2015-26935. Approval and Promulgation of Implementation Plans; Florida; Regional Haze Plan Amendment-Lakeland Electric C.D. McIntosh  

  • Start Preamble

    AGENCY:

    Environmental Protection Agency (EPA).

    ACTION:

    Final rule.

    SUMMARY:

    The Environmental Protection Agency (EPA) is finalizing approval of the State of Florida's March 10, 2015, State Implementation Plan (SIP) revision, submitted by the Florida Department of Environmental Protection (FDEP). This submittal fulfills Florida's commitment to EPA to provide a regional haze SIP revision with a Best Available Retrofit Technology (BART) nitrogen oxides (NOx) emissions limit for Unit 1 at the Lakeland Electric—C.D. McIntosh Power Plant (McIntosh) reflecting best operating practices for good combustion. States are required to address the BART provisions of the Clean Air Act (CAA or Act) and EPA's Start Printed Page 64345regional haze regulations as part of a program to prevent any future and remedy any existing anthropogenic impairment of visibility in mandatory Class I areas (national parks and wilderness areas) caused by emissions of air pollutants from numerous sources located over a wide geographic area (also referred to as the “regional haze program”) and to assure reasonable progress toward the national goal of achieving natural visibility conditions in Class I areas. In this action, EPA is approving the BART NOx emissions limit for Unit 1 at McIntosh into the Florida SIP.

    DATES:

    This rule is effective November 23, 2015.

    ADDRESSES:

    EPA has established a docket for this action under Docket Identification No. EPA-R04-OAR-2015-0337. All documents in the docket are listed on the www.regulations.gov Web site. Although listed in the index, some information may not be publicly available, i.e., Confidential Business Information or other information whose disclosure is restricted by statute. Certain other material, such as copyrighted material, is not placed on the Internet and will be publicly available only in hard copy form. Publicly available docket materials are available either electronically through www.regulations.gov or in hard copy at the Air Regulatory Management Section, Air Planning and Implementation Branch, Air, Pesticides and Toxics Management Division, U.S. Environmental Protection Agency, Region 4, 61 Forsyth Street, SW., Atlanta, Georgia 30303-8960. EPA requests that if at all possible, you contact the person listed in the FOR FURTHER INFORMATION CONTACT section to schedule your inspection. The Regional Office's official hours of business are Monday through Friday 8:30 a.m. to 4:30 p.m., excluding Federal holidays.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Michele Notarianni, Air Regulatory Management Section, Air Planning and Implementation Branch, Air, Pesticides and Toxics Management Division, U.S. Environmental Protection Agency, Region 4, 61 Forsyth Street SW., Atlanta, Georgia 30303-8960. Ms. Notarianni can be reached by phone at (404) 562-9031 or via electronic mail at notarianni.michele@epa.gov.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    I. Background

    On December 10, 2012, EPA proposed to approve the BART and reasonable progress determinations for a number of EGUs in Florida as part of Florida's regional haze SIP. See 77 FR 73369. In that action, EPA proposed approval of Florida's BART determination for emissions Units 1 and 2 at McIntosh found subject to BART. On August 29, 2013, EPA issued a final, full approval of Florida's regional haze SIP. See 78 FR 53250. In that final action, EPA approved the BART determination for the McIntosh facility, including the determination that the existing level of control for NOx at Unit 1, best operating practices for good combustion, is the NOx BART control for Unit 1. See 78 FR 53263. As described in the August 29, 2013, final action, FDEP submitted a letter to EPA dated July 30, 2013, in which the State committed to provide EPA with a regional haze SIP revision no later than March 19, 2015, the deadline for the State's five-year regional haze periodic progress report SIP, that would include a NOx BART emissions limit for Unit 1 reflecting best operating practices for good combustion. FDEP also committed to modify the title V permit for McIntosh to include this new limit.

    To fulfill its commitment in accordance with the July 30, 2013 letter, the State of Florida submitted a SIP revision dated March 10, 2015, revising the State's regional haze SIP to include a NOx BART emissions limit for McIntosh Unit 1 and a construction permit (FDEP Permit No. 1050004-034-AC) dated April 30, 2014, for Unit 1 containing this limit. The permit contains supporting conditions (e.g., monitoring requirements) and a condition specifying a schedule for McIntosh to apply for a revision to its title V permit to reflect the new permit conditions.

    In a notice of proposed rulemaking (NPR) published on August 20, 2015, EPA proposed to approve Florida's March 10, 2015, regional haze SIP revision fulfilling the State's July 20, 2013, commitment to provide EPA with a SIP revision containing a NOx BART emissions limit for McIntosh Unit 1 reflecting best operating practices for good combustion and conditions to modify the title V permit to incorporate this limit. See 80 FR 50591. The details of Florida's submittal and the rationale for EPA's actions are explained in the NPR. Comments on the proposed rulemaking were due on or before September 21, 2015. No adverse comments were received.

    II. Final Action

    EPA is finalizing approval of the State of Florida's March 10, 2015, SIP revision and revising the regional haze SIP to include the NOx BART emissions limit for Unit 1 and the April 30, 2014, construction permit containing this limit. EPA is approving these changes to the Florida SIP because the submission meets the applicable regional haze requirements as set forth in the CAA and in EPA's regional haze regulations and the applicable requirements of section 110 of the CAA.

    III. Statutory and Executive Order Reviews

    Under the CAA, the Administrator is required to approve a SIP submission that complies with the provisions of the Act and applicable Federal regulations. See 42 U.S.C. 7410(k); 40 CFR 52.02(a). Thus, in reviewing SIP submissions, EPA's role is to approve state choices, provided that they meet the criteria of the CAA. Accordingly, this action merely approves state law as meeting Federal requirements and does not impose additional requirements beyond those imposed by state law. For that reason, this action:

    • Is not a significant regulatory action subject to review by the Office of Management and Budget under Executive Orders 12866 (58 FR 51735, October 4, 1993) and 13563 (76 FR 3821, January 21, 2011);
    • does not impose an information collection burden under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.);
    • is certified as not having a significant economic impact on a substantial number of small entities under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.);
    • does not contain any unfunded mandate or significantly or uniquely affect small governments, as described in the Unfunded Mandates Reform Act of 1995 (Pub. L. 104-4);
    • does not have Federalism implications as specified in Executive Order 13132 (64 FR 43255, August 10, 1999);
    • is not an economically significant regulatory action based on health or safety risks subject to Executive Order 13045 (62 FR 19885, April 23, 1997);
    • is not a significant regulatory action subject to Executive Order 13211 (66 FR 28355, May 22, 2001);
    • is not subject to requirements of Section 12(d) of the National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) because application of those requirements would be inconsistent with the CAA; and
    • does not provide EPA with the discretionary authority to address, as appropriate, disproportionate human health or environmental effects, using practicable and legally permissible methods, under Executive Order 12898 (59 FR 7629, February 16, 1994).Start Printed Page 64346

    The SIP is not approved to apply on any Indian reservation land or in any other area where EPA or an Indian tribe has demonstrated that a tribe has jurisdiction. In those areas of Indian country, the rule does not have tribal implications as specified by Executive Order 13175 (65 FR 67249, November 9, 2000), nor will it impose substantial direct costs on tribal governments or preempt tribal law.

    The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the Small Business Regulatory Enforcement Fairness Act of 1996, generally provides that before a rule may take effect, the agency promulgating the rule must submit a rule report, which includes a copy of the rule, to each House of the Congress and to the Comptroller General of the United States. EPA will submit a report containing this action and other required information to the U.S. Senate, the U.S. House of Representatives, and the Comptroller General of the United States prior to publication of the rule in the Federal Register. A major rule cannot take effect until 60 days after it is published in the Federal Register. This action is not a “major rule” as defined by 5 U.S.C. 804(2).

    Under section 307(b)(1) of the CAA, petitions for judicial review of this action must be filed in the United States Court of Appeals for the appropriate circuit by December 22, 2015. Filing a petition for reconsideration by the Administrator of this final rule does not affect the finality of this action for the purposes of judicial review nor does it extend the time within which a petition for judicial review may be filed, and shall not postpone the effectiveness of such rule or action. This action may not be challenged later in proceedings to enforce its requirements. See section 307(b)(2).

    Start List of Subjects

    List of Subjects in 40 CFR Part 52

    • Environmental protection
    • Air pollution control
    • Carbon monoxide
    • Incorporation by reference
    • Intergovernmental relations
    • Lead
    • Nitrogen dioxide
    • Ozone
    • Particulate matter
    • Reporting and recordkeeping requirements
    • Sulfur oxides
    • Volatile organic compounds
    End List of Subjects Start Signature

    Dated: October 8, 2015.

    Heather McTeer Toney,

    Regional Administrator, Region 4.

    End Signature

    40 CFR part 52 is amended as follows:

    Start Part

    PART 52—APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS

    End Part Start Amendment Part

    1. The authority citation for part 52 continues to read as follows:

    End Amendment Part Start Authority

    Authority: 42.U.S.C. 7401 et seq.

    End Authority

    Subpart K—Florida

    Start Amendment Part

    2. Section 52.520(e) is amended by adding an entry for “Regional Haze Plan Amendment 3” at the end of the table to read as follows:

    End Amendment Part
    Identification of plan.
    * * * * *

    (e) * * *

    EPA-Approved Florida Non-Regulatory Provisions

    ProvisionState effective dateEPA approval dateFederal Register noticeExplanation
    *         *         *         *         *         *         *
    Regional Haze Plan Amendment 34/30/201410/23/2015 [Insert Federal Register citation][Insert Federal Register citation]Establishes NOX BART emissions limit for Unit 1 at the Lakeland Electric—C.D. McIntosh Power Plant and includes FDEP Permit No. 1050004-034-AC.
    End Supplemental Information

    [FR Doc. 2015-26935 Filed 10-22-15; 8:45 am]

    BILLING CODE 6560-50-P

Document Information

Effective Date:
11/23/2015
Published:
10/23/2015
Department:
Environmental Protection Agency
Entry Type:
Rule
Action:
Final rule.
Document Number:
2015-26935
Dates:
This rule is effective November 23, 2015.
Pages:
64344-64346 (3 pages)
Docket Numbers:
EPA-R04-OAR-2015-0337, FRL-9936-05-Region 4
Topics:
Air pollution control, Carbon monoxide, Environmental protection, Incorporation by reference, Intergovernmental relations, Lead, Nitrogen dioxide, Ozone, Particulate matter, Reporting and recordkeeping requirements, Sulfur oxides, Volatile organic compounds
PDF File:
2015-26935.pdf
Supporting Documents:
» CD McIntosh 2001 - 2003_07-01-2015
» 7-22-2015 Florida E-mail to EPA
» 07-30-2013 Florida Letter
» FL-SIP-2015-XX-Regional-Haze-Plan-McIntosh-Revision-Amended-Exhibit-2
» Florida SIP 2015-01_Regional Haze Plan_McIntosh Revision - Transmittal Letter
» Florida SIP 2015-01_Regional Haze Plan_McIntosh Revision - Submittal Package
» Florida SIP 2015-01_Regional Haze Plan_McIntosh Revision - Amended Plan
CFR: (1)
40 CFR 52.520