-
Start Preamble
AGENCY:
Coast Guard, DHS.
ACTION:
Final rule.
SUMMARY:
The Coast Guard is adding a regulation to govern the Meridian and Bigbee Railroad (MNBR) vertical lift span bridge across the Tombigbee River at Naheola, Marengo and Choctaw Counties, Alabama. The bridge currently remains in the open-to-navigation position and only lowers for the passage of trains. This rule codifies the current schedule as a special operating regulation.
DATES:
This rule is effective October 17, 2012.
ADDRESSES:
Comments and related materials received from the public, as well as documents mentioned in this preamble as being available in the docket, are part of docket USCG-2012-0179 and are available online by going to http://www.regulations.gov,, inserting USCG-2012-0179 in the “Keyword” box, and then clicking “Search.” This material is also available for inspection or copying at the Docket Management Facility (M-30), U.S. Department of Transportation, West Building Ground Floor, Room W12-140, 1200 New Jersey Avenue SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
If you have questions on this final rule, call or email David Frank, Bridge Administration Branch; telephone 504-671-2128, email David.m.frank@uscg.mil. If you have questions on viewing or submitting material to the docket, call Renee V. Wright, Program Manager, Docket Operations, telephone 202-366-9826.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
Table of Acronyms
CFR Code of Federal Regulations
DHS Department of Homeland Security
FR Federal Register
NPRM Notice of Proposed Rulemaking
§ Section Symbol
U.S.C. United States Code
A. Regulatory History and Information
On May 1, 2012, we published a notice of proposed rulemaking (NPRM) entitled “Drawbridge Operation Regulation; Tombigbee River, AL” in the Federal Register (77 FR 25655). We received no comments on the proposed rule. No public meeting was requested, and none was held.
B. Basis and Purpose
The MNBR vertical lift span bridge crosses the Tombigbee River at mile 128.6 (Black Warrior Tombigbee Waterway mile 173.6), Naheola, Marengo and Choctaw Counties, Alabama. The bridge is currently maintained in the open-to-navigation position, closing only for the passage of rail traffic. The bridge has a vertical clearance of 12.2 feet above ordinary high water (OHW), elevation 64.5 feet, in the closed-to-navigation position and 55 feet above OHW in the open-to-navigation position. Many of the vessels using the waterway transit under a fixed span of the bridge at periods of lower water due to the difficulty of transiting the navigation span, which only has a horizontal clearance of 150 feet between piers.
Due to the limited number of trains using the rail line in this area, maintaining the bridge in the fully open-to-navigation position and only lowering the bridge for rail traffic is the preferred operating schedule. Because this operating schedule has been in place for over ten years, and is understood and accepted by local Start Printed Page 57025traffic, the bridge owner requested that the Coast Guard publish the current operating schedule. This operating schedule allows vessels to transit the waterway normally while permitting railroad personnel to lower the bridge for the passage of train traffic after ensuring that no vessels are approaching the bridge.
Maintaining the bridge untended and in the open-to-navigation position also eliminates the need for a bridge tender. This rule codifies the current bridge operating practice and brings it into compliance with 33 CFR part 117.41(b)(1).
C. Discussion of Comments, Changes and the Final Rule
As part of the NPRM process, a 60-day comment period was provided to allow for comments regarding the proposed change. No comments were received and no changes were made to the rule as proposed.
D. Regulatory Analyses
We developed this rule after considering numerous statutes and executive orders related to rulemaking. Below we summarize our analyses based on a number of these statutes or executive orders.
1. Regulatory Planning and Review
This rule is not a significant regulatory action under section 3(f) of Executive Order 12866, Regulatory Planning and Review, as supplemented by Executive Order 13563, Improving Regulation and Regulatory Review, and does not require an assessment of potential costs and benefits under section 6(a)(3) of Order 12866 or under section 1 of Executive Order 13563. The Office of Management and Budget has not reviewed it under those Orders.
This rule is not a significant regulatory action because it codifies the current operating schedule for the MNBR bridge which is already understood, known and accepted by the local bridge and waterway users. Very few vessels will be impacted as the bridge remains open at all times except to allow rail traffic to pass trains two times a day, five days a week.
2. Impact on Small Entities
The Regulatory Flexibility Act of 1980 (RFA), 5 U.S.C. 601-612, as amended, requires federal agencies to consider the potential impact of regulations on small entities during rulemaking. The term “small entities” comprises small businesses, not-for-profit organizations that are independently owned and operated and are not dominant in their fields, and governmental jurisdictions with populations of less than 50,000. The Coast Guard received no comments from the Small Business Administration on this rule. The Coast Guard certifies under 5 U.S.C. 605(b) that this rule will not have a significant economic impact on a substantial number of small entities.
This rule will affect the following entities, some of which might be small entities: The owners or operators of vessels wishing to transit the Tombigbee River above mile 128.6 with vessel air drafts that would require the bridge to be open to navigation for them to pass safely through the bridge site. This action will not have a significant economic impact on a substantial number of small entities because the bridge remains open at all times except to allow rail traffic to pass two times a day, five days a week.
This action will not have a significant economic impact on a substantial number of small entities because it only codifies the existing operation of the draw and there have been no documented economic impacts to small entities with regards to the present operation of the bridge.
3. Assistance for Small Entities
Under section 213(a) of the Small Business Regulatory Enforcement Fairness Act of 1996 (Public Law 104-121), we want to assist small entities in understanding this rule. If the rule would affect your small business, organization, or governmental jurisdiction and you have questions concerning its provisions or options for compliance, please contact the person listed in the FOR FURTHER INFORMATION CONTACT, above.
Small businesses may send comments on the actions of Federal employees who enforce, or otherwise determine compliance with, Federal regulations to the Small Business and Agriculture Regulatory Enforcement Ombudsman and the Regional Small Business Regulatory Fairness Boards. The Ombudsman evaluates these actions annually and rates each agency's responsiveness to small business. If you wish to comment on actions by employees of the Coast Guard, call 1-888-REG-FAIR (1-888-734-3247). The Coast Guard will not retaliate against small entities that question or complain about this rule or any policy or action of the Coast Guard.
4. Collection of Information
This rule calls for no new collection of information under the Paperwork Reduction Act of 1995 (44 U.S.C. 3501-3520).
5. Federalism
A rule has implications for federalism under Executive Order 13132, Federalism, if it has a substantial direct effect on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government. We have analyzed this rule under that Order and have determined that it does not have implications for federalism.
6. Protest Activities
The Coast Guard respects the First Amendment rights of protesters. Protesters are asked to contact the person listed in the For Further Information Contact section to coordinate protest activities so that your message can be received without jeopardizing the safety or security of people, places or vessels.
7. Unfunded Mandates Reform Act
The Unfunded Mandates Reform Act of 1995 (2 U.S.C. 1531-1538) requires Federal agencies to assess the effects of their discretionary regulatory actions. In particular, the Act addresses actions that may result in the expenditure by a State, local, or tribal government, in the aggregate, or by the private sector of $100,000,000 (adjusted for inflation) or more in any one year. Though this rule will not result in such an expenditure, we do discuss the effects of this rule elsewhere in this preamble.
8. Taking of Private Property
This rule will not cause a taking of private property or otherwise have taking implications under Executive Order 12630, Governmental Actions and Interference with Constitutionally Protected Property Rights.
9. Civil Justice Reform
This rule meets applicable standards in sections 3(a) and 3(b)(2) of Executive Order 12988, Civil Justice Reform, to minimize litigation, eliminate ambiguity, and reduce burden.
10. Protection of Children
We have analyzed this rule under Executive Order 13045, Protection of Children from Environmental Health Risks and Safety Risks. This rule is not an economically significant rule and does not create an environmental risk to health or risk to safety that might disproportionately affect children.
11. Indian Tribal Governments
This rule does not have tribal implications under Executive Order 13175, Consultation and Coordination with Indian Tribal Governments, Start Printed Page 57026because it does not have a substantial direct effect on one or more Indian tribes, on the relationship between the Federal Government and Indian tribes, or on the distribution of power and responsibilities between the Federal Government and Indian tribes.
12. Energy Effects
We have analyzed this rule under Executive Order 13211, Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use. We have determined that it is not a “significant energy action” under that order because it is not a “significant regulatory action” under Executive Order 12866 and is not likely to have a significant adverse effect on the supply, distribution, or use of energy. The Administrator of the Office of Information and Regulatory Affairs has not designated it as a significant energy action. Therefore, it does not require a Statement of Energy Effects under Executive Order 13211.
13. Technical Standards
This rule does not use technical standards. Therefore, we did not consider the use of voluntary consensus standards.
14. Environment
We have analyzed this rule under Department of Homeland Security Management Directive 023-01 and Commandant Instruction M16475.lD, which guides the Coast Guard in complying with the National Environmental Policy Act of 1969 (NEPA) (42 U.S.C. 4321-4370f), and have concluded that this action is one of a category of actions which do not individually or cumulatively have a significant effect on the human environment. This rule is categorically excluded, under figure 2-1, paragraph (32)(e), of the Instruction.
Under figure 2-1, paragraph (32)(e), of the Instruction, an environmental analysis checklist and a categorical exclusion determination are not required for this rule.
Start List of SubjectsList of Subjects in 33 CFR Part 117
- Bridges
For the reasons discussed in the preamble, the Coast Guard amends 33 CFR part 117 as follows:
Start PartPART 117—DRAWBRIDGE OPERATION REGULATIONS
End Part Start Amendment Part1. The authority citation for part 117 continues to read as follows:
End Amendment Part Start Amendment Part2. Section 117.118 is added to read as follows:
End Amendment PartTombigbee River.The draw of the Meridian and Bigbee Railroad (MNBR) vertical lift span bridge across the Tombigbee River, mile 128.6 (Black Warrior Tombigbee (BWT) Waterway mile 173.6), at Naheola, shall operate as follows:
(a) The draw shall be maintained in the fully open-to-navigation position for vessels at all times, except during periods when it is closed for the passage of rail traffic.
(b) When a train approaches the bridge, it will stop and a crewmember from the train will observe the waterway for approaching vessels. If vessels are observed approaching the bridge, they will be allowed to pass prior to lowering the bridge. The crewmember will then announce via radiotelephone on VHF-FM channel 16 that the bridge is preparing to be lowered. If, after two minutes, no response has been received, the crewmember will initiate the lowering sequence.
(c) After the train has completely passed over the bridge, the crewmember will initiate the raising sequence. When the bridge is in the fully open-to-navigation position, the crewmember will announce via radiotelephone on VHF-FM channel 16 that the bridge is in the fully open-to-navigation position.
(d) To request openings of the bridge when the lift span is in the closed-to-navigation position, mariners may contact the MNBR via VHF-FM channel 16 or by telephone at 205-654-4364.
Dated: August 25, 2012.
Roy A. Nash,
Rear Admiral, U.S. Coast Guard Commander, Eighth Coast Guard District.
[FR Doc. 2012-22775 Filed 9-14-12; 8:45 am]
BILLING CODE 9110-04-P
Document Information
- Comments Received:
- 0 Comments
- Effective Date:
- 10/17/2012
- Published:
- 09/17/2012
- Department:
- Coast Guard
- Entry Type:
- Rule
- Action:
- Final rule.
- Document Number:
- 2012-22775
- Dates:
- This rule is effective October 17, 2012.
- Pages:
- 57024-57026 (3 pages)
- Docket Numbers:
- Docket No. USCG-2012-0179
- RINs:
- 1625-AA09: Drawbridge Regulations
- RIN Links:
- https://www.federalregister.gov/regulations/1625-AA09/drawbridge-regulations
- Topics:
- Bridges
- PDF File:
- 2012-22775.pdf
- CFR: (1)
- 33 CFR 117.118