Start Preamble
AGENCY:
Federal Energy Regulatory Commission, DOE.
ACTION:
Notice of revised information collection and request for comments.[1]
SUMMARY:
In compliance with the requirements of the Paperwork Reduction Act of 1995, 44 U.S.C. 3506(c)(2)(A), the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collection FERC Form 80, Licensed Hydropower Development Recreation Report.
DATES:
Comments on the collection of information are due July 15, 2013.
ADDRESSES:
You may submit comments (identified by Docket No. IC13-14-000) by either of the following methods:
- eFiling at Commission's Web site: http://www.ferc.gov/docs-filing/efiling.asp.
- Mail/Hand Delivery/Courier: Federal Energy Regulatory Commission, Secretary of the Commission, 888 First Street NE., Washington, DC 20426.
Instructions: All submissions must be formatted and filed in accordance with submission guidelines at: http://www.ferc.gov/help/submission-guide.asp. For user assistance contact FERC Online Support by email at ferconlinesupport@ferc.gov, or by phone at: (866) 208-3676 (toll-free), or (202) 502-8659 for TTY.
Docket: Users interested in receiving automatic notification of activity in this docket or in viewing/downloading comments and issuances in this docket may do so at http://www.ferc.gov/docs-filing/docs-filing.asp.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Ellen Brown may be reached by email at DataClearance@FERC.gov, telephone at (202) 502-8663, and fax at (202) 273-0873.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
Title: FERC Form 80, Licensed Hydropower Development Recreation Report.
OMB Control No.: 1902-0106.
Type of Request: Minor revisions to the FERC Form 80 information collection. requirements with no change to the current reporting burden.
Abstract: FERC uses the information on the FERC Form 80 to implement the statutory provisions of sections 4(a), 10(a), 301(a), 304 and 309 of the Federal Power Act (FPA), 16 U.S.C. sections 797, 803, 825c & 8254. FERC's authority to collect this information comes from section 10(a) of the FPA which requires the Commission to be responsible for ensuring that hydro projects subject to FERC jurisdiction are consistent with the comprehensive development of the nation's waterway for recreation and other beneficial public uses. In the interest of fulfilling these objectives, FERC expects licensees subject to its jurisdiction to recognize the resources that are affected by their activities and to play a role in protecting such resources.
FERC Form 80 is a report on the use and development of recreational facilities at hydropower projects licensed by the Commission. Applications for licenses, amendments to licenses, and/or changes in land rights frequently involve changes in resources available for recreation. FERC utilizes the FERC Form 80 data when analyzing the adequacy of existing public recreational facilities and when processing and reviewing proposed Start Printed Page 28821amendments to help determine the impact of such changes. In addition, the FERC regional office staff uses the FERC Form 80 data when conducting inspections of licensed projects. FERC inspectors use the data in evaluating compliance with various license conditions and in identifying recreational facilities at hydropower projects.
The FERC Form 80 requires data specified by Title 18 of the Code of Federal Regulations (CFR) under §§ 8.11 and 141.14 (and discussed at http://www.ferc.gov/docs-filing/forms.asp#80).
FERC collects the FERC Form 80 once every six years. The last collection was due on April 1, 2009, for data compiled during the 2008 calendar year. The next collection of the FERC Form 80 is due on April 1, 2015, with subsequent collections due every sixth year, for data compiled during the previous calendar year.
The Commission made minor revisions throughout the form. Specifically, FERC clarified and simplified instructions, removed redundancy in certain questions, clarified questions and terms, and generally improved the readability of the form.
FERC has attached the revised form to this notice.
Type of Respondents: Hydropower project licensees.
Estimate of Annual Burden: [2] For each reporting period, FERC estimates the total Public Reporting Burden for this information collection as: (a) 1,000 respondents, (b) 0.167 response/respondent, and (c) 3 hours per response, giving a total of 501 burden hours. The Commission has increased its total number of respondents to reflect the actual numbers we received during the last two reporting periods. In addition, FERC spreads the burden hours and costs over the six-year collection cycle in the table below to reflect how the information is collected. The average burden hours per response remains unchanged. These are the figures FERC will submit to OMB.
FERC-80—Licensed Hydropower Development Recreation Report
Number of respondents Number of responses per respondent 3 Total number of responses Average burden hours per response Estimated total annual burden (A) (B) (A) × (B) = (C) (D) (C) × (D) 1,000 0.167 167 3 501 The total estimated annual cost burden to respondents is $35,070 [501 hours * $70/hour [4] = $35,070].
Comments: The Commission invites comments on: (1) Whether the collection of information is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency's estimate of the burden and cost of the collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collection; and (4) ways to minimize the burden of the collection of information on those who are to respond, including the use of automated collection techniques or other forms of information technology.
Start SignatureDated: May 8, 2013.
Kimberly D. Bose,
Secretary.
Revised Form Attached.
Start Printed Page 28822 Start Printed Page 28823 Start Printed Page 28824 Start Printed Page 28825 End Supplemental InformationFootnotes
1. This notice supersedes the notice issued on 4/18/2013 in this same docket, which was subsequently published in the Federal Register on 4/25/2013 (78 FR 24402).
Back to Citation2. FERC defines burden as the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a Federal agency. For further explanation of what is included in the information collection burden, reference 5 Code of Federal Regulations 1320.3.
Back to Citation3. FERC divides the responses per respondent by six because this collection occurs once every six years.
Back to Citation4. FY2013 Estimated Average Hourly Cost per FTE, including salary + benefits.
Back to Citation
Document Information
- Comments Received:
- 0 Comments
- Published:
- 05/16/2013
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Action:
- Notice of revised information collection and request for comments.\1\
- Document Number:
- 2013-11641
- Dates:
- Comments on the collection of information are due July 15, 2013.
- Pages:
- 28820-28825 (6 pages)
- Docket Numbers:
- Docket No. IC13-14-000
- PDF File:
- 2013-11641.pdf