensation÷ $785,271÷ $1,617,955$2,403,226
    Expense multiplier0.671350.50729n/a

    Table 7—Expense Multiplier, Areas in District Three

    Area 6 Lakes Huron and MichiganArea 7 St. Mary's RiverArea 8 Lake SuperiorTotal District Three
    Base operating Expense$814,358$398,461$641,580$1,854,399
    Base return element+ $32,574+ $11,954+ $19,247+ $63,776
    Subtotal= $846,932= $410,415= $660,828= $1,918,175
    Base target pilot compensation÷ $1,570,542÷ $1,078,637÷ $1,374,224$4,023,403
    Expense multiplier0.539260.380490.48087n/a

    Step 3. Calculate annual projection of target pilot compensation. In this step, we determine the new target rate of compensation and the new number of pilots needed in each pilotage area, to determine the new target pilot compensation for each area.

    (a) Determine new target rate of compensation. Target pilot compensation is based on the average annual compensation of first mates and masters on U.S. Great Lakes vessels. For pilots in undesignated waters, we approximate the first mates' compensation and, in designated waters, we approximate the master's compensation (first mates' wages multiplied by 150% plus benefits). To determine first mates' and masters' average annual compensation, we use data from the most recent AMOU contracts with the U.S. companies engaged in Great Lakes shipping. Where different AMOU agreements apply to different companies, we apportion the compensation provided by each agreement according to the percentage of tonnage represented by companies under each agreement.

    As of May 2009, there are two current AMOU contracts, which we designate Agreement A and Agreement B. Agreement A applies to vessels operated by Key Lakes, Inc., and Agreement B applies to all vessels operated by American Steamship Co. and Mittal Steel USA, Inc.

    Both Agreement A and Agreement B provide for a 3% wage increase effective August 1, 2010. Under Agreement A, the daily wage rate will be increased from $262.73 to $270.61. Under Agreement B, the daily wage rate will be increased from $323.86 to $333.57.

    To calculate monthly wages, we apply Agreement A and Agreement B monthly multipliers of 54.5 and 49.5, respectively, to the daily rate. Agreement A's 54.5 multiplier represents 30.5 average working days, 15.5 vacation days, 4 days for four weekends, 3 bonus days, and 1.5 holidays. Agreement B's 49.5 multiplier represents 30.5 average working days, 16 vacation days, and 3 bonus days.

    To calculate average annual compensation, we multiply monthly figures by 9 months, the length of the Great Lakes shipping season.

    Table 8 shows new wage calculations based on Agreements A and B effective August 1, 2010.Start Printed Page 7963

    Table 8—Wages

    Monthly componentPilots on undesignated watersPilots on designated waters (undesignated × 150%)
    AGREEMENT A:
    $270.61 daily rate × 54.5 days$14,748$22,123
    AGREEMENT A:
    Monthly total × 9 months = total wages132,735199,103
    AGREEMENT B:
    $333.57 daily rate × 49.5 days16,51224,768
    AGREEMENT B:
    Monthly total × 9 months = total wages148,608222,912

    Both Agreements A and B include a health benefits contribution rate of $88.76 effective August 1, 2010. Agreement A includes a pension plan contribution rate of $33.35 per man-day. Agreement B includes a pension plan contribution rate of $43.55 per man-day. Both Agreements A and B provide a 401K employer matching rate, 5% of the wage rate. Neither Agreement A nor Agreement B includes a clerical contribution that appeared in earlier contracts. Per the AMOU, the multiplier used to calculate monthly benefits is 45.5 days.

    Table 9 shows new benefit calculations based on Agreements A and B, effective August 1, 2010, and Table 10 totals the figures in Tables 8 and 9.

    Table 9—Benefits

    Monthly componentPilots on undesignated watersPilots on designated waters
    AGREEMENT A:
    Employer contribution, 401(K) plan (Monthly Wages × 5%)$737.42$1,106.13
    Pension = $33.35 × 45.5 days1,517.431,517.43
    Health = $88.76 × 45.5 days4,038.584,038.58
    AGREEMENT B:
    Employer contribution, 401(K) plan (Monthly Wages × 5%)825.601,238.40
    Pension = $43.55 × 45.5 days1,981.531,981.53
    Health = $88.76 × 45.5 days4,038.584,038.58
    AGREEMENT A:
    Monthly total benefits= 6,293.42= 6,662.13
    AGREEMENT A:
    Monthly total benefits × 9 months= 56,641= 59,959
    AGREEMENT B:
    Monthly total benefits= 6,845.71= 7,258.51
    AGREEMENT B:
    Monthly total benefits × 9 months= 61,611= 65,327

    Table 10—Total Wages and Benefits

    Pilots on undesignated watersPilots on designated waters
    AGREEMENT A: Wages$132,735$199,103
    AGREEMENT A: Benefits+ 56,641+ 59,959
    AGREEMENT A: Total= 189,376= 259,062
    AGREEMENT B: Wages148,608222,912
    AGREEMENT B: Benefits+ 61,611+ 65,327
    AGREEMENT B: Total= 210,219= 288,239

    Table 11 shows that approximately one third of U.S. Great Lakes shipping deadweight tonnage operates under Agreement A, with the remaining two thirds operating under Agreement B.

    Table 11—Deadweight Tonnage by AMOU Agreement

    CompanyAgreement AAgreement B
    American Steamship Company815,600
    Mittal Steel USA, Inc.38,826
    Start Printed Page 7964
    Key Lakes, Inc.361,385
    Total tonnage, each agreement361,385854,426
    Percent tonnage, each agreement361,385 ÷ 1,215,811 = 29.7238%854,426 ÷ 1,215,811 = 70.2762%

    Table 12 applies the percentage of tonnage represented by each agreement to the wages and benefits provided by each agreement, to determine the projected target rate of compensation on a tonnage-weighted basis.

    Table 12—Projected Target Rate of Compensation, Weighted

    Undesignated watersDesignated waters
    AGREEMENT A:
    Total wages and benefits x percent tonnage$189,376 x 29.7238% = 56,290259,062 x 29.7238% = 77,003
    AGREEMENT B:
    Total wages and benefits x percent tonnage210,219 x 70.2762% = 147,734288,239 x 70.2762% = 202,563
    Total weighted average wages and benefits = projected target rate of compensation56,290 + 147,734 = 204,02477,003 + 202,563 = 279,566

    (b) Determine number of pilots needed. Subject to adjustment by the Coast Guard Director of Great Lakes Pilotage to ensure uninterrupted service, we determine the number of pilots needed for ratemaking purposes in each area by dividing each area's projected bridge hours, either by 1,000 (designated waters) or by 1,800 (undesignated waters).

    Bridge hours are the number of hours a pilot is aboard a vessel providing pilotage service. Projected bridge hours are based on the vessel traffic that pilots are expected to serve. Based on historical data and information provided by pilots and industry, we project that vessel traffic in the 2010 navigation season, in all areas, will remain unchanged from the 2009 projections noted in Table 13 of the 2009 final rule.

    Table 13, below, shows the projected bridge hours needed for each area, and the total number of pilots needed for ratemaking purposes after dividing those figures either by 1,000 or 1,800. As in 2008 and 2009, and for the same reasons, we rounded up to the next whole pilot except in Area 2 where we rounded up from 3.14 to 5, and in Area 4 where we rounded down from 4.07 to 4.

    Table 13—Number of Pilots Needed

    Pilotage areaProjected 2010 bridge hoursDivided by 1,000 (designated waters) or 1,800 (undesignated waters)Pilots needed (total = 40)
    Area 15,2031,0006
    Area 25,6501,8005
    Area 47,3201,8004
    Area 55,0971,0006
    Area 613,4061,8008
    Area 73,2591,0004
    Area 811,6301,8007

    (c) Determine the projected target pilot compensation for each area. The projection of new total target pilot compensation is determined separately for each pilotage area by multiplying the number of pilots needed in each area (see Table 13) by the projected target rate of compensation (see Table 12) for pilots working in that area. Table 14 shows this calculation.Start Printed Page 7965

    Table 14—Projected Target Pilot Compensation

    Pilotage areaPilots needed (total = 40)Multiplied by target rate of compensationProjected target pilot compensation
    Area 16x $279,566$1,677,397
    Area 25x 204,0241,020,120
    Total, District One11n/a2,697,517
    Area 44x 204,024816,096
    Area 56x 279,5661,677,397
    Total, District Two10n/a2,493,493
    Area 68x 204,0241,632,191
    Area 74x 279,5661,118,265
    Area 87x 204,0241,428,167
    Total, District Three19n/a4,178,623

    Step 4: Increase the projected pilot compensation in Step 3 by the expense multiplier in Step 2. This step yields a projected increase in operating costs necessary to support the increased projected pilot compensation. Table 15 shows this calculation.

    Table 15—Projected Operating Expense

    Pilotage areaProjected target pilot compensationMultiplied by expense multiplierProjected operating expense
    Area 1$1,677,397× 0.33927= $569,084
    Area 21,020,120× 0.57449= 586,050
    Total, District One2,697,517n/a= 1,155,134
    Area 4816,096× 0.67135= 547,886
    Area 51,677,397× 0.50729= 850,924
    Total, District Two2,493,493n/a= 1,398,810
    Area 61,632,191× 0.53926= 880,177
    Area 71,118,265× 0.38049= 425,493
    Area 81,428,167× 0.48087= 686,767
    Total, District Three4,178,623n/a= 1,992,438

    Step 5: Adjust the result in Step 4, as required, for inflation or deflation, and calculate projected total economic cost. Based on data from the U.S. Department of Labor's Bureau of Labor Statistics available at http://www.bls.gov/​xg_​shells/​ro5xg01.htm,, we have multiplied the results in Step 4 by a 1.037 inflation factor, reflecting an average inflation rate of 3.7% between 2007 and 2008, the latest years for which data are available. Table 16 shows this calculation and the projected total economic cost.

    Table 16—Projected Total Economic Cost

    Pilotage areaA. Projected operating expenseB. Increase, multiplied by inflation factor (= A × 1.037)C. Projected target pilot compensationD. Projected total economic cost (= B + C)
    Area 1$569,084$590,140$1,677,397$2,267,537
    Area 2586,050607,7331,020,1201,627,853
    Total, District One1,155,1341,197,8742,697,5173,895,390
    Area 4547,886568,158816,0961,384,253
    Area 5850,924882,4081,677,3972,559,805
    Total, District Two1,398,8101,450,5662,493,4933,944,058
    Area 6880,177912,7441,632,1912,544,935
    Area 7425,493441,2361,118,2651,559,501
    Area 8686,767712,1781,428,1672,140,345
    Total, District Three1,992,4382,066,1584,178,6236,244,781
    Start Printed Page 7966

    Step 6: Divide the result in Step 5 by projected bridge hours to determine total unit costs. Table 17 shows this calculation.

    Table 17—Total Unit Costs

    Pilotage areaA. Projected total economic costB. Projected 2009 bridge hoursProspective (total) unit costs (A divided by B)
    Area 1$2,267,5375,203$435.81
    Area 21,627,8535,650288.12
    Total, District One3,895,39010,853358.92
    Area 41,384,2537,320189.11
    Area 52,559,8055,097502.22
    Total, District Two3,944,05812,417317.63
    Area 62,544,93513,406189.84
    Area 71,559,5013,259478.52
    Area 82,140,34511,630184.04
    Total, District Three6,244,78128,29520.70
    Overall14,084,23051,565273.14

    Step 7: Divide prospective unit costs (total unit costs) in Step 6 by the base period unit costs in Step 1. Table 18 shows this calculation, which expresses the percentage change between the total unit costs and the base unit costs. The results, for each Area, are identical with the percentage increases listed in Table 1.

    Table 18—Percentage Change in Unit Costs

    Pilotage areaA. Prospective unit costsB. Base period unit costsC. Percentage change from base (A divided by B; result expressed as percentage)
    Area 1$435.81$416.474.65
    Area 2288.12273.545.33
    Total, District One358.92342.064.93
    Area 4189.11179.305.47
    Area 5502.22478.464.96
    Total, District Two317.63302.105.14
    Area 6189.84180.335.27
    Area 7478.52456.904.73
    Area 8184.04174.985.17
    Total, District Three220.70209.995.10
    Overall273.14259.975.07

    Step 8: Adjust the base period rates by the percentage change in unit costs in Step 7. Table 19 shows this calculation.

    Table 19—Base Period Rates Adjusted by Percentage Change in Unit Costs*

    PilotageA. Base period rateB. Percentage change in unit costsC. Increase in base rate (A × B%)D. Adjusted rate (A + C, rounded to nearest dollar)
    Area(Multiplying Factor)
    Area 1:4.65 (1.0465)
    —Basic pilotage$16.95/km, 29.99/mi$0.78/km, 1.39/mi$17.73/km, 31.38/mi
    —Each lock transited375.4717.44393
    —Harbor movage1,229.4157.111,287
    —Minimum basic rate, St. Lawrence River820.0438.09858
    —Maximum rate, through trip3,599.58167.203,767
    Area 2:5.33 (1.0533)
    —6-hr. period817.6343.56861
    Start Printed Page 7967
    —Docking or undocking779.9241.55821
    Area 4:5.47 (1.0547)
    —6 hr. period722.0539.49762
    —Docking or undocking556.4630.44587
    —Any point on Niagara River below Black Rock Lock1,420.4577.691,498
    Area 5 between any point on or in:4.96 (1.0496)
    —Toledo or any point on Lake Erie W. of Southeast Shoal1,299.4664.511,364
    —Toledo or any point on Lake Erie W. of Southeast Shoal & Southeast Shoal2,198.99109.162,308
    —Toledo or any point on Lake Erie W. of Southeast Shoal & Detroit River2,855.20141.742,997
    —Toledo or any point on Lake Erie W. of Southeast Shoal & Detroit Pilot Boat2,198.99109.162,308
    —Port Huron Change Point & Southeast Shoal (when pilots are not changed at the Detroit Pilot Boat)3,829.80190.124,020
    —Port Huron Change Point & Toledo or any point on Lake Erie W. of Southeast Shoal (when pilots are not changed at the Detroit Pilot Boat)4,436.82220.264,657
    —Port Huron Change Point & Detroit River2,877.20142.833,020
    —Port Huron Change Point & Detroit Pilot Boat2,237.82111.092,349
    —Port Huron Change Point & St. Clair River1,590.6878.971,670
    —St. Clair River1,299.4664.511,364
    —St. Clair River & Southeast Shoal (when pilots are not changed at the Detroit Pilot Boat)3,829.80190.124,020
    —St. Clair River & Detroit River/Detroit Pilot Boat2,877.20142.833,020
    —Detroit, Windsor, or Detroit River1,299.4664.511,364
    —Detroit, Windsor, or Detroit River & Southeast Shoal2,198.99109.162,308
    —Detroit, Windsor, or Detroit River & Toledo or any point on Lake Erie W. of Southeast Shoal2,855.20141.742,997
    —Detroit, Windsor, or Detroit River & St. Clair River2,877.20142.833,020
    —Detroit Pilot Boat & Southeast Shoal1,590.6878.971,670
    —Detroit Pilot Boat & Toledo or any point on Lake Erie W. of Southeast Shoal2,198.99109.162,308
    —Detroit Pilot Boat & St. Clair River2,877.20142.833,020
    Area 6:5.27 (1.0527)
    —6 hr. period622.9332.84656
    —Docking or undocking591.7231.20623
    Area 7 between any point on or in:4.73 (1.0473)
    —Gros Cap & De Tour2,442.98115.572,559
    —Algoma Steel Corp. Wharf, Sault Ste. Marie, Ont. & De Tour2,442.98115.572,559
    —Algoma Steel Corp. Wharf, Sault Ste. Marie, Ont. & Gros Cap920.0343.52964
    —Any point in Sault Ste. Marie, Ont., except the Algoma Steel Corp. Wharf & De Tour2,047.6796.872,145
    —Any point in Sault Ste. Marie, Ont., except the Algoma Steel Corp. Wharf & Gros Cap920.0343.52964
    —Sault Ste. Marie, MI & De Tour2,047.6796.872,145
    —Sault Ste. Marie, MI & Gros Cap920.0343.52964
    —Harbor movage920.0343.52964
    Area 8:5.17 (1.0517)
    —6 hr. period549.4428.42578
    —Docking or undocking522.2027.02549
    *Rates for “Cancellation, delay or interruption in rendering services (§ 401.420)” and “Basic Rates and charges for carrying a U.S. pilot beyond the normal change point, or for boarding at other than the normal boarding point (§ 401.428)” are not reflected in this table but have been increased by 5.07% across all areas.

    VI. Regulatory Analyses

    We developed this final rule after considering numerous statutes and executive orders related to rulemaking. Below, we summarize our analyses based on 13 of these statutes or executive orders.

    A. Regulatory Planning and Review

    Executive Order 12866, “Regulatory Planning and Review,” 58 FR 51735, October 4, 1993, requires a determination whether a regulatory action is “significant” and therefore subject to review by the Office of Management and Budget (OMB) and subject to the requirements of the Executive Order. This rulemaking is not significant under Executive Order 12866 and has not been reviewed by OMB.

    Public comments on the NPRM are summarized in Part IV of this publication. We received no public comments that would alter our assessment of the impacts discussed in the NPRM. We have adopted the Start Printed Page 7968assessment in the NPRM as final. See the “Regulatory Analyses” section of the NPRM for more details. A summary of the assessment follows.

    This final rule would implement a 5.07 percent overall rate adjustment for the Great Lakes system over the current rate as adjusted in the 2009 final rule. These adjustments to Great Lakes pilotage rates meet the requirements set forth in 46 CFR part 404 for similar compensation levels between Great Lakes pilots and industry. They also include adjustments for inflation and changes in association expenses to maintain these compensation levels.

    In general, we expect an increase in pilotage rates for a certain area to result in additional costs for shippers using pilotage services in that area, while a decrease would result in a cost reduction or savings for shippers in that area.

    The shippers affected by these rate adjustments are those owners and operators of domestic vessels operating on register (employed in the foreign trade) and owners and operators of foreign vessels on a route within the Great Lakes system. These owners and operators must have pilots or pilotage service as required by 46 U.S.C. 9302. There is no minimum tonnage limit or exemption for these vessels. However, the Coast Guard issued a policy position several years ago stating that the statute applies only to commercial vessels and not to recreational vessels.

    Owners and operators of other vessels that are not affected by this final rule, such as recreational boats and vessels only operating within the Great Lakes system, may elect to purchase pilotage services. However, this election is voluntary and does not affect the Coast Guard's calculation of the rate increase and is not a part of our estimated national cost to shippers.

    We used 2006-2008 vessel arrival data from the Coast Guard's Marine Information for Safety and Law Enforcement (MISLE) system to estimate the average annual number of vessels affected by the rate adjustment to be 208 vessels that journey into the Great Lakes system. These vessels entered the Great Lakes by transiting through or in part of at least one of the three pilotage districts before leaving the Great Lakes system. These vessels often make more than one distinct stop, docking, loading, and unloading at facilities in Great Lakes ports. Of the total trips for the 208 vessels, there were approximately 923 annual U.S. port arrivals before the vessels left the Great Lakes system.

    The impact of the rate adjustment to shippers is estimated from the district pilotage revenues. These revenues represent the direct and indirect costs (“economic costs”) that shippers must pay for pilotage services. The Coast Guard sets rates so that revenues equal the estimated cost of pilotage.

    We estimate the additional impact of the rate adjustment in this final rule to be the difference between the total projected revenue needed to cover costs based on the 2009 rate adjustment and the total projected revenue needed to cover costs in this final rule for 2010. Table 20 details additional costs by area and district.

    Table 20—Rate Adjustment and Additional Impact of Final Rule

    [$U.S.; non-discounted] 1

    Total projected expenses in 2009Proposed rate changeTotal projected expenses in 2010 2Additional revenue or cost of this rulemaking 3
    Area 1$2,166,8731.0465$2,267,537$100,664
    Area 21,545,5031.05331,627,85382,350
    Total, District One3,712,3763,895,390183,014
    Area 41,312,4631.05471,384,25371,791
    Area 52,438,7251.04962,559,805121,080
    Total, District Two3,751,1883,944,058192,870
    Area 62,417,4741.05272,544,935127,461
    Area 71,489,0521.04731,559,50170,449
    Area 82,035,0521.05172,140,345105,293
    Total, District Three5,941,5786,244,781303,203
    All Districts13,405,14214,084,230679,088
    1 Some values may not total due to rounding.
    2 Rate changes are calculated for areas only. District totals reflect arithmetic totals and are for informational and discussion purposes. See discussion in final rule for further details.
    3 Additional Revenue or Cost of this Rulemaking = `Total Projected Expenses in 2010'—`Total Projected Expenses in 2009'.

    After applying the rate change in this final rule, the resulting difference between the projected revenue in 2009 and the projected revenue in 2010 is the annual impact to shippers from this final rule. This figure will be equivalent to the total additional payments that shippers will incur for pilotage services from this rule.

    The impact of the rate adjustment in this final rule to shippers varies by area and district. The annual non-discounted costs of the rate adjustments in Districts 1, 2 and 3 would be approximately $183,000 and $193,000, and $303,000. To calculate an exact cost per vessel is difficult because of the variation in vessel types, routes, port arrivals, commodity carriage, time of season, conditions during navigation, and preferences for the extent of pilotage services on designated and undesignated portions of the Great Lakes system. Some owners and operators would pay more and some would pay less depending on the distance and port arrivals of their vessels' trips. However, the annual cost reported above does capture all of the additional cost the shippers face as a result of the rate adjustment in this rule.

    As Table 20 indicates, all areas will experience an increased annual cost due to this final rule. The overall impact of the final rule would be an additional cost to shippers of just over $679,000 across all three districts, due primarily to an increase in benchmark contractual wages and benefits and an inflation adjustment.Start Printed Page 7969

    B. Small Entities

    Under the Regulatory Flexibility Act (5 U.S.C. 601-612), we have considered whether this final rule would have a significant economic impact on a substantial number of small entities. The term “small entities” comprises small businesses, not-for-profit organizations that are independently owned and operated and are not dominant in their fields, and governmental jurisdictions with populations of less than 50,000 people.

    In the NPRM, we certified under 5 U.S.C. 605(b) that the proposed rule would not have a significant economic impact on a substantial number of small entities. We received no public comments that would alter our certification in the NPRM. We have found no additional data or information that would change our findings in the NPRM. We have adopted the certification in the NPRM for this final rule. See the “Small Entity” section of the NPRM for additional details. A summary of the NPRM analysis follows.

    We found entities affected by the rule to be classified under the North American Industry Classification System (NAICS) code subsector 483-Water Transportation, which includes one or all of the following 6-digit NAICS codes for freight transportation: 483111-Deep Sea Freight Transportation, 483113-Coastal and Great Lakes Freight Transportation, and 483211-Inland Water Freight Transportation. According to the Small Business Administration's definition, a U.S. company with these NAICS codes and employing less than 500 employees is considered a small entity.

    We reviewed company size and ownership data from 2006-2008 Coast Guard MISLE data and business revenue and size data provided by Reference USA and Dun and Bradstreet. We were able to gather revenue and size data or link the entities to large shipping conglomerates for 22 of the 24 affected entities in the United States. We found that large, mostly foreign-owned, shipping conglomerates or their subsidiaries owned or operated all vessels engaged in foreign trade on the Great Lakes. We assume that new industry entrants will be comparable in ownership and size to these shippers.

    There are three U.S. entities affected by the rule that receive revenue from pilotage services. These are the three pilot associations that provide and manage pilotage services within the Great Lakes districts. Two of the associations operate as partnerships and one operates as a corporation. These associations are classified with the same NAICS industry classification and small entity size standards described above, but they have far fewer than 500 employees: Approximately 65 total employees combined. We expect no adverse impact to these entities from this final rule since all associations receive enough revenue to balance the projected expenses associated with the projected number of bridge hours and pilots.

    Therefore, the Coast Guard has determined that this final rule would not have a significant economic impact on a substantial number of small entities under 5 U.S.C. 605(b).

    C. Assistance for Small Entities

    Under section 213(a) of the Small Business Regulatory Enforcement Fairness Act of 1996 (Pub. L. 104-121), we offer to assist small entities in understanding the final rule so that they could better evaluate its effects on them and participate in the rulemaking. The Coast Guard will not retaliate against small entities that question or complain about this rule or any policy or action of the Coast Guard.

    Small businesses may send comments on the actions of Federal employees who enforce, or otherwise determine compliance with, Federal regulations to the Small Business and Agriculture Regulatory Enforcement Ombudsman and the Regional Small Business Regulatory Fairness Boards. The Ombudsman evaluates these actions annually and rates each agency's responsiveness to small business. If you wish to comment on actions by employees of the Coast Guard, call 1-888-REG-FAIR (1-888-734-3247).

    D. Collection of Information

    This final rule would call for no new collection of information under the Paperwork Reduction Act of 1995 (44 U.S.C. 3501-3520). This rule does not change the burden in the collection currently approved by the Office of Management and Budget (OMB) under OMB Control Number 1625-0086, Great Lakes Pilotage Methodology.

    E. Federalism

    A rule has implications for federalism under Executive Order 13132, Federalism, if it has a substantial direct effect on State or local governments and would either preempt State law or impose a substantial direct cost of compliance on them. We have analyzed this rule under that Order and have determined that it does not have implications for federalism because there are no similar State regulations, and the States do not have the authority to regulate and adjust rates for pilotage services in the Great Lakes system.

    F. Unfunded Mandates Reform Act

    The Unfunded Mandates Reform Act of 1995 (2 U.S.C. 1531-1538) requires Federal agencies to assess the effects of their discretionary regulatory actions. In particular, the Act addresses actions that may result in the expenditure by a State, local, or tribal government, in the aggregate, or by the private sector of $100,000,000 or more in any one year. Though this rule would not result in such expenditure, we do discuss the effects of this rule elsewhere in this preamble.

    G. Taking of Private Property

    This rule would not affect a taking of private property or otherwise have taking implications under Executive Order 12630, Governmental Actions and Interference with Constitutionally Protected Property Rights.

    H. Civil Justice Reform

    This rule meets applicable standards in sections 3(a) and 3(b)(2) of Executive Order 12988, Civil Justice Reform, to minimize litigation, eliminate ambiguity, and reduce burden.

    I. Protection of Children

    We have analyzed this rule under Executive Order 13045, Protection of Children from Environmental Health Risks and Safety Risks. This rule is not an economically significant rule and does not create an environmental risk to health or risk to safety that may disproportionately affect children.

    J. Indian Tribal Governments

    This rule does not have tribal implications under Executive Order 13175, Consultation and Coordination with Indian Tribal Governments, because it does not have a substantial direct effect on one or more Indian tribes, on the relationship between the Federal Government and Indian tribes, or on the distribution of power and responsibilities between the Federal Government and Indian tribes.

    K. Energy Effects

    We have analyzed this rule under Executive Order 13211, Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use. We have determined that it is not a “significant energy action” under that order because it is not a “significant regulatory action” under Executive Order 12866 and is not likely to have a significant adverse effect on the supply, distribution, or use of energy. The Administrator of the Office Start Printed Page 7970of Information and Regulatory Affairs has not designated it as a significant energy action. Therefore, it does not require a Statement of Energy Effects under Executive Order 13211.

    L. Technical Standards

    The National Technology Transfer and Advancement Act (NTTAA) (15 U.S.C. 272 note) directs agencies to use voluntary consensus standards in their regulatory activities unless the agency provides Congress, through the Office of Management and Budget, with an explanation of why using these standards would be inconsistent with applicable law or otherwise impractical. Voluntary consensus standards are technical standards (e.g., specifications of materials, performance, design, or operation; test methods; sampling procedures; and related management systems practices) that are developed or adopted by voluntary consensus standards bodies. This rule does not use technical standards. Therefore, we did not consider the use of voluntary consensus standards.

    M. Environment

    We have analyzed this rule under Department of Homeland Security Management Directive 023-01 and Commandant Instruction M16475.lD, which guide the Coast Guard in complying with the National Environmental Policy Act of 1969 (NEPA) (42 U.S.C. 4321-4370f), and have concluded that this action is one of a category of actions which do not individually or cumulatively have a significant effect on the human environment. This rule is categorically excluded under section 2.B.2, figure 2-1, paragraph (34)(a) of the Instruction. Paragraph 34(a) pertains to minor regulatory changes that are editorial or procedural in nature. This rule adjusts rates in accordance with applicable statutory and regulatory mandates. An environmental analysis checklist and a categorical exclusion determination are available in the docket where indicated under ADDRESSES.

    Start List of Subjects

    List of Subjects in 46 CFR Part 401

    • Administrative practice and procedure
    • Great Lakes
    • Navigation (water)
    • Penalties
    • Reporting and recordkeeping requirements
    • Seamen
    End List of Subjects Start Amendment Part

    For the reasons discussed in the preamble, the Coast Guard amends 46 CFR part 401 as follows:

    End Amendment Part Start Part

    PART 401—GREAT LAKES PILOTAGE REGULATIONS

    End Part Start Amendment Part

    1. The authority citation for part 401 continues to read as follows:

    End Amendment Part Start Authority

    Authority: 46 U.S.C. 2104(a), 6101, 7701, 8105, 9303, 9304; Department of Homeland Security Delegation No. 0170.1; 46 CFR 401.105 also issued under the authority of 44 U.S.C. 3507.

    End Authority Start Amendment Part

    2. In § 401.405, revise paragraphs (a) and (b), including the footnote to Table (a), to read as follows:

    End Amendment Part
    Basic rates and charges on the St. Lawrence River and Lake Ontario.
    * * * * *

    (a) Area 1 (Designated Waters):

    ServiceSt. Lawrence River
    Basic Pilotage$17.73 per kilometer or $31.38 per mile 1
    Each Lock Transited393 1
    Harbor Movage1287 1
    1 The minimum basic rate for assignment of a pilot in the St. Lawrence River is $858, and the maximum basic rate for a through trip is $3,767.

    (b) Area 2 (Undesignated Waters):

    ServiceLake Ontario
    Six-Hour Period$861
    Docking or Undocking821
    * * * * *
    Start Amendment Part

    3. In § 401.407, revise paragraphs (a) and (b), including the footnote to Table (b), to read as follows:

    End Amendment Part
    Basic rates and charges on Lake Erie and the navigable waters from Southeast Shoal to Port Huron, MI.
    * * * * *

    (a) Area 4 (Undesignated Waters):

    ServiceLake Erie (East of Southeast Shoal)Buffalo
    Six-Hour Period$762$762
    Docking or Undocking587587
    Any Point on the Niagara River below the Black Rock LockN/A1,498

    (b) Area 5 (Designated Waters):

    Any point on or inSoutheast ShoalToledo or any Point on Lake Erie west of Southeast ShoalDetroit RiverDetroit Pilot BoatSt. Clair River
    Toledo or any port on Lake Erie west of Southeast Shoal$2,308$1,364$2,997$2,308N/A
    Port Huron Change Point1 4,0201 4,6573,0202,3491,670
    St. Clair River1 4,020N/A3,0203,0201,364
    Detroit or Windsor or the Detroit River2,3082,9971,364N/A3,020
    Detroit Pilot Boat1,6702,308N/AN/A3,020
    1 When pilots are not changed at the Detroit Pilot Boat.
    * * * * *
    Start Amendment Part

    4. In § 401.410, revise paragraphs (a), (b), and (c) to read as follows:

    End Amendment Part
    Basic rates and charges on Lakes Huron, Michigan, and Superior, and the St. Mary's River.
    * * * * *

    (a) Area 6 (Undesignated Waters):

    ServiceLakes Huron and Michigan
    Six-Hour Period$656
    Docking or Undocking623

    (b) Area 7 (Designated Waters):Start Printed Page 7971

    AreaDe TourGros CapAny harbor
    Gros Cap$2,559N/AN/A
    Algoma Steel Corporation Wharf at Sault Ste. Marie Ontario2,559$964N/A
    Any point in Sault Ste. Marie, Ontario, except the Algoma Steel Corporation Wharf2,145964N/A
    Sault Ste. Marie, MI2,145964N/A
    Harbor MovageN/AN/A$964

    (c) Area 8 (Undesignated Waters):

    ServiceLake Superior
    Six-Hour Period$578
    Docking or Undocking549
    * * * * *
    [Amended]
    Start Amendment Part

    5. In § 401.420—

    End Amendment Part Start Amendment Part

    a. In paragraph (a), remove the number “$113” and add, in its place, the number “$119”; and remove the number “$1,777” and add, in its place, the number “$1,867”.

    End Amendment Part Start Amendment Part

    b. In paragraph (b), remove the number “$113” and add, in its place, the number “$119”; and remove the number “$1,777” and add, in its place, the number “$1,867”.

    End Amendment Part Start Amendment Part

    c. In paragraph (c)(1), remove the number “$671” and add, in its place, the number “$705”; in paragraph (c)(3), remove the number “$113” and add, in its place, the number “$119”; and, also in paragraph (c)(3), remove the number “$1,777” and add, in its place, the number “$1,867”.

    End Amendment Part
    [Amended]
    Start Amendment Part

    6. In § 401.428, remove the number “$684” and add, in its place, the number “$719”.

    End Amendment Part Start Signature

    Dated: February 4, 2010.

    Kevin S. Cook,

    Rear Admiral, U.S. Coast Guard, Director of Prevention Policy.

    End Signature End Further Info End Preamble

    [FR Doc. 2010-3396 Filed 2-19-10; 11:15 am]

    BILLING CODE 4910-15-P

Document Information

Effective Date:
8/1/2010
Published:
02/23/2010
Department:
Coast Guard
Entry Type:
Rule
Action:
Final rule.
Document Number:
2010-3396
Dates:
This final rule is effective August 1, 2010.
Pages:
7958-7971 (14 pages)
Docket Numbers:
Docket No. USCG-2009-0883
RINs:
1625-AB39: Great Lakes Pilotage Rates--2010 Annual Review and Adjustment
RIN Links:
https://www.federalregister.gov/regulations/1625-AB39/great-lakes-pilotage-rates-2010-annual-review-and-adjustment
Topics:
Administrative practice and procedure, Great Lakes, Navigation (water), Penalties, Reporting and recordkeeping requirements, Seamen
PDF File:
2010-3396.pdf
CFR: (5)
46 CFR 401.405
46 CFR 401.407
46 CFR 401.410
46 CFR 401.420
46 CFR 401.428